-
1
-
-
0001114258
-
Scheduling problems with non-regular penalty functions—a review
-
Raghavachari M (1988). Scheduling problems with non-regular penalty functions—a review. Opsearch 25: 144-164.
-
(1988)
Opsearch
, vol.25
, pp. 144-164
-
-
Raghavachari, M.1
-
2
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
Baker KR and Scudder GD (1990). Sequencing with earliness and tardiness penalties: a review. Opns Res 38: 22-36.
-
(1990)
Opns Res
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
3
-
-
0019702937
-
Minimizing the average deviation of job completion times about a common due date
-
Kanet JJ (1981). Minimizing the average deviation of job completion times about a common due date. Naval Res Logist Q 28: 643-651.
-
(1981)
Naval Res Logist Q
, vol.28
, pp. 643-651
-
-
Kanet, J.J.1
-
4
-
-
0020103079
-
Common due date assignment to minimize total penalty for the one machine scheduling problem
-
Panwalkar SS, Smith ML and Seidmann A (1982). Common due date assignment to minimize total penalty for the one machine scheduling problem. Opns Res 30: 391-399.
-
(1982)
Opns Res
, vol.30
, pp. 391-399
-
-
Panwalkar, S.S.1
Smith, M.L.2
Seidmann, A.3
-
6
-
-
0022738908
-
Scheduling problems with generalized due dates
-
Hall NG (1986). Scheduling problems with generalized due dates. IEE Trans 18: 220-222.
-
(1986)
IEE Trans
, vol.18
, pp. 220-222
-
-
Hall, N.G.1
-
7
-
-
0023869312
-
Optimal common due-date with limited completion time deviation
-
Cheng TCE (1988). Optimal common due-date with limited completion time deviation. Comps & Opns Res 15: 91-96.
-
(1988)
Comps & Opns Res
, vol.15
, pp. 91-96
-
-
Cheng, T.1
-
8
-
-
0026223827
-
Earliness-tardiness scheduling problems II: Deviation of completion times about a restictive common due date
-
Hall NG, Kubiak W and Sehi SP (1991). Earliness-tardiness scheduling problems II: Deviation of completion times about a restictive common due date. Opns Res 39: 847-856.
-
(1991)
Opns Res
, vol.39
, pp. 847-856
-
-
Hall, N.G.1
Kubiak, W.2
Sehi, S.P.3
-
9
-
-
0026223840
-
Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date
-
Hall NG and Posner ME (1991). Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date. Opns Res 39: 836-846.
-
(1991)
Opns Res
, vol.39
, pp. 836-846
-
-
Hall, N.G.1
Posner, M.E.2
-
13
-
-
0028428084
-
Earliness-tardiness scheduling problems with a common delivery window
-
Liman SD and Ramaswamy S (1994). Earliness-tardiness scheduling problems with a common delivery window. Opns Res Lett 15: 195-203.
-
(1994)
Opns Res Lett
, vol.15
, pp. 195-203
-
-
Liman, S.D.1
Ramaswamy, S.2
-
14
-
-
0030212471
-
Determination of common due window location in a single machine scheduling problem
-
Liman SD, Panwalkar SS and Thongmee S (1996). Determination of common due window location in a single machine scheduling problem. Eur J Opl Res 93: 68-74.
-
(1996)
Eur J Opl Res
, vol.93
, pp. 68-74
-
-
Liman, S.D.1
Panwalkar, S.S.2
Thongmee, S.3
|