-
3
-
-
17144404383
-
Instability of FIFO queuing networks
-
Mathematics Department, University of Wisconsin, Madison, WI
-
BRAMCON, M. 1993. Instability of FIFO Queuing Networks. Technical Report, Mathematics Department, University of Wisconsin, Madison, WI.
-
(1993)
Technical Report
-
-
Bramcon, M.1
-
4
-
-
0043210211
-
Johnson's three-machine flow shop conjecture
-
BURNS, F. AND J. ROOKER. 1976. Johnson's Three-machine Flow Shop Conjecture. Opns. Res. 24, 578-580.
-
(1976)
Opns. Res.
, vol.24
, pp. 578-580
-
-
Burns, F.1
Rooker, J.2
-
5
-
-
0005042158
-
Three stage flow shops with regressive second stage
-
BURNS, F. AND J. ROOKER. 1978. Three Stage Flow Shops with Regressive Second Stage. Opns. Res. 26, 207-208.
-
(1978)
Opns. Res.
, vol.26
, pp. 207-208
-
-
Burns, F.1
Rooker, J.2
-
8
-
-
0016952078
-
The complexity of flowshop and jobshop scheduling
-
GAREY, M. R., D. S. JOHNSON, AND R. SETHI. 1976. The Complexity of Flowshop and Jobshop Scheduling. Math. O.R. 1, 117-129.
-
(1976)
Math. O.R.
, vol.1
, pp. 117-129
-
-
Garey, M.R.1
Johnson, D.S.2
Sethi, R.3
-
9
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
GRAHAM, R. L., E. L. LAWLER, J. K. LENSTRA, AND A. H. G. RINNOOY KAN. 1979. Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey. Ann. Discrete Math. 5, 287-326.
-
(1979)
Ann. Discrete Math.
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
10
-
-
17144408167
-
-
Private correspondence
-
GUPTA, J. N. D. 1993. Private correspondence.
-
(1993)
-
-
Gupta, J.N.D.1
-
11
-
-
0003075019
-
Optimal two- and three-stage production schedules with setup times included
-
JOHNSON, S. M. 1954. Optimal Two- and Three-stage Production Schedules with Setup Times Included. Naval Res. Logist, l, 61-68.
-
(1954)
Naval Res. Logist
, vol.50
, pp. 61-68
-
-
Johnson, S.M.1
-
12
-
-
0030232128
-
Mean flow time minimization in reentrant jobshops with hub
-
KUBIAK, W., S. X. Lou, AND Y. WANG. 1996. Mean Flow Time Minimization in Reentrant Jobshops with Hub. Opns. Res. 44, 764-776.
-
(1996)
Opns. Res.
, vol.44
, pp. 764-776
-
-
Kubiak, W.1
Lou, S.X.2
Wang, Y.3
-
14
-
-
0025401166
-
Dynamic instabilities and stabilization methods in distributed Real-time scheduling of manufacturing systems
-
KUMAR, P. R. AND T. I. SEIDMAN. 1990. Dynamic Instabilities and Stabilization Methods in Distributed Real-time Scheduling of Manufacturing Systems. IEEE Trans. Automatic Control AC-35, 289-298.
-
(1990)
IEEE Trans. Automatic Control
, vol.AC-35
, pp. 289-298
-
-
Kumar, P.R.1
Seidman, T.I.2
-
16
-
-
0026395588
-
Using simulation to test the robustness of various existing production control policies
-
Lou, S. X. C., H. YAN, S. SETHI, A. GARDEL, AND P. DEOSTHALI. 1991. Using Simulation to Test the Robustness of Various Existing Production Control Policies. Proceedings of Winter Simulation Conference, 261-269.
-
(1991)
Proceedings of Winter Simulation Conference
, pp. 261-269
-
-
Lou, S.X.C.1
Yan, H.2
Sethi, S.3
Gardel, A.4
Deosthali, P.5
|