|
Volumn 8, Issue 5, 1997, Pages 451-461
|
Resource-constrained materials requirements planning – MRP rc
a |
Author keywords
Capacity; Control; Lot sizing; MRP; Production planning
|
Indexed keywords
ALGORITHMS;
COMPUTER SOFTWARE;
HEURISTIC METHODS;
MATHEMATICAL MODELS;
OPTIMIZATION;
PRODUCTION CONTROL;
RESOURCE ALLOCATION;
SCHEDULING;
CAPACITY;
LOT SIZING;
PRODUCTION PLANNING AND CONTROL;
RESOURCE CONSTRAINED MATERIALS REQUIREMENTS PLANNING;
PLANNING;
|
EID: 0031190793
PISSN: 09537287
EISSN: 13665871
Source Type: Journal
DOI: 10.1080/095372897235028 Document Type: Article |
Times cited : (12)
|
References (10)
|