메뉴 건너뛰기




Volumn 266, Issue 1-3, 1997, Pages 161-180

Circulant preconditioners for failure prone manufacturing systems

Author keywords

[No Author keywords available]

Indexed keywords


EID: 21944446582     PISSN: 00243795     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0024-3795(97)00001-3     Document Type: Article
Times cited : (8)

References (18)
  • 1
    • 0022667867 scopus 로고
    • Optimal control of production rate in failure prone manufacturing systems
    • R. Akella and P. Kumar, Optimal control of production rate in failure prone manufacturing systems, IEEE Trans. Automat. Control 31:116-126 (1986).
    • (1986) IEEE Trans. Automat. Control , vol.31 , pp. 116-126
    • Akella, R.1    Kumar, P.2
  • 2
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable manufacturing systems
    • T. Bielecki and P. Kumar, Optimality of zero-inventory policies for unreliable manufacturing systems, Oper. Res. 36:532-541 (1988).
    • (1988) Oper. Res. , vol.36 , pp. 532-541
    • Bielecki, T.1    Kumar, P.2
  • 3
    • 0000592564 scopus 로고
    • Iterative methods for overflow queueing models I
    • R. Chan, Iterative methods for overflow queueing models I, Numer. Math. 51:143-180 (1987).
    • (1987) Numer. Math. , vol.51 , pp. 143-180
    • Chan, R.1
  • 4
    • 0001591858 scopus 로고    scopus 로고
    • Toeplitz-circulant preconditioners for Toeplitz matrix and its application in queueing networks with batch arrivals
    • R. Chan and W. Ching, Toeplitz-circulant preconditioners for Toeplitz matrix and its application in queueing networks with batch arrivals, SIAM J. Sci. Comput. 17:162-172 (1996).
    • (1996) SIAM J. Sci. Comput. , vol.17 , pp. 162-172
    • Chan, R.1    Ching, W.2
  • 5
    • 0039768884 scopus 로고    scopus 로고
    • Circulant preconditioners for Markov modulated poisson processes and their applications to manufacturing systems
    • W. Ching, R. Chan, and X. Zhou, Circulant preconditioners for Markov modulated Poisson processes and their applications to manufacturing systems, SIAM J. Matrix Anal. Appl., 18(2):464-481, 1997.
    • (1997) SIAM J. Matrix Anal. Appl. , vol.18 , Issue.2 , pp. 464-481
    • Ching, W.1    Chan, R.2    Zhou, X.3
  • 9
    • 0027558877 scopus 로고
    • A queueing equivalence to optimal control of a manufacturing system with failures
    • J. Hu and D. Xiang, A queueing equivalence to optimal control of a manufacturing system with failures, IEEE Trans. Automat. Control 38:499-502 (1993).
    • (1993) IEEE Trans. Automat. Control , vol.38 , pp. 499-502
    • Hu, J.1    Xiang, D.2
  • 10
    • 0029252650 scopus 로고
    • Production rate control for failure prone production systems with no backlog permitted
    • J. Hu, Production rate control for failure prone production systems with no backlog permitted, IEEE Trans. Automat. Control 40:294-295 (1995).
    • (1995) IEEE Trans. Automat. Control , vol.40 , pp. 294-295
    • Hu, J.1
  • 11
    • 0028495053 scopus 로고
    • Optimality of hedging point policies in the production control of failure prone manufacturing systems
    • J. Hu, P. Vakili, and G. Yu, Optimality of hedging point policies in the production control of failure prone manufacturing systems, IEEE Trans. Automat. Control 39:1875-1880 (1991).
    • (1991) IEEE Trans. Automat. Control , vol.39 , pp. 1875-1880
    • Hu, J.1    Vakili, P.2    Yu, G.3
  • 12
    • 0003449926 scopus 로고
    • Industrial Engineering and Manufacturing Press, Atlanta
    • Y. Monden, Toyota Production System, Industrial Engineering and Manufacturing Press, Atlanta, 1983.
    • (1983) Toyota Production System
    • Monden, Y.1
  • 13
    • 0027624219 scopus 로고
    • Feedback production planning in a stochastic two-machine flowshop: Asymptotic analysis and computational results
    • S. Sethi, H. Yan, Q. Zhang, and X. Zhou, Feedback production planning in a stochastic two-machine flowshop: Asymptotic analysis and computational results, Internat. J. Production Econ. 30-31:79-93 (1993).
    • (1993) Internat. J. Production Econ. , vol.30-31 , pp. 79-93
    • Sethi, S.1    Yan, H.2    Zhang, Q.3    Zhou, X.4
  • 14
    • 0002586369 scopus 로고
    • Hierarchical controls in stochastic manufacturing systems with machines in tandem
    • S. Sethi, Q. Zhang, and X. Zhou, Hierarchical controls in stochastic manufacturing systems with machines in tandem, Stochastics Stochastics Rep. 41:89-118 (1992).
    • (1992) Stochastics Stochastics Rep. , vol.41 , pp. 89-118
    • Sethi, S.1    Zhang, Q.2    Zhou, X.3
  • 15
    • 0028523285 scopus 로고
    • Dynamic stochastic job shops and hierarchical production planning
    • S. Sethi and X. Zhou, Dynamic stochastic job shops and hierarchical production planning, IEEE Trans. Automat. Control 39:2061-2076 (1994).
    • (1994) IEEE Trans. Automat. Control , vol.39 , pp. 2061-2076
    • Sethi, S.1    Zhou, X.2
  • 16
    • 0002716979 scopus 로고
    • A fast Lanczos-type solver for non-symmetric linear systems
    • P. Sonneveld, A fast Lanczos-type solver for non-symmetric linear systems, SIAM J. Sci. Comput. 10:36-52 (1989).
    • (1989) SIAM J. Sci. Comput. , vol.10 , pp. 36-52
    • Sonneveld, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.