메뉴 건너뛰기




Volumn 29, Issue 8, 2002, Pages 971-994

Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications

Author keywords

Flowshop; Maximum lateness; Multimedia; Scheduling; World Wide Web

Indexed keywords

HEURISTIC METHODS; MULTIMEDIA SYSTEMS; OPTIMIZATION;

EID: 0036643164     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0548(00)00097-6     Document Type: Article
Times cited : (32)

References (28)
  • 2
    • 0001537909 scopus 로고
    • On two-machine scheduling with release dates and due dates to minimize maximum lateness
    • (1980) Opsearch , vol.17 , pp. 133-154
    • Grabowski, J.1
  • 28


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.