메뉴 건너뛰기




Volumn 12, Issue 3, 2001, Pages 269-279

A virtual factory based approach to on-line simulation and scheduling for an FMS and a case study

Author keywords

Flexible manufacturing system; Limited expansion A algorithm; Mathematical analyses; Virtual factory

Indexed keywords

ASSEMBLY; COMPUTER INTEGRATED MANUFACTURING; COMPUTER SIMULATION; DATABASE SYSTEMS; FACTORY AUTOMATION; HEURISTIC METHODS; NUMERICAL ANALYSIS; OPTIMIZATION; RAPID PROTOTYPING; ROBOTICS; VIRTUAL REALITY;

EID: 0035360242     PISSN: 09565515     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1011201009821     Document Type: Article
Times cited : (14)

References (27)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.