메뉴 건너뛰기




Volumn 49, Issue 11, 1998, Pages 1173-1187

Stochastic cyclic scheduling problem in synchronous assembly and production lines

Author keywords

Cyclic scheduling; Stochastic scheduling; Synchronous flow lines

Indexed keywords

APPROXIMATION THEORY; HEURISTIC METHODS; OPTIMIZATION; PROBLEM SOLVING; PROCESS CONTROL; RANDOM NUMBER GENERATION; RANDOM PROCESSES; SCHEDULING;

EID: 0032206271     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2600625     Document Type: Article
Times cited : (11)

References (14)
  • 3
    • 0024770469 scopus 로고
    • Sequencing in an assembly line with blocking to minimize cycle time
    • McCormick ST, Pinedo ML, Shenker S and Wolf B (1989). Sequencing in an assembly line with blocking to minimize cycle time. Opns Res 37: 925-935.
    • (1989) Opns Res , vol.37 , pp. 925-935
    • McCormick, S.T.1    Pinedo, M.L.2    Shenker, S.3    Wolf, B.4
  • 4
    • 0000757511 scopus 로고    scopus 로고
    • Cyclic scheduling in flow lines: Modeling observations, effective heuristics and an optimalsolution procedure
    • Karabati S and Kouvelis P (1996). Cyclic scheduling in flow lines: Modeling observations, effective heuristics and an optimal solution procedure. Naval Res Logist 43: 211-231.
    • (1996) Naval Res Logist , vol.43 , pp. 211-231
    • Karabati, S.1    Kouvelis, P.2
  • 6
    • 0030134958 scopus 로고    scopus 로고
    • A survey of machine scheduling problems with blocking and no-wait in process
    • Hall NG and Sriskandarajah C (1996). A survey of machine scheduling problems with blocking and no-wait in process. Opns Res 44: 510-525.
    • (1996) Opns Res , vol.44 , pp. 510-525
    • Hall, N.G.1    Sriskandarajah, C.2
  • 9
    • 0030288460 scopus 로고    scopus 로고
    • Estimating performance measures in repetitive manufacturing environments via stochastic cyclic scheduling
    • Rao US and Jackson PL (1996). Estimating performance measures in repetitive manufacturing environments via stochastic cyclic scheduling. IIE Trans 28: 929-939.
    • (1996) IIE Trans , vol.28 , pp. 929-939
    • Rao, U.S.1    Jackson, P.L.2
  • 10
    • 0027666485 scopus 로고
    • Stochastic analysis of cyclic schedules
    • Bowman R and Muckstadt J (1993). Stochastic analysis of cyclic schedules. Opns Res 41: 947-958.
    • (1993) Opns Res , vol.41 , pp. 947-958
    • Bowman, R.1    Muckstadt, J.2
  • 12
    • 0001907377 scopus 로고
    • Well-solved special cases
    • Lawler EL, Shmoys DB, Lenstra JK and Rinnooy Kan AHG (ed), John Wiley & Sons: Chichester
    • Gilmore PC, Lawler EL and Shmoys DB (1985). Well-solved special cases. In: Lawler EL, Shmoys DB, Lenstra JK and Rinnooy Kan AHG (ed). The Traveling Salesman Problem. John Wiley & Sons: Chichester.
    • (1985) The Traveling Salesman Problem
    • Gilmore, P.C.1    Lawler, E.L.2    Shmoys, D.B.3
  • 13
    • 0001510482 scopus 로고
    • Sequencing a one state- variable machine: A solvable case of the traveling salesman problem
    • Gilmore PC and Gomory RE (1964). Sequencing a one state- variable machine: a solvable case of the traveling salesman problem. Opns Res 12: 655- 679.
    • (1964) Opns Res , vol.12
    • Gilmore, P.C.1    Gomory, R.E.2
  • 14
    • 0025498065 scopus 로고
    • Cyclic sequencing problems in the two-machine permutation flowshop: Complexity, worst- case and average-case analysis
    • Matsuo H (1990). Cyclic sequencing problems in the two-machine permutation flowshop: Complexity, worst- case and average-case analysis. Naval Res Logist Q 37: 679-694.
    • (1990) Naval Res Logist Q , vol.37 , pp. 679-694
    • Matsuo, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.