Volumn 45, Issue 5, 1997, Pages 702-712

Minimizing makespan in a class of reentrant shops

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; APPROXIMATION THEORY; COMPUTATIONAL COMPLEXITY; OPTIMIZATION; POLYNOMIALS; PROBLEM SOLVING; SCHEDULING;

EID: 0031221554     PISSN: 0030364X     EISSN: None     Source Type: Journal    
DOI: 10.1287/opre.45.5.702     Document Type: Article
Times cited : (107)

References (16)
  • 3
    • 17144404383 scopus 로고
    • Instability of FIFO queuing networks
    • Mathematics Department, University of Wisconsin, Madison, WI
    • BRAMCON, M. 1993. Instability of FIFO Queuing Networks. Technical Report, Mathematics Department, University of Wisconsin, Madison, WI.
    • (1993) Technical Report
    • Bramcon, M.1
  • 4
    • 0043210211 scopus 로고
    • Johnson's three-machine flow shop conjecture
    • BURNS, F. AND J. ROOKER. 1976. Johnson's Three-machine Flow Shop Conjecture. Opns. Res. 24, 578-580.
    • (1976) Opns. Res. , vol.24 , pp. 578-580
    • Burns, F.1    Rooker, J.2
  • 5
    • 0005042158 scopus 로고
    • Three stage flow shops with regressive second stage
    • BURNS, F. AND J. ROOKER. 1978. Three Stage Flow Shops with Regressive Second Stage. Opns. Res. 26, 207-208.
    • (1978) Opns. Res. , vol.26 , pp. 207-208
    • Burns, F.1    Rooker, J.2
  • 8
    • 0016952078 scopus 로고
    • The complexity of flowshop and jobshop scheduling
    • GAREY, M. R., D. S. JOHNSON, AND R. SETHI. 1976. The Complexity of Flowshop and Jobshop Scheduling. Math. O.R. 1, 117-129.
    • (1976) Math. O.R. , vol.1 , pp. 117-129
    • Garey, M.R.1    Johnson, D.S.2    Sethi, R.3
  • 9
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • GRAHAM, R. L., E. L. LAWLER, J. K. LENSTRA, AND A. H. G. RINNOOY KAN. 1979. Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey. Ann. Discrete Math. 5, 287-326.
    • (1979) Ann. Discrete Math. , vol.5 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Rinnooy Kan, A.H.G.4
  • 10
    • 17144408167 scopus 로고
    • Private correspondence
    • GUPTA, J. N. D. 1993. Private correspondence.
    • (1993)
    • Gupta, J.N.D.1
  • 11
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • JOHNSON, S. M. 1954. Optimal Two- and Three-stage Production Schedules with Setup Times Included. Naval Res. Logist, l, 61-68.
    • (1954) Naval Res. Logist , vol.50 , pp. 61-68
    • Johnson, S.M.1
  • 12
    • 0030232128 scopus 로고    scopus 로고
    • Mean flow time minimization in reentrant jobshops with hub
    • KUBIAK, W., S. X. Lou, AND Y. WANG. 1996. Mean Flow Time Minimization in Reentrant Jobshops with Hub. Opns. Res. 44, 764-776.
    • (1996) Opns. Res. , vol.44 , pp. 764-776
    • Kubiak, W.1    Lou, S.X.2    Wang, Y.3
  • 14
    • 0025401166 scopus 로고
    • Dynamic instabilities and stabilization methods in distributed Real-time scheduling of manufacturing systems
    • KUMAR, P. R. AND T. I. SEIDMAN. 1990. Dynamic Instabilities and Stabilization Methods in Distributed Real-time Scheduling of Manufacturing Systems. IEEE Trans. Automatic Control AC-35, 289-298.
    • (1990) IEEE Trans. Automatic Control , vol.AC-35 , pp. 289-298
    • Kumar, P.R.1    Seidman, T.I.2