메뉴 건너뛰기




Volumn 45, Issue 4, 2002, Pages 349-359

Public housing construction in hong kong: A review of its design and construction innovations

Author keywords

Construction process re engineering; Construction technologies; Design innovations; Hong Kong; Management principles; Public housing

Indexed keywords


EID: 0036903537     PISSN: 00038628     EISSN: 17589622     Source Type: Journal    
DOI: 10.1080/00038628.2002.9696950     Document Type: Article
Times cited : (19)

References (28)
  • 1
    • 85024019486 scopus 로고    scopus 로고
    • Effecting innovation through construction process re-engineering (CPR). Aasíratían
    • Chan, A.P.C. and Yu, A.T.W. (1999). Effecting innovation through construction process re-engineering (CPR). Aasíratían Institute of Building Papers, 9,7-16.
    • (1999) Institute of Building Papers , vol.9 , pp. 7-16
    • Chan, A.P.C.1    Yu, A.T.W.2
  • 3
    • 77958605130 scopus 로고    scopus 로고
    • Review of design and construction innovations in Hong Kong public housing
    • Faculty of Construction and Land Use, The Hong Kong Polytechnic University, 4-6 December 2002, Hong Kong, (in press)
    • Chan, D.W.M. and Chan, A.P.C. (2002). Review of design and construction innovations in Hong Kong public housing. Proceedings of the International Conference on Advances in Building Technology, Faculty of Construction and Land Use, The Hong Kong Polytechnic University, 4-6 December 2002, Hong Kong, (in press).
    • (2002) Proceedings of the International Conference on Advances in Building Technology
    • Chan, D.W.M.1    Chan, A.P.C.2
  • 4
    • 0040936199 scopus 로고
    • Effects of technology and site productivity on construction times of building projects in Hong Kong
    • American Society for Engineering Management, 21-23 September 1995, Washington DC, USA
    • Chan, D.W.M. and Kumaraswamy, M.M. (1995). Effects of technology and site productivity on construction times of building projects in Hong Kong, Proceedings of the 16th Annual ASEM Conference, American Society for Engineering Management, 21-23 September 1995, Washington DC, USA, 309-316.
    • (1995) Proceedings of the 16Th Annual ASEM Conference , pp. 309-316
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 5
    • 0030287181 scopus 로고    scopus 로고
    • An evaluation of construction time performance in the building industry
    • Chan, D.W.M. and Kumaraswamy, M.M. (1996). An evaluation of construction time performance in the building industry. Building and Environment, 31(6), 569-578.
    • (1996) Building and Environment , vol.31 , Issue.6 , pp. 569-578
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 6
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • Chan, D.W.M, and Kumaraswamy, M.M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), 55-63.
    • (1997) International Journal of Project Management , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.1    Kumaraswamy, M.M.2
  • 7
    • 0032774744 scopus 로고    scopus 로고
    • Modelling and predicting construction durations in Hong Kong public housing
    • Chan, D.W.M. and Kumaraswamy, M.M. (1999a). Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(3), 351-362.
    • (1999) Construction Management and Economics , vol.17 , Issue.3 , pp. 351-362
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 8
    • 0032628068 scopus 로고    scopus 로고
    • Forecasting construction durations for public housing projects: A Hong Kong perspective
    • Chan, D.W.M. and Kumaraswamy, M.M. (1999b). Forecasting construction durations for public housing projects: A Hong Kong perspective. Building and Environment, 34(5), 633-646.
    • (1999) Building and Environment , vol.34 , Issue.5 , pp. 633-646
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 9
    • 0036132114 scopus 로고    scopus 로고
    • Compressing construction durations: Lessons learned from Hong Kong building projects
    • Chan, D.W.M. and Kumaraswamy, M.M. (2002). Compressing construction durations: Lessons learned from Hong Kong building projects. International Journal of Project Management, 20(1), 23-35.
    • (2002) International Journal of Project Management , vol.20 , Issue.1 , pp. 23-35
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 10
    • 85024050351 scopus 로고    scopus 로고
    • Paper No. 7, Proceedings ofthe One Day Seminar on Fast Track Construction in Hong Kong, 5 May 1998, Hong Kong
    • Chan, N.C. and Lee, S.M. (1998). The 4-day cycle construction method at Tong Ming Court. Paper No. 7, Proceedings ofthe One Day Seminar on Fast Track Construction in Hong Kong, 5 May 1998, Hong Kong.
    • (1998) The 4-Day Cycle Construction Method at Tong Ming Court.
    • Chan, N.C.1    Lee, S.M.2
  • 12
    • 85024070571 scopus 로고    scopus 로고
    • Public housing-Precast construction
    • April 2001, Issue No. 2, China Trend Building Press Ltd., Hong Kong
    • Construction and Contract News (2001). Public housing-Precast construction. Construction and Contract News, April 2001, Issue No. 2, China Trend Building Press Ltd., Hong Kong, 42-51.
    • (2001) Construction and Contract News , pp. 42-51
  • 13
    • 85024079547 scopus 로고    scopus 로고
    • Continuous process improvement for shortening construction duration of public housing projects in Hong Kong
    • Deng, M., Tam, C.M. and Zeng, S.X. (1999). Continuous process improvement for shortening construction duration of public housing projects in Hong Kong. Australian ljistitute of BuildingPapers, 9,1728.
    • (1999) Australian Ljistitute of Buildingpapers , vol.9 , pp. 1728
    • Deng, M.1    Tam, C.M.2    Zeng, S.X.3
  • 14
    • 85024049558 scopus 로고    scopus 로고
    • Proceedings of the Project Management-Impresario of the Construction Industry Symposium, Department of Building and Real Estate, The Hong Kong Polytechnic University, 22-23 March 2002, Hong Kong
    • Ding, S.Z. (2002). Digitization and informatization of professional management of construction projects. Proceedings of the Project Management-Impresario of the Construction Industry Symposium, Department of Building and Real Estate, The Hong Kong Polytechnic University, 22-23 March 2002, Hong Kong, 12-20.
    • (2002) Digitization and Informatization of Professional Management of Construction Projects , pp. 12-20
    • Ding, S.Z.1
  • 15
    • 85024009136 scopus 로고    scopus 로고
    • Six to Four
    • Hong Kong Housing Authority (HKHA), Hong Kong, Volume 6, May 1998
    • HKHA (1998). Six to Four. House Talk, Hong Kong Housing Authority (HKHA), Hong Kong, Volume 6, May 1998,16-17.
    • (1998) House Talk , pp. 16-17
  • 16
    • 0003457025 scopus 로고    scopus 로고
    • Hong Kong Housing Authority (HKHA), Hong Kong
    • HKHA (1999). Annual Report 1998/1999, Hong Kong Housing Authority (HKHA), Hong Kong.
    • (1999) Annual Report 1998/1999
  • 17
    • 85024010077 scopus 로고    scopus 로고
    • Hong Kong Housing Authority (HKHA), Hong Kong
    • HKHA (2001). Annual Report2000/2001, Hong Kong Housing Authority (HKHA), Hong Kong.
    • (2001) Annual Report2000/2001
  • 18
    • 0003656231 scopus 로고
    • Technical Report No. 72, Centre for Integrated Facility Engineering, Department of Civil Engineering, Stanford University, USA
    • Koskela, L. (1992). Application of the New Production Philosophy to Construction. Technical Report No. 72, Centre for Integrated Facility Engineering, Department of Civil Engineering, Stanford University, USA.
    • (1992) Application of the New Production Philosophy to Construction
    • Koskela, L.1
  • 22
    • 0030181788 scopus 로고    scopus 로고
    • An evaluation of transportation systems for high-rise concrete construction
    • Proverbs, D.G., Olomolaiye, P.O. and Harris, F.C. (1996). An evaluation of transportation systems for high-rise concrete construction. Building and Environment, 31(4), 363-374.
    • (1996) Building and Environment , vol.31 , Issue.4 , pp. 363-374
    • Proverbs, D.G.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 24
    • 0345881437 scopus 로고    scopus 로고
    • Chapter 2: Adefinition of procurement systems
    • (edited by Steve Rowlinson and Peter McDermott), E & FN Spon, London, UK
    • Rowlinson, S. (1999). “Chapter 2: Adefinition of procurement systems”, In Procurement Systems-A Guide to Best Practice in Construction (edited by Steve Rowlinson and Peter McDermott), E & FN Spon, London, UK, 27-53.
    • (1999) Procurement Systems-A Guide to Best Practice in Construction , pp. 27-53
    • Rowlinson, S.1
  • 26
    • 44349111185 scopus 로고    scopus 로고
    • Speeding up and making more with modular construction
    • April 2002, Printers’ Circle Ltd., Hong Kong
    • Tam, A. (2002). Speeding up and making more with modular construction. Hong Kong Engineer, April 2002, Printers’ Circle Ltd., Hong Kong, 8-10.
    • (2002) Hong Kong Engineer , pp. 8-10
    • Tam, A.1
  • 28
    • 43149087002 scopus 로고    scopus 로고
    • Public housing construction in Hong Kong: From building traditionally to the era of rationalization
    • The Hong Kong Institution of Engineers (HKIE)
    • Wong, A.K.D. and Yau, A.S.K. (1999). Public housing construction in Hong Kong: From building traditionally to the era of rationalization. Group Proceedings: Group 1-Construction, The Hong Kong Institution of Engineers (HKIE), 2(1), 11-17.
    • (1999) Group Proceedings: Group 1-Construction , vol.2 , Issue.1 , pp. 11-17
    • Wong, A.K.D.1    Yau, A.S.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.