-
6
-
-
0020266322
-
Programmable conformable clamping
-
SME
-
M.R. Cutkosky, E. Kurokawa, P.K. Wright, Programmable conformable clamping, AUTOFACT 4 Conference Proceedings, SME, vol. 11, 1982, pp. 51-58.
-
(1982)
AUTOFACT 4 Conference Proceedings
, vol.11
, pp. 51-58
-
-
Cutkosky, M.R.1
Kurokawa, E.2
Wright, P.K.3
-
7
-
-
0002007079
-
Phase-change fixturing for flexible manufacturing systems
-
Gandhi M.V., Thompson B.S. Phase-change fixturing for flexible manufacturing systems. Journal of Manfacturing Systems. 4(1):1985;29-39.
-
(1985)
Journal of Manfacturing Systems
, vol.4
, Issue.1
, pp. 29-39
-
-
Gandhi, M.V.1
Thompson, B.S.2
-
8
-
-
0023831410
-
Autonomous fixture loading by a machine tool
-
ASME
-
F.B. Hazen, P.K. Wright, Autonomous fixture loading by a machine tool, Proceedings of Manufacturing International'88, ASME, vol. 3, 1988, pp. 105-111.
-
(1988)
Proceedings of Manufacturing International'88
, vol.3
, pp. 105-111
-
-
Hazen, F.B.1
Wright, P.K.2
-
9
-
-
0003714980
-
A reconfigurable fixturing system for robotic assembly
-
Chan K.C. A reconfigurable fixturing system for robotic assembly. Journal of Manufacturing Systems. 9(3):1990;206-221.
-
(1990)
Journal of Manufacturing Systems
, vol.9
, Issue.3
, pp. 206-221
-
-
Chan, K.C.1
-
10
-
-
0029659097
-
Development of a computer numerical control modular fixture-machine design of a standard multifinger module
-
Chan K.C., Lin C.S. Development of a computer numerical control modular fixture-machine design of a standard multifinger module. International Journal of Advanced Manufacturing Technology. 11:1996;18-26.
-
(1996)
International Journal of Advanced Manufacturing Technology
, vol.11
, pp. 18-26
-
-
Chan, K.C.1
Lin, C.S.2
-
12
-
-
0000517925
-
Verification and optimization of workholding schemes for fixture design
-
Fuh J.Y.H., Nee A.Y.C. Verification and optimization of workholding schemes for fixture design. Journal of Design and Manufacturing. 4:1994;307-318.
-
(1994)
Journal of Design and Manufacturing
, vol.4
, pp. 307-318
-
-
Fuh, J.Y.H.1
Nee, A.Y.C.2
-
17
-
-
0022897638
-
Automated design of modular fixtures for flexible manufacturing systems
-
Gandhi M.V., Thompson B.S. Automated design of modular fixtures for flexible manufacturing systems. Journal of Manufacturing Systems. 5(4):1986;243-252.
-
(1986)
Journal of Manufacturing Systems
, vol.5
, Issue.4
, pp. 243-252
-
-
Gandhi, M.V.1
Thompson, B.S.2
-
20
-
-
0028551914
-
Automated verification of clamping stability in computer-aided fixture design
-
Rong Y., Wu S.H., Chu T. Automated verification of clamping stability in computer-aided fixture design. Computers in Engineering, ASME. 1:1994;421-426.
-
(1994)
Computers in Engineering, ASME
, vol.1
, pp. 421-426
-
-
Rong, Y.1
Wu, S.H.2
Chu, T.3
-
22
-
-
0025839057
-
End milling force algorithms for CAD systems
-
Altintas Y., Spence A. End milling force algorithms for CAD systems. Annals of the CIRP. 40:1991;31-34.
-
(1991)
Annals of the CIRP
, vol.40
, pp. 31-34
-
-
Altintas, Y.1
Spence, A.2
-
23
-
-
0028462986
-
Force prediction models and CAD/CAM software for helical tooth milling processes
-
Armarego E.J.A., Deshpande N.P. Force prediction models and CAD/CAM software for helical tooth milling processes. International Journal of Production Research. 32(7):1994;1715-1783.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.7
, pp. 1715-1783
-
-
Armarego, E.J.A.1
Deshpande, N.P.2
|