Volumn 17, Issue 3, 1999, Pages 351-362

Modelling and predicting construction durations in Hong Kong public housing

Author keywords

Construction durations; Hong Kong public housing; Modelling; Multiple linear regression; Predicting

Indexed keywords

CONSTRUCTION INDUSTRY; FORECASTING; LINEAR REGRESSION; MODELS; PILES; PREDICTIVE ANALYTICS;

EID: 0032774744     PISSN: 01446193     EISSN: None     Source Type: Journal    
DOI: 10.1080/014461999371556     Document Type: Article
Times cited : (39)

References (29)
  • 3
    • 0002232162 scopus 로고
    • Contract time performance - Expectation and the reality
    • Bromilow, F.J. (1969) Contract time performance - expectation and the reality, Building Forwn, 1(3), 70-80.
    • (1969) Building Forwn , vol.1 , Issue.3 , pp. 70-80
    • Bromilow, F.J.1
  • 6
    • 0040936199 scopus 로고
    • Effects of technology and site productivity on construction times of building projects in Hong Kong
    • American Society for Engineering Management, 21-23 September, Washington, DC
    • Chan, D.W.M. and Kumaraswamy, M.M. (1995b) Effects of technology and site productivity on construction times of building projects in Hong Kong, in Proceedings of the 16th Animal ASEM Conference, American Society for Engineering Management, 21-23 September, Washington, DC, pp. 309-16.
    • (1995) Proceedings of the 16th Animal ASEM Conference , pp. 309-316
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 9
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • Chan, D.W.M. and Kumaraswamy, M.M. (1997a) A comparative study of causes of time overruns in Hong Kong construction projects, International Journal of Project Management, 15(1), 55-63.
    • (1997) International Journal of Project Management , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 13
    • 0002969563 scopus 로고
    • Community Relations Section, Hong Kong Housing Authority, Hong Kong
    • HKHA (1995) Housing Millions, Community Relations Section, Hong Kong Housing Authority, Hong Kong.
    • (1995) Housing Millions
  • 15
    • 0001361084 scopus 로고
    • Relationship between value and duration of construction projects
    • Kaka, A.P. and Price, A.D.F. (1991) Relationship between value and duration of construction projects, Construction Management and Economics, 9(4), 383-400.
    • (1991) Construction Management and Economics , vol.9 , Issue.4 , pp. 383-400
    • Kaka, A.P.1    Price, A.D.F.2
  • 16
    • 0030182808 scopus 로고    scopus 로고
    • Estimation of project total cost and duration for housing projects in the UK
    • Khosrowshahi, F. and Kaka, A.P. (1996) Estimation of project total cost and duration for housing projects in the UK, Building and Environment, 31(4), 373-83.
    • (1996) Building and Environment , vol.31 , Issue.4 , pp. 373-383
    • Khosrowshahi, F.1    Kaka, A.P.2
  • 21
    • 0004073479 scopus 로고
    • National Economic Development Office, London
    • NEDO (1983) Faster Building for Industry, National Economic Development Office, London.
    • (1983) Faster Building for Industry
  • 22
    • 0003853476 scopus 로고
    • National Economic Development Office, London
    • NEDO (1988) Faster Building for Commerce, National Economic Development Office, London.
    • (1988) Faster Building for Commerce
  • 25
    • 0001849920 scopus 로고    scopus 로고
    • Communication and governance in the building process
    • Pietroforte, R. (1997) Communication and governance in the building process. Construction Management and Economics, 15(1), 71-82.
    • (1997) Construction Management and Economics , vol.15 , Issue.1 , pp. 71-82
    • Pietroforte, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.