Forecasting construction durations for public housing projects: A Hong Kong perspective

Author keywords

[No Author keywords available]

Indexed keywords

BUILDINGS; CONSTRUCTION; REGRESSION ANALYSIS; STANDARDS;

EID: 0032628068     PISSN: 03601323     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0360-1323(98)00040-7     Document Type: Article
Times cited : (32)

References (32)
  • 1
    • 0002232162 scopus 로고
    • Contract time performance - expectation and the reality
    • Bromilow FJ. Contract time performance - expectation and the reality. Building Forum 1969; 1(3): 70-80.
    • (1969) Building Forum , vol.1 , Issue.3 , pp. 70-80
    • Bromilow, F.J.1
  • 2
    • 0004073479 scopus 로고
    • NEDO, National Economic Development Office, Millbank, London, U.K.
    • NEDO, Faster Building for Industry. National Economic Development Office, Millbank, London, U.K., 1983.
    • (1983) Faster Building for Industry
  • 3
    • 0003853476 scopus 로고
    • NEDO, National Economic Development Office, Millbank, London, U.K.
    • NEDO, Faster Building for Commerce. National Economic Development Office, Millbank, London, U.K., 1988.
    • (1988) Faster Building for Commerce
  • 7
    • 0000331042 scopus 로고
    • An investigation into construction time performance
    • Walker DHT. An investigation into construction time performance. Construction Management and Economics 1995; 13(3): 263-74.
    • (1995) Construction Management and Economics , vol.13 , Issue.3 , pp. 263-274
    • Walker, D.H.T.1
  • 8
    • 0001361084 scopus 로고
    • Relationship between value and duration of construction projects
    • Kaka A, Price ADF. Relationship between value and duration of construction projects. Construction Management and Economics 1991; 9(4): 383-400.
    • (1991) Construction Management and Economics , vol.9 , Issue.4 , pp. 383-400
    • Kaka, A.1    Price, A.D.F.2
  • 9
    • 0000896024 scopus 로고
    • Construction time information system for the building industry
    • Nkado RN. Construction time information system for the building industry. Construction Management and Economics 1992; 10(6): 489-509.
    • (1992) Construction Management and Economics , vol.10 , Issue.6 , pp. 489-509
    • Nkado, R.N.1
  • 11
    • 84948516864 scopus 로고
    • A study of the factors affecting construction durations in Hong Kong
    • Chan DWM, Kumaraswamy MM. A study of the factors affecting construction durations in Hong Kong. Construction Management and Economics 1995; 13(4): 319-33.
    • (1995) Construction Management and Economics , vol.13 , Issue.4 , pp. 319-333
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 12
    • 0040936199 scopus 로고
    • Effects of technology and site productivity on construction times of building projects in Hong Kong
    • American Society for Engineering Management, Washington D.C., U.S.A., 21-23 September
    • Chan DWM, Kumaraswamy MM. Effects of technology and site productivity on construction times of building projects in Hong Kong. Proceedings of the 16th Annual ASEM Conference, American Society for Engineering Management, Washington D.C., U.S.A., 21-23 September 1995, pp. 309-16.
    • (1995) Proceedings of the 16th Annual ASEM Conference , pp. 309-316
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 14
    • 0030182808 scopus 로고    scopus 로고
    • Estimation of project total cost and duration for housing projects in the U.K.
    • Khosrowshahi F, Kaka AP. Estimation of project total cost and duration for housing projects in the U.K. Building and Environment 1996; 31(4): 373-83.
    • (1996) Building and Environment , vol.31 , Issue.4 , pp. 373-383
    • Khosrowshahi, F.1    Kaka, A.P.2
  • 17
    • 0030287181 scopus 로고    scopus 로고
    • An evaluation of construction time performance in the building industry
    • Chan DWM, Kumaraswamy MM. An evaluation of construction time performance in the building industry. Building and Environment 1996; 31(6): 569-78.
    • (1996) Building and Environment , vol.31 , Issue.6 , pp. 569-578
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 18
    • 85034142572 scopus 로고    scopus 로고
    • Modelling and predicting construction durations in Hong Kong public housing
    • (Paper accepted for publication in on 8 January
    • Chan DWM, Kumaraswamy MM. Modelling and predicting construction durations in Hong Kong public housing. (Paper accepted for publication in Construction Management and Economics on 8 January 1998).
    • (1998) Construction Management and Economics
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 19
    • 0039750100 scopus 로고
    • Hong Kong Housing Authority, Housing Millions Hong Kong Housing authority, Hong Kong, October
    • Hong Kong Housing Authority, Housing Millions. Community Relations Section, Hong Kong Housing authority, Hong Kong, October 1995, p.21.
    • (1995) Community Relations Section , pp. 21
  • 20
    • 0038048011 scopus 로고
    • Case study methodology for construction management research
    • Association of Researchers in Construction Management, York, U.K., 18-20 September
    • Simister S. Case study methodology for construction management research. Proceedings of the 11th Annual ARCOM Conference, Association of Researchers in Construction Management, York, U.K., 18-20 September 1995, pp. 21-32.
    • (1995) Proceedings of the 11th Annual ARCOM Conference , pp. 21-32
    • Simister, S.1
  • 22
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • Chan DWM, Kumaraswamy MM. A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management 1997; 15(1): 55-63.
    • (1997) International Journal of Project Management , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 29
    • 0004014499 scopus 로고
    • Chichester, Sussex, U.K.: John Wiley and Sons
    • Gilchrist W. Statistical Modelling. Chichester, Sussex, U.K.: John Wiley and Sons, 1984.
    • (1984) Statistical Modelling
    • Gilchrist, W.1
  • 31
    • 0039157700 scopus 로고
    • SAS Institute Inc. 4th ed. U.S.A.: Cary, North Carolina
    • SAS Institute Inc. SAS/STAT Users Guide Version 6, Vol. 1. 4th ed. U.S.A.: Cary, North Carolina, 1990, p.12.
    • (1990) SAS/STAT Users Guide Version 6 , vol.1 , pp. 12
  • 32
    • 85034150408 scopus 로고
    • Constructtion productivity improvement in the South African construction industry
    • Association of Researchers in Construction Management, York, U.K., 18-20 September
    • Rwelamila PD, Harrod G. Constructtion productivity improvement in the South African construction industry. Proceedings of the 11th Annual ARCOM Conference, Association of Researchers in Construction Management, York, U.K., 18-20 September 1995, pp. 181-91.
    • (1995) Proceedings of the 11th Annual ARCOM Conference , pp. 181-191
    • Rwelamila, P.D.1    Harrod, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.