메뉴 건너뛰기




Volumn 39, Issue 17, 2001, Pages 3901-3921

An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; CONTROL SYSTEM SYNTHESIS; FACTORY AUTOMATION; LIQUID CRYSTAL DISPLAYS; MATERIALS HANDLING EQUIPMENT; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 0035923925     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540110056261     Document Type: Article
Times cited : (29)

References (32)
  • 1
    • 0031506199 scopus 로고    scopus 로고
    • Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates
    • Chand, S., Traub, R. and Uzsoy, R., 1997, Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates. Annals of Operations Research, 70, 115-125.
    • (1997) Annals of Operations Research , vol.70 , pp. 115-125
    • Chand, S.1    Traub, R.2    Uzsoy, R.3
  • 3
    • 0345504726 scopus 로고    scopus 로고
    • Design and operation of single-loop dual-rail inter-bay material handling system
    • Chen, M.-T., McGinnis, L. and Zhou, C., 1999, Design and operation of single-loop dual-rail inter-bay material handling system. International Journal of Production Research, 37, (10), 2217-2237.
    • (1999) International Journal of Production Research , vol.37 , Issue.10 , pp. 2217-2237
    • Chen, M.-T.1    McGinnis, L.2    Zhou, C.3
  • 4
    • 0023169920 scopus 로고
    • The scheduling of flexible manufacturing system
    • Doulgeri, Z., Hibberd, R. D. and Husband, T. M., 1987, The scheduling of flexible manufacturing system. CIRP, 36 (1), 343-346.
    • (1987) CIRP , vol.36 , Issue.1 , pp. 343-346
    • Doulgeri, Z.1    Hibberd, R.D.2    Husband, T.M.3
  • 8
    • 0010771203 scopus 로고    scopus 로고
    • A look-ahead routing procedure for machine selection in a highly informative manufacturing system (HIMS)
    • accepted for publication
    • Jang, J., Suh, J. and Liu, C. R., 2000, A look-ahead routing procedure for machine selection in a highly informative manufacturing system (HIMS). International Journal of Flexible Manufacturing Systems, accepted for publication.
    • (2000) International Journal of Flexible Manufacturing Systems
    • Jang, J.1    Suh, J.2    Liu, C.R.3
  • 9
    • 0010907416 scopus 로고
    • The operation of an automated guided vehicle system in a manufacturing job shop
    • PhD thesis, Purdue University, West Lafayette, Indiana, USA
    • Kim, C., 1991, The operation of an automated guided vehicle system in a manufacturing job shop. PhD thesis, Purdue University, West Lafayette, Indiana, USA.
    • (1991)
    • Kim, C.1
  • 10
    • 0025430088 scopus 로고
    • A comparison of dispatching rules for job shops with multiple identical jobs and alternative routings
    • Kim, Y. D., 1990, A comparison of dispatching rules for job shops with multiple identical jobs and alternative routings. International Journal of Production Research, 28(5), 953-962.
    • (1990) International Journal of Production Research , vol.28 , Issue.5 , pp. 953-962
    • Kim, Y.D.1
  • 13
    • 0030182638 scopus 로고    scopus 로고
    • Dispatching, routing, and scheduling of two automated guided vehicles in a flexible manufacturing system
    • Langevin, A., Lauzon, D. and Riopel, D., 1996, Dispatching, routing, and scheduling of two automated guided vehicles in a flexible manufacturing system. International Journal of Flexible Manufacturing Systems, 8, 247-262.
    • (1996) International Journal of Flexible Manufacturing Systems , vol.8 , pp. 247-262
    • Langevin, A.1    Lauzon, D.2    Riopel, D.3
  • 14
    • 0001130388 scopus 로고
    • An algorithm for routing control of a tandem automated guided vehicle system
    • Lin, J. T. and Dgen, P.-K., 1994, An algorithm for routing control of a tandem automated guided vehicle system. International Journal of Production Research, 32(12), 2735-2750.
    • (1994) International Journal of Production Research , vol.32 , Issue.12 , pp. 2735-2750
    • Lin, J.T.1    Dgen, P.-K.2
  • 15
    • 0000699496 scopus 로고
    • Effectiveness of flexible routing control
    • Lin, G. Y. and Solberg, J. J., 1991, Effectiveness of flexible routing control. International Journal of FMS, 3, 189-211.
    • (1991) International Journal of FMS , vol.3 , pp. 189-211
    • Lin, G.Y.1    Solberg, J.J.2
  • 16
    • 0010841172 scopus 로고
    • Part flow orchestration in distributed manufacturing processing
    • PhD Thesis, Purdue University, Indiana, USA
    • Maley, J. G., 1987, Part flow orchestration in distributed manufacturing processing. PhD Thesis, Purdue University, Indiana, USA.
    • (1987)
    • Maley, J.G.1
  • 19
    • 0001242514 scopus 로고
    • Launching and dispatching strategies for multi-criteria control of closed manufacturing systems with flexible routing capability
    • Piplani, R. and Talavage, J. J., 1995, Launching and dispatching strategies for multi-criteria control of closed manufacturing systems with flexible routing capability. International Journal of Production Research, 33 (8), 2181-2196.
    • (1995) International Journal of Production Research , vol.33 , Issue.8 , pp. 2181-2196
    • Piplani, R.1    Talavage, J.J.2
  • 21
    • 0030270156 scopus 로고    scopus 로고
    • On the robustness of using balanced part mix ratios to determine cycle part input sequences into flexible flow systems
    • Smith, T. M. and Stecke, K. E., 1996, On the robustness of using balanced part mix ratios to determine cycle part input sequences into flexible flow systems. International Journal of Production Research, 34(10), 2925-2942.
    • (1996) International Journal of Production Research , vol.34 , Issue.10 , pp. 2925-2942
    • Smith, T.M.1    Stecke, K.E.2
  • 22
    • 0029389278 scopus 로고
    • Comparison of dynamic routing techniques for automated guided vehicle system
    • Taghaboni-Dutta, F. and Tanchoco, J. M. A., 1995, Comparison of dynamic routing techniques for automated guided vehicle system. International Journal of Production Research, 33 (10), 2653-2669.
    • (1995) International Journal of Production Research , vol.33 , Issue.10 , pp. 2653-2669
    • Taghaboni-Dutta, F.1    Tanchoco, J.M.A.2
  • 23
    • 0027845081 scopus 로고
    • Simultaneous scheduling of machines and automated guided vehicles
    • Ulusoy, G. and Bilge, U., 1993, Simultaneous scheduling of machines and automated guided vehicles, International Journal of Production Research, 31, (12), 2857-2873.
    • (1993) International Journal of Production Research , vol.31 , Issue.12 , pp. 2857-2873
    • Ulusoy, G.1    Bilge, U.2
  • 24
    • 0031124354 scopus 로고    scopus 로고
    • A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
    • Ulusoy, G. and Bilge, U., 1997, A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles, Computers and Operations Research, 24(4), 335-351.
    • (1997) Computers and Operations Research , vol.24 , Issue.4 , pp. 335-351
    • Ulusoy, G.1    Bilge, U.2
  • 25
    • 0003419305 scopus 로고
    • The operation of large computer controlled manufacturing systems
    • PhD Thesis, Purdue University, Indiana, USA
    • Upton, D. M., 1988, The operation of large computer controlled manufacturing systems. PhD Thesis, Purdue University, Indiana, USA.
    • (1988)
    • Upton, D.M.1
  • 26
    • 0003726211 scopus 로고
    • Physical resource management in large computer-controlled manufacturing systems
    • PhD Thesis, Purdue University, Indiana, USA
    • Veeramani, R., 1991, Physical resource management in large computer-controlled manufacturing systems. PhD Thesis, Purdue University, Indiana, USA.
    • (1991)
    • Veeramani, R.1
  • 27
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • Vepsalainen, A. P. J. and Morton, T. E., 1987, Priority rules for job shops with weighted tardiness costs. Management Science. 33(8), 1035-1047.
    • (1987) Management Science , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2
  • 28
    • 0025671258 scopus 로고
    • Deadlock prevention and deadlock avoidance in flexible manufacturing systems using Petri nets
    • Viswanadham, N., Narahari, Y. and Johnson, T., 1990, Deadlock prevention and deadlock avoidance in flexible manufacturing systems using Petri nets. IEEE Transactions on Robotics and Automation, 6(6), 712-723.
    • (1990) IEEE Transactions on Robotics and Automation , vol.6 , Issue.6 , pp. 712-723
    • Viswanadham, N.1    Narahari, Y.2    Johnson, T.3
  • 30
    • 0028599897 scopus 로고
    • Resolution of deadlocks in flexible manufacturing systems: Avoidance and recovery approaches
    • Wysk, R., Yang, N., and Joshi, S., 1994, Resolution of deadlocks in flexible manufacturing systems: avoidance and recovery approaches. Journal of Manufacturing Systems, 13(2), 128-138.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.2 , pp. 128-138
    • Wysk, R.1    Yang, N.2    Joshi, S.3
  • 31
    • 0025398941 scopus 로고
    • Flexible parts routing in manufacturing systems
    • Yao, D. D. and Pei, F. F., 1990, Flexible parts routing in manufacturing systems. IIE Transactions, 22(1), 48-55.
    • (1990) IIE Transactions , vol.22 , Issue.1 , pp. 48-55
    • Yao, D.D.1    Pei, F.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.