메뉴 건너뛰기




Volumn 45, Issue 3, 1997, Pages 455-481

Using information about machine failures to control flowlines

Author keywords

Markov Decision Theory; Production Scheduling; Semiconductor Industry

Indexed keywords

DECISION THEORY; MARKOV PROCESSES; PRODUCTION; REPAIR; SCHEDULING;

EID: 5244292033     PISSN: 14322994     EISSN: None     Source Type: Journal    
DOI: 10.1007/BF01194790     Document Type: Article
Times cited : (1)

References (31)
  • 1
    • 0022667867 scopus 로고
    • Optimal control of production rate in a failure prone manufacturing system
    • Akella A, Kumar PR (1986) Optimal control of production rate in a failure prone manufacturing system. IEEE Trans. Automatic Control 31:116-126
    • (1986) IEEE Trans. Automatic Control , vol.31 , pp. 116-126
    • Akella, A.1    Kumar, P.R.2
  • 2
    • 0024135864 scopus 로고
    • Assessing the effects of machine breakdowns in stochastic scheduling
    • Birge JR, Glazebrook KD (1988) Assessing the effects of machine breakdowns in stochastic scheduling. OR Letters 7, 6:267-271
    • (1988) OR Letters , vol.7 , Issue.6 , pp. 267-271
    • Birge, J.R.1    Glazebrook, K.D.2
  • 3
    • 0025481509 scopus 로고
    • Manufacturing flow control and preventive maintenance: A stochastic control approach
    • Boukas E, Haurie A (1990) Manufacturing flow control and preventive maintenance: A stochastic control approach. IEEE Trans. Automatic Control 36, 5:1024-1031
    • (1990) IEEE Trans. Automatic Control , vol.36 , Issue.5 , pp. 1024-1031
    • Boukas, E.1    Haurie, A.2
  • 4
    • 84987012950 scopus 로고
    • PAC: A general approach for coordinating production in multiple-cell manufacturing systems
    • Buzacott JA, Shanthikumar JG (1992) PAC: A general approach for coordinating production in multiple-cell manufacturing systems. Prod. Oper. Manag.: 34-52
    • (1992) Prod. Oper. Manag. , pp. 34-52
    • Buzacott, J.A.1    Shanthikumar, J.G.2
  • 6
    • 5244239007 scopus 로고
    • Hierarchical flow control: A framework for scheduling and planning discrete events in manufacturing systems
    • Gershwin SB (1988) Hierarchical flow control: A framework for scheduling and planning discrete events in manufacturing systems. IEEE Proc. Special Issue on Discrete Event Systems
    • (1988) IEEE Proc. Special Issue on Discrete Event Systems
    • Gershwin, S.B.1
  • 8
    • 5244372351 scopus 로고    scopus 로고
    • Using information about machine failures to control flowlines
    • Department of Statistics & Operations Research, New York University
    • Glassey CR, Seshadri S, Shanthikumar JG (1996a) Using information about machine failures to control flowlines. Working Paper. Department of Statistics & Operations Research, New York University
    • (1996) Working Paper
    • Glassey, C.R.1    Seshadri, S.2    Shanthikumar, J.G.3
  • 9
    • 0023367406 scopus 로고
    • Evaluating the effect of machine breakdowns in stochastic scheduling problems
    • Glazebrook KD (1987) Evaluating the effect of machine breakdowns in stochastic scheduling problems. Naval Research Logistics 34, 3:319-335
    • (1987) Naval Research Logistics , vol.34 , Issue.3 , pp. 319-335
    • Glazebrook, K.D.1
  • 10
    • 5244351942 scopus 로고
    • Manufacturing systems engineering Prentice Hall, NJ
    • Gershwin SB (1994) Manufacturing systems engineering. Prentice Hall, NJ
    • (1994)
    • Gershwin, S.B.1
  • 11
    • 0000044386 scopus 로고
    • Browman models of queueing networks with heterogeneous customer populations
    • Fleming W, Lions PL (eds) Springer-Verlag, Berlin
    • Harrison JM (1988) Browman models of queueing networks with heterogeneous customer populations. In: Fleming W, Lions PL (eds) Stochastic differential systems, stochastic control theory and applications, IMA Volume 10, Springer-Verlag, Berlin: 147-186
    • (1988) Stochastic Differential Systems, Stochastic Control Theory and Applications , vol.10 IMA VOLUME , pp. 147-186
    • Harrison, J.M.1
  • 12
    • 0025511612 scopus 로고
    • Scheduling networks of queues: Heavy traffic analysis of a two-station closed network
    • Harrison JM, Wein LM (1990) Scheduling networks of queues: Heavy traffic analysis of a two-station closed network. Operations Research 38, 6:1052-1064
    • (1990) Operations Research , vol.38 , Issue.6 , pp. 1052-1064
    • Harrison, J.M.1    Wein, L.M.2
  • 14
    • 21144477219 scopus 로고
    • Re-entrant lines
    • Kumar PR (1993) Re-entrant lines. Queueing Systems 13:87-110
    • (1993) Queueing Systems , vol.13 , pp. 87-110
    • Kumar, P.R.1
  • 15
    • 0028744478 scopus 로고
    • Scheduling semiconductor manufacturing plants
    • Kumar PR (1994) Scheduling semiconductor manufacturing plants. IEEE Control Systems: 33-40
    • (1994) IEEE Control Systems , pp. 33-40
    • Kumar, P.R.1
  • 16
    • 0025484857 scopus 로고
    • Numerical methods for stochastic control problems in continuous time
    • Kushner HJ (1990) Numerical methods for stochastic control problems in continuous time. SIAM J. Control and Optimization 28, 5:999-1048
    • (1990) SIAM J. Control and Optimization , vol.28 , Issue.5 , pp. 999-1048
    • Kushner, H.J.1
  • 17
    • 0016533472 scopus 로고
    • Applying a new device in the optimization of exponential queuing systems
    • Lippman SA (1975) Applying a new device in the optimization of exponential queuing systems. Operations Research 23, 4:687-710
    • (1975) Operations Research , vol.23 , Issue.4 , pp. 687-710
    • Lippman, S.A.1
  • 19
    • 5244310359 scopus 로고
    • Optimal control of a single stage production system subject to random process shifts
    • To appear
    • Nurani RK, Seshadri S, Shanthikumar JG (1995) Optimal control of a single stage production system subject to random process shifts. To appear in Operations Research
    • (1995) Operations Research
    • Nurani, R.K.1    Seshadri, S.2    Shanthikumar, J.G.3
  • 20
    • 0002472057 scopus 로고
    • A note on stochastic scheduling on a single machine subject to breakdown and repair
    • Pinedo M, Ramouz E (1988) A note on stochastic scheduling on a single machine subject to breakdown and repair. Prob. Eng. Inform. Sciences 2:41-49
    • (1988) Prob. Eng. Inform. Sciences , vol.2 , pp. 41-49
    • Pinedo, M.1    Ramouz, E.2
  • 22
    • 0024945301 scopus 로고
    • Analysis of a production-inventory system with unreliable production facility
    • Posner MJM, Berg M (1988) Analysis of a production-inventory system with unreliable production facility Operations Research Letters 8:339-345
    • (1988) Operations Research Letters , vol.8 , pp. 339-345
    • Posner, M.J.M.1    Berg, M.2
  • 24
    • 5244361662 scopus 로고
    • Ph.D. Thesis, Haas School of Business Administration, University of California, Berkeley, CA 94720
    • Seshadri S (1993) Stochastic models of semiconductor fabs. Ph.D. Thesis, Haas School of Business Administration, University of California, Berkeley, CA 94720
    • (1993) Stochastic Models of Semiconductor Fabs
    • Seshadri, S.1
  • 25
    • 5244366644 scopus 로고
    • Allocation of chips to wafers in a production problem of semiconductor chips
    • To appear
    • Seshadri S, Shanthikumar JG (1994) Allocation of chips to wafers in a production problem of semiconductor chips. To appear in Operations Research
    • (1994) Operations Research
    • Seshadri, S.1    Shanthikumar, J.G.2
  • 26
    • 0024048635 scopus 로고
    • Production control of a manufacturing system with multiple machine states
    • Sharifnia A (1988) Production control of a manufacturing system with multiple machine states. IEEE Trans. AC 33, 7:620-625
    • (1988) IEEE Trans. AC , vol.33 , Issue.7 , pp. 620-625
    • Sharifnia, A.1
  • 28
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. 1. System Characteristics, Performance Evaluation and Production Planning
    • Uzsoy R, Lee CY, Martin-Vega LA (1992) A review of production planning and scheduling models in the semiconductor industry. 1. System Characteristics, Performance Evaluation and Production Planning. IIE Trans. 24, 4:47-60
    • (1992) IIE Trans. , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 29
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, Part II: Shop-floor control
    • Uzsoy R, Lee C, Martin-Vega LA (1994) A review of production planning and scheduling models in the semiconductor industry, Part II: Shop-floor control. IIE Transactions 26:44-55
    • (1994) IIE Transactions , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.2    Martin-Vega, L.A.3
  • 31
    • 0002299223 scopus 로고
    • Optimal control of a two-station Brownian network, Math
    • Wein LM (1990) Optimal control of a two-station Brownian network, Math. Operations Research 15, 2:215-242
    • (1990) Operations Research , vol.15 , Issue.2 , pp. 215-242
    • Wein, L.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.