메뉴 건너뛰기




Volumn 39, Issue 2, 1999, Pages 253-271

Off-line modelling and planning of optimal clamping forces for an intelligent fixturing system

(3)  Wang, Y F a   Wong, Y S a   Fuh, J Y H a  

a NONE

Author keywords

[No Author keywords available]

Indexed keywords

CONTROL; CUTTING; CUTTING EQUIPMENT; DEFORMATION; FLEXIBLE MANUFACTURING SYSTEMS; MATHEMATICAL MODELS;

EID: 0033078910     PISSN: 08906955     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0890-6955(98)00026-1     Document Type: Article
Times cited : (33)

References (25)
  • 7
    • 0002007079 scopus 로고
    • Phase-change fixturing for flexible manufacturing systems
    • Gandhi M.V., Thompson B.S. Phase-change fixturing for flexible manufacturing systems. Journal of Manfacturing Systems. 4(1):1985;29-39.
    • (1985) Journal of Manfacturing Systems , vol.4 , Issue.1 , pp. 29-39
    • Gandhi, M.V.1    Thompson, B.S.2
  • 9
    • 0003714980 scopus 로고
    • A reconfigurable fixturing system for robotic assembly
    • Chan K.C. A reconfigurable fixturing system for robotic assembly. Journal of Manufacturing Systems. 9(3):1990;206-221.
    • (1990) Journal of Manufacturing Systems , vol.9 , Issue.3 , pp. 206-221
    • Chan, K.C.1
  • 10
    • 0029659097 scopus 로고    scopus 로고
    • Development of a computer numerical control modular fixture-machine design of a standard multifinger module
    • Chan K.C., Lin C.S. Development of a computer numerical control modular fixture-machine design of a standard multifinger module. International Journal of Advanced Manufacturing Technology. 11:1996;18-26.
    • (1996) International Journal of Advanced Manufacturing Technology , vol.11 , pp. 18-26
    • Chan, K.C.1    Lin, C.S.2
  • 12
    • 0000517925 scopus 로고
    • Verification and optimization of workholding schemes for fixture design
    • Fuh J.Y.H., Nee A.Y.C. Verification and optimization of workholding schemes for fixture design. Journal of Design and Manufacturing. 4:1994;307-318.
    • (1994) Journal of Design and Manufacturing , vol.4 , pp. 307-318
    • Fuh, J.Y.H.1    Nee, A.Y.C.2
  • 17
    • 0022897638 scopus 로고
    • Automated design of modular fixtures for flexible manufacturing systems
    • Gandhi M.V., Thompson B.S. Automated design of modular fixtures for flexible manufacturing systems. Journal of Manufacturing Systems. 5(4):1986;243-252.
    • (1986) Journal of Manufacturing Systems , vol.5 , Issue.4 , pp. 243-252
    • Gandhi, M.V.1    Thompson, B.S.2
  • 20
    • 0028551914 scopus 로고
    • Automated verification of clamping stability in computer-aided fixture design
    • Rong Y., Wu S.H., Chu T. Automated verification of clamping stability in computer-aided fixture design. Computers in Engineering, ASME. 1:1994;421-426.
    • (1994) Computers in Engineering, ASME , vol.1 , pp. 421-426
    • Rong, Y.1    Wu, S.H.2    Chu, T.3
  • 22
    • 0025839057 scopus 로고
    • End milling force algorithms for CAD systems
    • Altintas Y., Spence A. End milling force algorithms for CAD systems. Annals of the CIRP. 40:1991;31-34.
    • (1991) Annals of the CIRP , vol.40 , pp. 31-34
    • Altintas, Y.1    Spence, A.2
  • 23
    • 0028462986 scopus 로고
    • Force prediction models and CAD/CAM software for helical tooth milling processes
    • Armarego E.J.A., Deshpande N.P. Force prediction models and CAD/CAM software for helical tooth milling processes. International Journal of Production Research. 32(7):1994;1715-1783.
    • (1994) International Journal of Production Research , vol.32 , Issue.7 , pp. 1715-1783
    • Armarego, E.J.A.1    Deshpande, N.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.