-
1
-
-
0028264716
-
Bounds on the time to reach agreement in the presence of timing uncertainty
-
Attiya, H., Dwork C., Lynch N. and Stockmeyer L., 1994, Bounds on the time to reach agreement in the presence of timing uncertainty. Journal of the Association for Computing Machinery, 41(1), 122-152.
-
(1994)
Journal of the Association for Computing Machinery
, vol.41
, Issue.1
, pp. 122-152
-
-
Attiya, H.1
Dwork, C.2
Lynch, N.3
Stockmeyer, L.4
-
2
-
-
0012063991
-
OR-parallelism in theorem proving: Speedups versus timeout
-
Buffoli, F., Degli Antoni, G. and Marchese, A., 1995, OR-parallelism in theorem proving: speedups versus timeout. Bulletin of the European Association for Theoretical Computer Science, no. 55, pp.158-65.
-
(1995)
Bulletin of the European Association for Theoretical Computer Science
, vol.55
, pp. 158-165
-
-
Buffoli, F.1
Degli Antoni, G.2
Marchese, A.3
-
3
-
-
0027884619
-
Queuing spin lock algorithms to support timing predictability
-
Raleigh, Durham, NC, USA, December
-
Craig, T. S., 1993, Queuing spin lock algorithms to support timing predictability. Proceeding of the Real-time System Symposium, Raleigh, Durham, NC, USA, December, pp. 148-157.
-
(1993)
Proceeding of the Real-Time System Symposium
, pp. 148-157
-
-
Craig, T.S.1
-
4
-
-
0027627867
-
Performance analysis of interconnected LANs with server/client configuration
-
Du, J., Deng, R. H. and Chi Chung Ko, 1993, Performance analysis of interconnected LANs with server/client configuration. Computer Networks and ISDN Systems, 25, 1321-1333.
-
(1993)
Computer Networks and ISDN Systems
, vol.25
, pp. 1321-1333
-
-
Du, J.1
Deng, R.H.2
Ko, C.C.3
-
6
-
-
0012556949
-
Analysis and application of the client-server model for integrations and collaboration in production testing
-
School of Industrial Engineering, Purdue University
-
Esfarjani, K. and Nof, S. Y., 1995, Analysis and application of the client-server model for integrations and collaboration in production testing. Research Memo No. 95-4, School of Industrial Engineering, Purdue University.
-
(1995)
Research Memo No. 95-4
-
-
Esfarjani, K.1
Nof, S.Y.2
-
7
-
-
0032290684
-
Client-server model of integrated production facilities
-
Esfarjani, K. and Nof, S. Y., 1998, Client-server model of integrated production facilities. International Journal of Production research, 36(12), 3295-3321.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.12
, pp. 3295-3321
-
-
Esfarjani, K.1
Nof, S.Y.2
-
8
-
-
6644219762
-
Dynamic timeouts and decisions in client server-based distributed systems
-
Ghoneim, S. K., 2000, Dynamic timeouts and decisions in client server-based distributed systems. International Journal of Modelling & Simulation, 20(1), 27-39.
-
(2000)
International Journal of Modelling & Simulation
, vol.20
, Issue.1
, pp. 27-39
-
-
Ghoneim, S.K.1
-
10
-
-
0028496656
-
On time-out for global deadlock detection in decentralized database systems
-
Hofri, M., 1994, On time-out for global deadlock detection in decentralized database systems. Information Processing Letters, 51 (6), 295-302.
-
(1994)
Information Processing Letters
, vol.51
, Issue.6
, pp. 295-302
-
-
Hofri, M.1
-
11
-
-
0028433869
-
Incorporation of optimal timeouts into distributed real-time load sharing
-
Hou, C. and Kang, G. S., 1994, Incorporation of optimal timeouts into distributed real-time load sharing. IEEE Transactions on Computers, 43(5), 528-547.
-
(1994)
IEEE Transactions on Computers
, vol.43
, Issue.5
, pp. 528-547
-
-
Hou, C.1
Kang, G.S.2
-
12
-
-
0027845344
-
Performance management of multiple access communication networks
-
Lee, S. and Asok, R., 1993, Performance management of multiple access communication networks. IEEE Journal on Selected Areas in Communications, 11, 1426-1437.
-
(1993)
IEEE Journal on Selected Areas in Communications
, vol.11
, pp. 1426-1437
-
-
Lee, S.1
Asok, R.2
-
13
-
-
0242358017
-
The benefit of information integration protocols for distributed production tasks
-
July, Jerusalem, Israel
-
Nof, S.Y., 1995, The benefit of information integration protocols for distributed production tasks. Proceedings of EURO XIV, July, Jerusalem, Israel.
-
(1995)
Proceedings of EURO XIV
-
-
Nof, S.Y.1
-
16
-
-
85039618119
-
Task allocation in multi-agent systems with a time-out protocol
-
School of Industrial Engineering, Purdue University
-
Peralta, J., Anussornnitisarn, P. and Nof, S. Y., 2001, Task allocation in multi-agent systems with a time-out protocol. Research Memo 2001-4, School of Industrial Engineering, Purdue University.
-
(2001)
Research Memo 2001-4
-
-
Peralta, J.1
Anussornnitisarn, P.2
Nof, S.Y.3
-
17
-
-
0004250813
-
TestLAN: An approach to integrated testing design
-
School of Industrial Engineering, Purdue University, July
-
Williams, N. P. and Nof, S. Y., 1995, TestLAN: an approach to integrated testing design. Research Memorandum 95-7, School of Industrial Engineering, Purdue University, July.
-
(1995)
Research Memorandum 95-7
-
-
Williams, N.P.1
Nof, S.Y.2
-
18
-
-
0004250812
-
The TestLAN approach to the design of testing systems
-
School of Industrial Engineering, December
-
Williams, N. P., 1994, The TestLAN approach to the design of testing systems. MSIE Purdue University, School of Industrial Engineering, December.
-
(1994)
MSIE Purdue University
-
-
Williams, N.P.1
|