메뉴 건너뛰기




Volumn 31, Issue 5, 2000, Pages 639-647

Trade-off solutions in a single-machine scheduling problem for minimizing total earliness and maximum tardiness

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; EFFICIENCY; HEURISTIC METHODS; INVENTORY CONTROL; MACHINERY; PRODUCTION CONTROL;

EID: 0034191605     PISSN: 00207721     EISSN: 14645319     Source Type: Journal    
DOI: 10.1080/002077200290948     Document Type: Article
Times cited : (6)

References (16)
  • 2
    • 0025211593 scopus 로고
    • Sequence with earliness and tardiness penalties: A review
    • Baker, K. R., and Scudder, G. D., 1990, Sequence with earliness and tardiness penalties: a review. Operations Research, 38, 22-36.
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 3
    • 0027912254 scopus 로고
    • Complexity of single machine, multi-criteria scheduling problems
    • Chen, C. L., and Bulfin, R. L., 1993, Complexity of single machine, multi-criteria scheduling problems. European Journal of Operational Research, 70, 115-125.
    • (1993) European Journal of Operational Research , vol.70 , pp. 115-125
    • Chen, C.L.1    Bulfin, R.L.2
  • 4
    • 0031076052 scopus 로고    scopus 로고
    • Single machine scheduling to minimize weighted earliness subject to maximum tardiness
    • Chen, T., Qi, X., and Tu, M., 1997, Single machine scheduling to minimize weighted earliness subject to maximum tardiness. Computers and Operations Research, 24, 147-152.
    • (1997) Computers and Operations Research , vol.24 , pp. 147-152
    • Chen, T.1    Qi, X.2    Tu, M.3
  • 5
    • 0027542554 scopus 로고
    • Single-machine scheduling with early and tardy completion costs
    • Davis, J. S., and Kanet, J. J., 1993, Single-machine scheduling with early and tardy completion costs. Naval Research Logistics, 40, 85101.
    • (1993) Naval Research Logistics , vol.40 , pp. 85101
    • Davis, J.S.1    Kanet, J.J.2
  • 6
    • 0002218558 scopus 로고
    • Bicriterion static scheduling research for a single machine
    • Dileepan, P., and Sen, T., 1988, Bicriterion static scheduling research for a single machine. Omega, 16, 53-59.
    • (1988) Omega , vol.16 , pp. 53-59
    • Dileepan, P.1    Sen, T.2
  • 7
    • 0017240964 scopus 로고
    • A dual algorithm for the one-machine scheduling problem
    • Fisher, M. L., 1971, A dual algorithm for the one-machine scheduling problem. Mathematical Programming, 11, 229-251.
    • (1971) Mathematical Programming , vol.11 , pp. 229-251
    • Fisher, M.L.1
  • 8
    • 0000855797 scopus 로고
    • A framework for single machine multiple objective sequencing research
    • Fry, T. D., Armstrong, R. D., and Lewis, H., 1989, A framework for single machine multiple objective sequencing research. Omega, 17, 595-607.
    • (1989) Omega , vol.17 , pp. 595-607
    • Fry, T.D.1    Armstrong, R.D.2    Lewis, H.3
  • 9
    • 0026223827 scopus 로고
    • Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date
    • Hall, N.G., Kubiak, W., and Sethi, S. P., 1991, Earliness-tardiness scheduling problems, II: deviation of completion times about a restrictive common due date. Operations Research, 39, 847-856.
    • (1991) Operations Research , vol.39 , pp. 847-856
    • Hall, N.G.1    Kubiak, W.2    Sethi, S.P.3
  • 10
    • 0027256856 scopus 로고
    • Scheduling with monotonous earliness and tardiness penalties
    • Kahlbacher, H. G., 1993, Scheduling with monotonous earliness and tardiness penalties. European Journal of Operational Research, 64, 258-277.
    • (1993) European Journal of Operational Research , vol.64 , pp. 258-277
    • Kahlbacher, H.G.1
  • 11
    • 0032000622 scopus 로고    scopus 로고
    • Minimizing flowtime and maximum earliness on a single machine
    • Koksalan, M., Azizoglu, M., and Kondakci, S. K., 1998, Minimizing flowtime and maximum earliness on a single machine. IIE Transactions, 30, 192-200.
    • (1998) IIE Transactions , vol.30 , pp. 192-200
    • Koksalan, M.1    Azizoglu, M.2    Kondakci, S.K.3
  • 12
    • 0032167289 scopus 로고    scopus 로고
    • Common due window size and location determination in a single machine scheduling problem
    • Liman, S D., Panwalkar, S. S., and Thongmee, S., 1998, Common due window size and location determination in a single machine scheduling problem. Journal of the Operational Research Society, 49, 1007-1010.
    • (1998) Journal of the Operational Research Society , vol.49 , pp. 1007-1010
    • Liman, S.D.1    Panwalkar, S.S.2    Thongmee, S.3
  • 13
    • 0000245614 scopus 로고
    • The single machine early/tardy problem
    • Ow, P. S., and Morton, T. E., 1989, The single machine early/tardy problem. Management Science, 15, 117-191.
    • (1989) Management Science , vol.15 , pp. 117-191
    • Ow, P.S.1    Morton, T.E.2
  • 14
    • 0011713439 scopus 로고    scopus 로고
    • An evaluation of scheduling heuristics for dynamic single-processor scheduling with early/tardy costs
    • Robb, D. J., and Rohleder, T. R., 1996, An evaluation of scheduling heuristics for dynamic single-processor scheduling with early/tardy costs. Naval Research Logistics, 43, 349-364.
    • (1996) Naval Research Logistics , vol.43 , pp. 349-364
    • Robb, D.J.1    Rohleder, T.R.2
  • 15
    • 0002066821 scopus 로고
    • Various optimizers for single-stage production
    • Smith, W. E., 1956, Various optimizers for single-stage production. Naval Research Logistic Quarterly, 3, 59-66.
    • (1956) Naval Research Logistic Quarterly , vol.3 , pp. 59-66
    • Smith, W.E.1
  • 16
    • 84977334714 scopus 로고
    • Optimal timing schedules in earliness-tardiness single machine sequencing
    • Szwarc, W., and Mukhopadhyay, S. K., 1995, Optimal timing schedules in earliness-tardiness single machine sequencing. Naval Research Logistics, 42, 1109-1114.
    • (1995) Naval Research Logistics , vol.42 , pp. 1109-1114
    • Szwarc, W.1    Mukhopadhyay, S.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.