-
1
-
-
0012556949
-
Analysis and application of the client-server model for integration and collaboration in production testing
-
Purdue University, School of Industrial Engineering
-
ESFARJANI, K. and NOF, S. Y., 1995, Analysis and application of the client-server model for integration and collaboration in production testing. Research Memorandum No. 4, Purdue University, School of Industrial Engineering.
-
(1995)
Research Memorandum
, vol.4
-
-
Esfarjani, K.1
Nof, S.Y.2
-
2
-
-
0032290684
-
Client-server model of integrated production facilities
-
ESFARJANI, K. and NOF, S. Y., 1998, Client-server model of integrated production facilities. International Journal of Production Research, 12, 3295-3321.
-
(1998)
International Journal of Production Research
, vol.12
, pp. 3295-3321
-
-
Esfarjani, K.1
Nof, S.Y.2
-
7
-
-
0026140291
-
Hierarchical performance evaluation based on formal specified communication protocols
-
HECK, E., HOGREFE, D. and MULLER, C. B., 1991, Hierarchical performance evaluation based on formal specified communication protocols. IEEE Transactions on Computers, 40, 500-513.
-
(1991)
IEEE Transactions on Computers
, vol.40
, pp. 500-513
-
-
Heck, E.1
Hogrefe, D.2
Muller, C.B.3
-
8
-
-
0026677426
-
Protocol design: Redefining the state of the art
-
HOLZMANN, H. J., 1992, Protocol design: redefining the state of the art. IEEE Software, 9, 17-22.
-
(1992)
IEEE Software
, vol.9
, pp. 17-22
-
-
Holzmann, H.J.1
-
9
-
-
0027579227
-
Design and validation of protocols: A tutorial
-
HOLZMANN, H. J., 1993, Design and validation of protocols: a tutorial. Computer Networks and ISDN Systems, 25, 981-1017.
-
(1993)
Computer Networks and ISDN Systems
, vol.25
, pp. 981-1017
-
-
Holzmann, H.J.1
-
10
-
-
0026140292
-
An integrated approach to design of protocol specification using protocol validation and synthesis
-
KAKUDA, Y. and HIRONORI, S., 1991, An integrated approach to design of protocol specification using protocol validation and synthesis. IEEE Transactions on Computers, 40, 459-467.
-
(1991)
IEEE Transactions on Computers
, vol.40
, pp. 459-467
-
-
Kakuda, Y.1
Hironori, S.2
-
11
-
-
0025808364
-
Genetic algorithm approach to a negotiation support system
-
MATWIN, S., SZAPIRO, T. and HAIGH, K., 1991, Genetic algorithm approach to a negotiation support system. IEEE Transactions on Computers, 21, 102-114.
-
(1991)
IEEE Transactions on Computers
, vol.21
, pp. 102-114
-
-
Matwin, S.1
Szapiro, T.2
Haigh, K.3
-
12
-
-
0012506622
-
Parallel and distributed models of integration in production systems
-
Jerusalem, Israel
-
NOF, S. Y., 1995, Parallel and distributed models of integration in production systems. Proceedings of the 13th ICPR, Jerusalem, Israel.
-
(1995)
Proceedings of the 13th ICPR
-
-
Nof, S.Y.1
-
13
-
-
12244269995
-
Models of e-work
-
Rio, Patras, Greece
-
NOF, S. Y., 2000, Models of e-work. Proceedings of IFAC-MIM 2000 Symposium on Manufacturing, Modeling, Management and Control, Rio, Patras, Greece.
-
(2000)
Proceedings of IFAC-MIM 2000 Symposium on Manufacturing, Modeling, Management and Control
-
-
Nof, S.Y.1
-
14
-
-
0003837472
-
-
MS thesis, School of Industrial Engineering, Purdue University, West Lafayette, IN, USA
-
PERALTA, J., 1996, Evaluation of time-out protocols in manufacturing systems. MS thesis, School of Industrial Engineering, Purdue University, West Lafayette, IN, USA.
-
(1996)
Evaluation of Time-Out Protocols in Manufacturing Systems
-
-
Peralta, J.1
-
16
-
-
0028112892
-
Architecture and a negotiation protocol for the dynamic scheduling of manufacturing systems
-
Piscataway, NJ
-
RAMOS, C., 1994, Architecture and a negotiation protocol for the dynamic scheduling of manufacturing systems. Proceedings of the 1994 IEEE Conference on Robotics and Automation, Piscataway, NJ, pp. 3161-3166.
-
(1994)
Proceedings of the 1994 IEEE Conference on Robotics and Automation
, pp. 3161-3166
-
-
Ramos, C.1
-
17
-
-
0020504370
-
Negotiation as a metaphor for distributed problem solving
-
RANDALL, D. and REID, G. S., 1983, Negotiation as a metaphor for distributed problem solving. Artificial Intelligence, 20, 63-109.
-
(1983)
Artificial Intelligence
, vol.20
, pp. 63-109
-
-
Randall, D.1
Reid, G.S.2
-
18
-
-
0023419094
-
A distributed scheduling method for computer integrated manufacturing: The use of local area networks in cellular systems
-
SHAW, M. J., 1987, A distributed scheduling method for computer integrated manufacturing: the use of local area networks in cellular systems. International Journal of Production Research, 25, 1285-1303.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1285-1303
-
-
Shaw, M.J.1
-
19
-
-
0012595570
-
FMS scheduling as cooperative problem solving
-
SHAW, M. J., 1989, FMS scheduling as cooperative problem solving. Annals of Operations Research, 17, 323-346.
-
(1989)
Annals of Operations Research
, vol.17
, pp. 323-346
-
-
Shaw, M.J.1
-
20
-
-
0004250812
-
-
MS thesis, School of Industrial Engineering, Purdue University, West Lafayette, IN, USA
-
WILLIAMS, N. P., 1994, The TestLAN approach to the design of testing systems. MS thesis, School of Industrial Engineering, Purdue University, West Lafayette, IN, USA.
-
(1994)
The TestLAN Approach to the Design of Testing Systems
-
-
Williams, N.P.1
-
21
-
-
0012550173
-
TestLAN: An approach to integrated testing systems design
-
School of Industrial Engineering, Purdue University, West Lafayette, IN, USA
-
WILLIAMS, N. P. and NOF, S. Y., 1995, TestLAN: an approach to integrated testing systems design. Research Memorandum No. 7, School of Industrial Engineering, Purdue University, West Lafayette, IN, USA.
-
(1995)
Research Memorandum
, vol.7
-
-
Williams, N.P.1
Nof, S.Y.2
|