메뉴 건너뛰기




Volumn 49, Issue 5, 1998, Pages 537-548

Stochastic cyclic flow lines: Non-blocking, markovian models

Author keywords

Cyclic scheduling; Decomposition; Production; Queueing

Indexed keywords


EID: 0032368483     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2600535     Document Type: Article
Times cited : (7)

References (31)
  • 2
    • 0024770469 scopus 로고
    • Sequencing in an assembly line with blocking to minimize cycle time
    • McCormick ST, Pinedo ML, Shenker S and Wolf B (1989). Sequencing in an assembly line with blocking to minimize cycle time. Opns Res 37: 925-935.
    • (1989) Opns Res , vol.37 , pp. 925-935
    • Mc Cormick, S.T.1    Pinedo, M.L.2    Shenker, S.3    Wolf, B.4
  • 3
    • 0000222016 scopus 로고
    • Sequencing of parts and robot moves in a robot cell
    • Sethi SP et al (1992). Sequencing of parts and robot moves in a robot cell. Int J Flexible Manufacturing Systems 4: 331-358.
    • (1992) Int J Flexible Manufacturing Systems , vol.4 , pp. 331-358
    • Sethi, S.P.1
  • 4
    • 0028550722 scopus 로고
    • Design for synchronized flow manufacturing
    • Ahmadi RH and Wurgaft H (1994). Design for synchronized flow manufacturing. Mgmt Sci 40: 1469-1483.
    • (1994) Mgmt Sci , vol.40 , pp. 1469-1483
    • Ahmadi, R.H.1    Wurgaft, H.2
  • 5
    • 0030691565 scopus 로고    scopus 로고
    • Performance measures and schedule patterns in periodic job shops
    • Lee TE and Posner ME (1996). Performance measures and schedule patterns in periodic job shops. Opns Res 45: 72-91.
    • (1996) Opns Res , vol.45 , pp. 72-91
    • Lee, T.E.1    Posner, M.E.2
  • 7
    • 84984727994 scopus 로고
    • Cyclic Sequencing Problems in the Two- Machine Permutation Flow shop: Complexity
    • Manuscript. Graduate School of Business, University of Texas, Austin, Texas
    • Matsuo H (1988). Cyclic Sequencing Problems in the Two- Machine Permutation Flow shop: Complexity, Worst Case and Average Case Analysis. Manuscript. Graduate School of Business, University of Texas, Austin, Texas.
    • (1988) Worst Case and Average Case Analysis
    • Matsuo, H.1
  • 10
    • 0030192702 scopus 로고    scopus 로고
    • A tabu search procedure for periodic job shop scheduling
    • Song JS and Lee TE (1995). A tabu search procedure for periodic job shop scheduling. Computer and Industrial Engineering 30: 433-447.
    • Computer and Industrial Engineering , vol.30 , pp. 433-447
    • Song, J.S.1    Lee, T.E.2
  • 11
    • 0027906646 scopus 로고
    • The complexity of scheduling jobs in repetitive manufacturing systems
    • Kamoun H and Sriskandarajah C (1993). The complexity of scheduling jobs in repetitive manufacturing systems. Eur J Opl Res 70: 350-364.
    • (1993) Eur J Opl Res , vol.70 , pp. 350-364
    • Kamoun, H.1    Sriskandarajah, C.2
  • 12
    • 0028766191 scopus 로고
    • Study of a NP-hard cyclic scheduling problem: The recurrent job-shop
    • Hansen C (1994). Study of a NP-hard cyclic scheduling problem: The recurrent job-shop. Eur J Opl Res 72: 82-101.
    • (1994) Eur J Opl Res , vol.72 , pp. 82-101
    • Hansen, C.1
  • 13
    • 21844501690 scopus 로고
    • The interface of buffer design and cyclic scheduling decisions in deterministic flow lines
    • Karabati S and Kouvelis P (1994). The interface of buffer design and cyclic scheduling decisions in deterministic flow lines. Ann Opns Res 50: 295-317.
    • (1994) Ann Opns Res , vol.50 , pp. 295-317
    • Karabati, S.1    Kouvelis, P.2
  • 14
    • 0042057991 scopus 로고
    • Scheduling in Robotic Cells: Classification
    • Working Paper. College of Business. The Ohio State University
    • Hall NG, Kamoun H and Sriskandarajah C (1994). Scheduling in Robotic Cells: Classification, Two and Three Machine Cells. Working Paper. College of Business. The Ohio State University.
    • (1994) Two and Three Machine Cells
    • Hall, N.G.1    Kamoun, H.2    Sriskandarajah, C.3
  • 16
    • 0026372827 scopus 로고
    • Properties and performance bounds for closed free choice synchronized monoclass queueing networks
    • Campos J, Chiola G and Silva M (1991). Properties and performance bounds for closed free choice synchronized monoclass queueing networks. IEEE Trans Automat Contr 36: 1368-1382.
    • (1991) IEEE Trans Automat Contr , vol.36 , pp. 1368-1382
    • Campos, J.1    Chiola, G.2    Silva, M.3
  • 17
    • 0027666485 scopus 로고
    • Stochastic analysis of cyclic schedulings
    • Bowman RA and Muckstadt JA (1993). Stochastic analysis of cyclic schedulings. Opns Res 41: 947-958.
    • (1993) Opns Res , vol.41 , pp. 947-958
    • Bowman, R.A.1    Muckstadt, J.A.2
  • 18
    • 0001421009 scopus 로고
    • Comparison properties of stochastic decision free Petri nets
    • Baccelli F and Liu Z (1992). Comparison properties of stochastic decision free Petri nets. IEEE Trans Automat Contr 37: 1905-1920.
    • (1992) IEEE Trans Automat Contr , vol.37 , pp. 1905-1920
    • Baccelli, F.1    Liu, Z.2
  • 20
    • 0000122260 scopus 로고
    • Ergodic theory of stochastic Petri networks
    • Baccelli F (1992). Ergodic theory of stochastic Petri networks. Ann Prob 20: 375-396.
    • (1992) Ann Prob , vol.20 , pp. 375-396
    • Baccelli, F.1
  • 23
    • 0024645936 scopus 로고
    • Petri nets: Properties, analysis and applications
    • Murata T (1989). Petri nets: properties, analysis and applications. Proceedings of the IEEE 77: 541-580.
    • (1989) Proceedings of the IEEE , vol.77 , pp. 541-580
    • Murata, T.1
  • 24
    • 0024479894 scopus 로고
    • Performance evaluation of job shop systems using timed event graphs
    • Hillion HP and Proth JM (1989). Performance evaluation of job shop systems using timed event graphs. IEEE Trans Automat Contr 34: 3-9.
    • (1989) IEEE Trans Automat Contr , vol.34 , pp. 3-9
    • Hillion, H.P.1    Proth, J.M.2
  • 26
    • 84910858869 scopus 로고
    • A software tool for the automatic analysis of Generalized Stochastic Petri Net models
    • Potier D, Elsevier Science Publishers B.V. (North-Holland)
    • Ajmone Marsan M, Balbo G, Ciardo G and Conte G (1985). A software tool for the automatic analysis of Generalized Stochastic Petri Net models. In: Potier D (ed). Modelling Techniques and Tools for Performance Analysis INRIA. Elsevier Science Publishers B.V. (North-Holland), pp 155-170.
    • (1985) Modelling Techniques and Tools for Performance Analysis INRIA , pp. 155-170
    • Ajmone Marsan, M.1    Balbo, G.2    Ciardo, G.3    Conte, G.4
  • 29
    • 0021429040 scopus 로고
    • One-place unbounded stochastic Petri nets: Ergodic criteria and steady-state solutions
    • Florin G and Natkin S (1986). One-place unbounded stochastic Petri nets: ergodic criteria and steady-state solutions. J Systems and Software 1: 103-115.
    • (1986) J Systems and Software , vol.1 , pp. 103-115
    • Florin, G.1    Natkin, S.2
  • 31
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results
    • Dallery Y and Gershwin SB (1992). Manufacturing flow line systems: a review of models and analytical results. Queueing Systems 12: 3-94.
    • (1992) Queueing Systems , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.