-
1
-
-
0032298790
-
Manpower allocation using genetic annealing
-
Abboud, N., Inuiguchi, M., Sakawa, M. and Uemura, U., 1998, Manpower allocation using genetic annealing. European Journal of Operational Research, 111, 405-420.
-
(1998)
European Journal of Operational Research
, vol.111
, pp. 405-420
-
-
Abboud, N.1
Inuiguchi, M.2
Sakawa, M.3
Uemura, U.4
-
2
-
-
84896876201
-
Workforce allocation in cyclical scheduling problems: A survey
-
Baker, K. R., 1976, Workforce allocation in cyclical scheduling problems: a survey. Operations Research Quarterly, 27, 155-167.
-
(1976)
Operations Research Quarterly
, vol.27
, pp. 155-167
-
-
Baker, K.R.1
-
4
-
-
0028765130
-
Working set generation methods for labor tour scheduling
-
Bechtold, S. E. and Brusco, M. J., 1994, Working set generation methods for labor tour scheduling. European Journal of Operational Research, 74, 540-551.
-
(1994)
European Journal of Operational Research
, vol.74
, pp. 540-551
-
-
Bechtold, S.E.1
Brusco, M.J.2
-
5
-
-
84985773391
-
A comparative evaluation of labor tour scheduling methods
-
Betchtold, S. E., Brusco, M. J. and Schowalter, M. J., 1991, A comparative evaluation of labor tour scheduling methods. Decision Sciences, 22, 683-699.
-
(1991)
Decision Sciences
, vol.22
, pp. 683-699
-
-
Betchtold, S.E.1
Brusco, M.J.2
Schowalter, M.J.3
-
6
-
-
0027543260
-
A simulated annealing approach to the cyclic staff-scheduling problem
-
Brusco, M. J. and Jacobs, L. W., 1993, A simulated annealing approach to the cyclic staff-scheduling problem. Naval research Logistics, 40, 69-84.
-
(1993)
Naval Research Logistics
, vol.40
, pp. 69-84
-
-
Brusco, M.J.1
Jacobs, L.W.2
-
10
-
-
0010849776
-
-
Easy Staff 96, RosterAid 96, Employee Schedule Partner 1998, FlexTime 97 and ScheduleSoft 99; [available on the Web]
-
Easy Staff 96, RosterAid 96, Employee Schedule Partner 1998, FlexTime 97 and ScheduleSoft 99, Getting Started and Features [available on the Web].
-
Getting Started and Features
-
-
-
11
-
-
0032073129
-
Incorporating human resources in group technology/cellular manufacturing
-
Eckstein, A. H. H. and Rohleder, T. R., 1998, Incorporating human resources in group technology/cellular manufacturing. International Journal of Production Research, 36, 1199-1222.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 1199-1222
-
-
Eckstein, A.H.H.1
Rohleder, T.R.2
-
12
-
-
0010908173
-
Constraint programming
-
Esquirol, P. and Lopez, P., 1995, Constraint programming. Belgian Journal of Operations Research, Special Issue Constraint Programming, 35, 5-36.
-
(1995)
Belgian Journal of Operations Research, Special Issue Constraint Programming
, vol.35
, pp. 5-36
-
-
Esquirol, P.1
Lopez, P.2
-
13
-
-
0010777357
-
Production systems design for SMEs: A case study
-
(Amsterdam: Elsevier)
-
Franchini, L., Caillaud, E. and Lacoste, G., 1998a, Production systems design for SMEs: a case study. ODAM'98, Proceedings of the 6th Conference on Organizational Design and Management (Amsterdam: Elsevier).
-
(1998)
ODAM'98, Proceedings of the 6th Conference on Organizational Design and Management
-
-
Franchini, L.1
Caillaud, E.2
Lacoste, G.3
-
14
-
-
0032268274
-
Planning and scheduling skills: A case study in an agrifood industry
-
[CD-ROM]
-
Franchini, L., Caillaud, E., Nguyen, P. and Lacoste, G., 1998b, Planning and scheduling skills: a case study in an agrifood industry. IEEE SMC'98, International Conference on Systems, Man and Cybernetics [CD-ROM], 417-422.
-
(1998)
IEEE SMC'98, International Conference on Systems, Man and Cybernetics
, pp. 417-422
-
-
Franchini, L.1
Caillaud, E.2
Nguyen, P.3
Lacoste, G.4
-
15
-
-
0032124101
-
Integrated framework for selection of machining equipment in CIM
-
Gindy, N. N. Z. and Ratchev, T. M., 1998, Integrated framework for selection of machining equipment in CIM. International Journal of Computer Integrated manufacturing, 11, 311-425.
-
(1998)
International Journal of Computer Integrated Manufacturing
, vol.11
, pp. 311-425
-
-
Gindy, N.N.Z.1
Ratchev, T.M.2
-
16
-
-
0345533910
-
An implementation of man-software cooperative scheduling: The IO software
-
Grabot, B., Bérard, C. and Nguyen, P., 1999, An implementation of man-software cooperative scheduling: the IO software. Production Planning and Control, 10, 238-250.
-
(1999)
Production Planning and Control
, vol.10
, pp. 238-250
-
-
Grabot, B.1
Bérard, C.2
Nguyen, P.3
-
17
-
-
2842511491
-
Human resource management and performance: A review and research agenda
-
Guest, D. E., 1997, Human resource management and performance: a review and research agenda, International Journal of Human Research Management, 8, 263-276.
-
(1997)
International Journal of Human Research Management
, vol.8
, pp. 263-276
-
-
Guest, D.E.1
-
18
-
-
2642527326
-
Reorganisation des Personaleinsatzes mit Hilfe des personalorientierten Simulation
-
Forschungsbericht aus dem Institut fur Arbeitswissenschaft und Betriebsorganisation; (Shaker)
-
Heel, J., 1999, Reorganisation des Personaleinsatzes mit Hilfe des personalorientierten Simulation, Forschungsbericht aus dem Institut fur Arbeitswissenschaft und Betriebsorganisation, Band 18 (Shaker).
-
(1999)
, vol.18
-
-
Heel, J.1
-
19
-
-
0000183015
-
Multiple-shift workforce scheduling under the 3-4 workweek with different weekday and weekend labor requirements
-
Hung, R., 1994, Multiple-shift workforce scheduling under the 3-4 workweek with different weekday and weekend labor requirements. Management Science, 42, 280-284.
-
(1994)
Management Science
, vol.42
, pp. 280-284
-
-
Hung, R.1
-
20
-
-
0032624548
-
Scheduling a workforce under annualized hours
-
Hung, R., 1999, Scheduling a workforce under annualized hours. International Journal of Production Research, 37, 2419-2427.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 2419-2427
-
-
Hung, R.1
-
22
-
-
0342455228
-
Solving a manpower planning problem using constraint programming
-
Jacques, P., 1993, Solving a manpower planning problem using constraint programming. Belgian Journal of Operations Research, 33, 77-85.
-
(1993)
Belgian Journal of Operations Research
, vol.33
, pp. 77-85
-
-
Jacques, P.1
-
23
-
-
26144461241
-
Programmation Linéaire: Modélisation et mise en æuvre informatique
-
(Paris: Economica)
-
Jacquet-Lagrèze, E., 1998, Programmation Linéaire: Modélisation et mise en æuvre informatique (Paris: Economica).
-
(1998)
-
-
Jacquet-Lagrèze, E.1
-
24
-
-
0010908365
-
The shift scheduling problem: Different formulations and solution methods
-
(Paris: Université Paris-Dauphine)
-
Jacquet-Lagrèze, E., Montaut, D. and Partouche, A., 1997, The Shift Scheduling Problem: Different Formulations and Solution Methods. Cahier du Lamsade no. 146 (Paris: Université Paris-Dauphine).
-
(1997)
Cahier du Lamsade
, Issue.146
-
-
Jacquet-Lagrèze, E.1
Montaut, D.2
Partouche, A.3
-
25
-
-
0023978834
-
Expert systems for planning and scheduling manufacturing systems
-
Kusiak, A. and Chen, M., 1988, Expert systems for planning and scheduling manufacturing systems. European Journal of Operational Research, 34, 113-130.
-
(1988)
European Journal of Operational Research
, vol.34
, pp. 113-130
-
-
Kusiak, A.1
Chen, M.2
-
26
-
-
0032047497
-
The human factor in CIM systems: Worker empowerment and control within a high-volume production environment
-
McEwan, A. M. and Sackett, P., 1998, The human factor in CIM systems: worker empowerment and control within a high-volume production environment. Computers in Industry, 36, 39-47.
-
(1998)
Computers in Industry
, vol.36
, pp. 39-47
-
-
McEwan, A.M.1
Sackett, P.2
-
28
-
-
0010849548
-
De la réduction à la réorganisation du temps de travail
-
Pépin, M. and Lefèvre, E., 1997, De la réduction à la réorganisation du temps de travail. Revue Française de Gestion Industrielle, 16, 51-58.
-
(1997)
Revue Française de Gestion Industrielle
, vol.16
, pp. 51-58
-
-
Pépin, M.1
Lefèvre, E.2
-
31
-
-
0031190793
-
Resource-constrained materials requirements planning: MRP-rc
-
Tempelmeier, H., 1997, Resource-constrained materials requirements planning: MRP-rc. Production Planning and Control, 8, 451-461.
-
(1997)
Production Planning and Control
, vol.8
, pp. 451-461
-
-
Tempelmeier, H.1
-
32
-
-
0001518161
-
On manpower scheduling algorithms
-
Tien, J. M. and Kamiyama, A., 1982, On manpower scheduling algorithms. Society for Industrial and Applied Mathematics Review, 24, 275-287.
-
(1982)
Society for Industrial and Applied Mathematics Review
, vol.24
, pp. 275-287
-
-
Tien, J.M.1
Kamiyama, A.2
|