메뉴 건너뛰기




Volumn 43, Issue 3, 1996, Pages 349-364

An evaluation of scheduling heuristics for dynamic single-processor scheduling with early/tardy costs

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0011713439     PISSN: 0894069X     EISSN: None     Source Type: Journal    
DOI: 10.1002/(SICI)1520-6750(199604)43:3<349::AID-NAV3>3.0.CO;2-9     Document Type: Review
Times cited : (7)

References (27)
  • 1
    • 0025211593 scopus 로고
    • Sequencing with Earliness and Tardiness Penalties: A Review
    • Baker, K.R., and Scudder, G.D., "Sequencing with Earliness and Tardiness Penalties: A Review," Operations Research, 38, 22-36 (1990).
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 2
    • 84989444315 scopus 로고
    • Heuristic Lot-Sizing Performance in a Rolling-Schedule Environment
    • Blackburn, J.D., and Millen, R.A., "Heuristic Lot-Sizing Performance in a Rolling-Schedule Environment," Decision Sciences, 11, 691-701 (1980).
    • (1980) Decision Sciences , vol.11 , pp. 691-701
    • Blackburn, J.D.1    Millen, R.A.2
  • 3
    • 0027542554 scopus 로고
    • Single Machine Scheduling with Early and Tardy Completion Costs
    • Davis, J.S., and Kanet, J.J., "Single Machine Scheduling with Early and Tardy Completion Costs," Naval Research Logistics, 40, 85-101 (1993).
    • (1993) Naval Research Logistics , vol.40 , pp. 85-101
    • Davis, J.S.1    Kanet, J.J.2
  • 4
    • 0019585243 scopus 로고
    • A Review of Production Scheduling
    • Graves, S.C., "A Review of Production Scheduling," Operations Research, 29, 646-675 (1981).
    • (1981) Operations Research , vol.29 , pp. 646-675
    • Graves, S.C.1
  • 5
    • 0027240799 scopus 로고
    • Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness
    • Kim, Y.-D., "Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness," Journal of the Operational Research Society, 44, 19-28 (1993).
    • (1993) Journal of the Operational Research Society , vol.44 , pp. 19-28
    • Kim, Y.-D.1
  • 6
    • 0027146758 scopus 로고
    • Addressing the Gap in Scheduling Research: A Review of Optimization and Heuristic Methods in Production Scheduling
    • MacCarthy, B.L., and Liu, J., "Addressing the Gap in Scheduling Research: A Review of Optimization and Heuristic Methods in Production Scheduling," International Journal of Production Research, 31, 59-79 (1993).
    • (1993) International Journal of Production Research , vol.31 , pp. 59-79
    • MacCarthy, B.L.1    Liu, J.2
  • 7
    • 0002748923 scopus 로고
    • Job-Shop Scheduling Theory: What is Relevant?
    • McKay, K.N., Safayeni, F.R., and Buzacott, J.A., "Job-Shop Scheduling Theory: What is Relevant?," Interfaces, 18, 84-90 (1988).
    • (1988) Interfaces , vol.18 , pp. 84-90
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 8
    • 0022737401 scopus 로고
    • Scheduling, Sequencing, and Dispatching: Alternative Perspectives
    • Second Quarter
    • Melnyk, S.A., Vickery, S.K., and Carter, P.L., "Scheduling, Sequencing, and Dispatching: Alternative Perspectives," Production and Inventory Management, 27 (Second Quarter), 58-67 (1986).
    • (1986) Production and Inventory Management , vol.27 , pp. 58-67
    • Melnyk, S.A.1    Vickery, S.K.2    Carter, P.L.3
  • 16
    • 5244359821 scopus 로고
    • Ph.D. dissertation, Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburgh
    • Ow, P.S., "Heuristic Knowledge and Search for Scheduling," Ph.D. dissertation, Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburgh, 1984.
    • (1984) Heuristic Knowledge and Search for Scheduling
    • Ow, P.S.1
  • 18
    • 0000245614 scopus 로고
    • The Single Machine Early/Tardy Problem
    • Ow, P.S., and Morton, I.E., "The Single Machine Early/Tardy Problem," Management Science, 35, 177-191 (1989).
    • (1989) Management Science , vol.35 , pp. 177-191
    • Ow, P.S.1    Morton, I.E.2
  • 19
    • 0023855852 scopus 로고
    • An Evaluation of Static Flowshop Scheduling Heuristics in Dynamic Flowshop Models via a Computer Simulation
    • Park, Y.B., "An Evaluation of Static Flowshop Scheduling Heuristics in Dynamic Flowshop Models via a Computer Simulation," Computers and Industrial Engineering, 14, 103-112 (1988).
    • (1988) Computers and Industrial Engineering , vol.14 , pp. 103-112
    • Park, Y.B.1
  • 22
    • 0027578685 scopus 로고
    • Improving the Efficiency of Tabu Search for Machine Sequencing Problems
    • Reeves, C.R., "Improving the Efficiency of Tabu Search for Machine Sequencing Problems," Journal of the Operational Research Society, 44, 375-382 (1993).
    • (1993) Journal of the Operational Research Society , vol.44 , pp. 375-382
    • Reeves, C.R.1
  • 23
    • 84990609960 scopus 로고
    • Scheduling in a Management Context: Uncertain Processing Times and Non-Regular Performance Measures
    • Robb, D.J., and Silver, E.A., "Scheduling in a Management Context: Uncertain Processing Times and Non-Regular Performance Measures," Decision Sciences, 24, 1085-1108 (1993).
    • (1993) Decision Sciences , vol.24 , pp. 1085-1108
    • Robb, D.J.1    Silver, E.A.2
  • 24
    • 84987041490 scopus 로고
    • An Evaluation of Order-Release and Dispatch Rules for the Dynamic Weighted Early/Tardy Problem
    • Rohleder, T.R., and Scudder, G.D., "An Evaluation of Order-Release and Dispatch Rules for the Dynamic Weighted Early/Tardy Problem," Production and Operations Management, 2, 221-238 (1993).
    • (1993) Production and Operations Management , vol.2 , pp. 221-238
    • Rohleder, T.R.1    Scudder, G.D.2
  • 26
    • 0002501521 scopus 로고
    • A State-of-Art Survey of Static Scheduling Research Involving Due Dates
    • Sen, T., and Gupta, S.K., "A State-of-Art Survey of Static Scheduling Research Involving Due Dates," OMEGA International Journal of Management Science, 12, 63-76 (1984).
    • (1984) OMEGA International Journal of Management Science , vol.12 , pp. 63-76
    • Sen, T.1    Gupta, S.K.2
  • 27
    • 0025700701 scopus 로고
    • Some Efficient Heuristic Methods for the Flow Shop Sequencing Problem
    • Taillard, E., "Some Efficient Heuristic Methods for the Flow Shop Sequencing Problem," European Journal of Operational Research, 47, 65-74 (1990).
    • (1990) European Journal of Operational Research , vol.47 , pp. 65-74
    • Taillard, E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.