메뉴 건너뛰기




Volumn 48, Issue 1, 2001, Pages 65-78

Markovian approximation for manufacturing systems of unreliable machines in tandem

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; APPROXIMATION THEORY; COSTS; INDUSTRIAL ECONOMICS; MARKOV PROCESSES; POISSON DISTRIBUTION; PROBABILITY DISTRIBUTIONS; PRODUCTION CONTROL; PURCHASING;

EID: 0035252464     PISSN: 0894069X     EISSN: None     Source Type: Journal    
DOI: 10.1002/1520-6750(200102)48:1<65::AID-NAV4>3.0.CO;2-5     Document Type: Article
Times cited : (7)

References (28)
  • 1
    • 0022667867 scopus 로고
    • Optimal control of production rate in a failure prone manufacturing system
    • R. Akella and P. Kumar, Optimal control of production rate in a failure prone manufacturing system, IEEE Trans Automat Contr 31 (1986), 116-126.
    • (1986) IEEE Trans Automat Contr , vol.31 , pp. 116-126
    • Akella, R.1    Kumar, P.2
  • 2
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable manufacturing systems
    • T. Bielecki and P. Kumar, Optimality of zero-inventory policies for unreliable manufacturing systems, Oper Res 36 (1988), 532-541.
    • (1988) Oper Res , vol.36 , pp. 532-541
    • Bielecki, T.1    Kumar, P.2
  • 3
    • 0030171583 scopus 로고    scopus 로고
    • Optimal control of manufacturing flow and preventive maintenance
    • E. Boukas and H. Yang, Optimal control of manufacturing flow and preventive maintenance, IEEE Auto Contr 41 (1996), 881-885.
    • (1996) IEEE Auto Contr , vol.41 , pp. 881-885
    • Boukas, E.1    Yang, H.2
  • 5
    • 0039034212 scopus 로고    scopus 로고
    • Optimality of state-dependent (s. S) policies in inventory models with Markov-modulated demand and lost sales
    • F. Cheng and P. Sethi, Optimality of state-dependent (s. S) policies in inventory models with Markov-modulated demand and lost sales, Prod Oper Manag 8 (1999), 183-192.
    • (1999) Prod Oper Manag , vol.8 , pp. 183-192
    • Cheng, F.1    Sethi, P.2
  • 6
    • 21944446582 scopus 로고    scopus 로고
    • Circulant preconditioners for failure prone manufacturing systems
    • W. Ching, Circulant preconditioners for failure prone manufacturing systems, Lin Alg Appl 266 (1997), 161-180.
    • (1997) Lin Alg Appl , vol.266 , pp. 161-180
    • Ching, W.1
  • 7
    • 0002042338 scopus 로고    scopus 로고
    • Iterative methods for manufacturing systems of two stations in tandem
    • W. Ching, Iterative methods for manufacturing systems of two stations in tandem, Appl Math Lett 11 (1998), 7-12.
    • (1998) Appl Math Lett , vol.11 , pp. 7-12
    • Ching, W.1
  • 8
    • 0032068393 scopus 로고    scopus 로고
    • An inventory model for manufacturing systems with delivery time guarantees
    • W. Ching, An inventory model for manufacturing systems with delivery time guarantees, Comput Oper Res 25 (1998), 367-377.
    • (1998) Comput Oper Res , vol.25 , pp. 367-377
    • Ching, W.1
  • 9
    • 0031275243 scopus 로고    scopus 로고
    • Markov modulated Poisson processes for multi-location inventory problems
    • W. Ching, Markov modulated Poisson processes for multi-location inventory problems, Int J Prod Econ 53 (1997), 217-223.
    • (1997) Int J Prod Econ , vol.53 , pp. 217-223
    • Ching, W.1
  • 10
    • 0035906302 scopus 로고    scopus 로고
    • Machine repairing models for production systems
    • to appear
    • W. Ching, Machine repairing models for production systems, Int J Prod Econ (2001), to appear.
    • (2001) Int J Prod Econ
    • Ching, W.1
  • 11
    • 0040946904 scopus 로고
    • Hedging point production planning for failure prone manufacturing systems
    • W. Ching and X. Zhou, Hedging point production planning for failure prone manufacturing systems, Proc 5th Conf Oper Res Soc Hong Kong, 1995, pp. 163-172.
    • (1995) Proc 5th Conf Oper Res Soc Hong Kong , pp. 163-172
    • Ching, W.1    Zhou, X.2
  • 12
    • 0039554507 scopus 로고    scopus 로고
    • Matrix method for production planning in failure prone manufacturing systems
    • Springer-Verlag, New York
    • W. Ching and X. Zhou, "Matrix method for production planning in failure prone manufacturing systems," Lecture Notes in Control and Information Sciences 214, Springer-Verlag, New York, 1996, pp. 3-31.
    • (1996) Lecture Notes in Control and Information Sciences , vol.214 , pp. 3-31
    • Ching, W.1    Zhou, X.2
  • 13
    • 0039768884 scopus 로고    scopus 로고
    • Fast algorithms for Markov modulated poisson processes and their applications to manufacturing systems
    • W. Ching, R. Chan, and X. Zhou, Fast algorithms for Markov Modulated Poisson processes and their applications to manufacturing systems, SIAM J Matrix Anal Appl 18 (1997), 464-481.
    • (1997) SIAM J Matrix Anal Appl , vol.18 , pp. 464-481
    • Ching, W.1    Chan, R.2    Zhou, X.3
  • 14
    • 0343726031 scopus 로고
    • Conjugate gradient methods for Markov modulated Poisson processes
    • Thailand
    • W. Ching, R. Chan, and X. Zhou, Conjugate gradient methods for Markov modulated Poisson processes, Proc 2nd Asian Math Conf, 1995, Thailand, pp. 406-417.
    • (1995) Proc 2nd Asian Math Conf , pp. 406-417
    • Ching, W.1    Chan, R.2    Zhou, X.3
  • 15
    • 21844504189 scopus 로고
    • Relationship between JIT and TQM: Practice and performance
    • B. Flynn, S. Sakakibara, and R. Schroeder, Relationship between JIT and TQM: Practice and performance, Acad Manage J 38 (1995), 1325-1360.
    • (1995) Acad Manage J , vol.38 , pp. 1325-1360
    • Flynn, B.1    Sakakibara, S.2    Schroeder, R.3
  • 16
    • 5244292033 scopus 로고    scopus 로고
    • Using information about machine failures to control flow lines
    • C. Glassey, S. Seshadri, and J. Shanthikumar, Using information about machine failures to control flow lines, Math Methods Oper Res 45 (1998), 455-481.
    • (1998) Math Methods Oper Res , vol.45 , pp. 455-481
    • Glassey, C.1    Seshadri, S.2    Shanthikumar, J.3
  • 18
    • 0024645430 scopus 로고
    • The analysis of a queue arising in overflow models
    • K. Meier-Hellstern, The analysis of a queue arising in overflow models, IEEE Trans Commun 37 (1989), 367-372.
    • (1989) IEEE Trans Commun , vol.37 , pp. 367-372
    • Meier-Hellstern, K.1
  • 19
    • 0029252650 scopus 로고
    • Production rate control for failure prone production system with no backlog permitted
    • J. Hu, Production rate control for failure prone production system with no backlog permitted, IEEE Trans Automat Control 40 (1995), 291-295.
    • (1995) IEEE Trans Automat Control , vol.40 , pp. 291-295
    • Hu, J.1
  • 20
    • 0028495053 scopus 로고
    • Optimality of hedging point policies in the production control of failure prone manufacturing systems
    • J. Hu and P. Vakili, Optimality of hedging point policies in the production control of failure prone manufacturing systems, IEEE Trans Automat Control 39 (1994), 1875-1880.
    • (1994) IEEE Trans Automat Control , vol.39 , pp. 1875-1880
    • Hu, J.1    Vakili, P.2
  • 21
    • 0031140208 scopus 로고    scopus 로고
    • Control policy simulation based on machine age in a failure prone one-machine, one-product manufacturing system
    • J. Kenne, A. Gharbi, and E. Boukas, Control policy simulation based on machine age in a failure prone one-machine, one-product manufacturing system, Int J Prod Res 35 (1997), 1431-1445.
    • (1997) Int J Prod Res , vol.35 , pp. 1431-1445
    • Kenne, J.1    Gharbi, A.2    Boukas, E.3
  • 22
    • 0003449926 scopus 로고
    • Industrial Engineering Manufacturing Press, Atlanta
    • Y. Monden, Toyota production system, Industrial Engineering Manufacturing Press, Atlanta, 1983.
    • (1983) Toyota Production System
    • Monden, Y.1
  • 23
    • 0031223202 scopus 로고    scopus 로고
    • Optimal control of a single stage production system subject to random process shifts
    • R. Nurani, S. Seshadri, and J. Shanthikumar, Optimal control of a single stage production system subject to random process shifts, Oper Res 45 (1997), 713-724.
    • (1997) Oper Res , vol.45 , pp. 713-724
    • Nurani, R.1    Seshadri, S.2    Shanthikumar, J.3
  • 24
    • 0027624219 scopus 로고
    • Feedback production planning in a stochastic two-machine flowshop: Asymptotic analysis and computational results
    • S. Sethi, H. Yan, Q. Zhang, and X. Zhou, Feedback production planning in a stochastic two-machine flowshop: Asymptotic analysis and computational results. Int J Prod Econ (1993) 30-31, 79-93.
    • (1993) Int J Prod Econ , pp. 30-31
    • Sethi, S.1    Yan, H.2    Zhang, Q.3    Zhou, X.4
  • 25
    • 0002586369 scopus 로고
    • Hierarchical controls in stochastic manufacturing systems with machines in tandem
    • S. Sethi, Q. Zhang, and X. Zhou, Hierarchical controls in stochastic manufacturing systems with machines in tandem, Stoch Stoch Rep 41 (1992), 89-118.
    • (1992) Stoch Stoch Rep , vol.41 , pp. 89-118
    • Sethi, S.1    Zhang, Q.2    Zhou, X.3
  • 26
    • 0020783240 scopus 로고
    • Robustness of queueing network formulas
    • R. Suri, Robustness of queueing network formulas, J Assoc Comput Mach 30 (1983), 564-594.
    • (1983) J Assoc Comput Mach , vol.30 , pp. 564-594
    • Suri, R.1
  • 27
    • 0005328865 scopus 로고
    • Rough cut modeling: An alternative to simulation
    • R. Suri and G. Diehl, Rough cut modeling: An alternative to simulation, CIM Rev 3 (1987), 25-32.
    • (1987) CIM Rev , vol.3 , pp. 25-32
    • Suri, R.1    Diehl, G.2
  • 28
    • 0021831614 scopus 로고
    • Reversibility of tandem blocking queueing systems
    • G. Yamazaki, T. Kawashima, and H. Sakasegawa, Reversibility of tandem blocking queueing systems, Manage Sci 31 (1985), 78-83.
    • (1985) Manage Sci , vol.31 , pp. 78-83
    • Yamazaki, G.1    Kawashima, T.2    Sakasegawa, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.