메뉴 건너뛰기




Volumn 9, Issue 5, 1998, Pages 465-476

A heuristic for sequencing PCB assembly to minimize set-up times

Author keywords

Group technology; PCB assembly; Sequencing

Indexed keywords

GROUP TECHNOLOGY; HEURISTIC METHODS; PRINTED CIRCUIT BOARDS; PRINTED CIRCUIT MANUFACTURE;

EID: 0032117098     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/095372898233948     Document Type: Article
Times cited : (15)

References (30)
  • 1
    • 0027555416 scopus 로고
    • A heuristic algorithm for master production schedule generation with finite capacity and sequence dependent setups
    • Arosio, M., and Sianesi, A., 1993, A heuristic algorithm for master production schedule generation with finite capacity and sequence dependent setups. International Journal of Production Research, 31(3), 531-553.
    • (1993) International Journal of Production Research , vol.31 , Issue.3 , pp. 531-553
    • Arosio, M.1    Sianesi, A.2
  • 2
    • 0028480771 scopus 로고
    • Printed circuit board family grouping and component allocation for a multi-machine, open-shop assembly cell
    • Askin, R. G., Dror, M., and Vakharia, a.J., 1994, Printed circuit board family grouping and component allocation for a multi-machine, open-shop assembly cell. Naval Research Logistics, 41(5), 581-608.
    • (1994) Naval Research Logistics , vol.41 , Issue.5 , pp. 581-608
    • Askin, R.G.1    Dror, M.2    Vakharia, A.J.3
  • 3
    • 0002844386 scopus 로고
    • Scheduling the production of components at a common facility
    • Baker, K R., 1988, Scheduling the production of components at a common facility. IIE Transactions, 20, 32-35.
    • (1988) IIE Transactions , vol.20 , pp. 32-35
    • Baker, K.R.1
  • 6
    • 0030104271 scopus 로고    scopus 로고
    • Grouping PCBs for set-up reduction: A maximum spanning tree approach
    • Bhaskar, G., and Narendran, T. T., 1996, Grouping PCBs for set-up reduction: a maximum spanning tree approach. International Journal of Production Research, 34(3), 621-632.
    • (1996) International Journal of Production Research , vol.34 , Issue.3 , pp. 621-632
    • Bhaskar, G.1    Narendran, T.T.2
  • 7
    • 0001413064 scopus 로고
    • Production flow analysis
    • Burbidge, J. L., 1963, Production flow analysis. Production E ngineer, 42, 742.
    • (1963) Production E Ngineer , vol.42 , pp. 742
    • Burbidge, J.L.1
  • 9
    • 0022812078 scopus 로고
    • A LISP-based scheduler for automated insertion in electronics assembly
    • Cunningham, P., and Browne, J., 1986, A LISP-based scheduler for automated insertion in electronics assembly. International Journal of Production Reserch, 24, 1395-1408.
    • (1986) International Journal of Production Reserch , vol.24 , pp. 1395-1408
    • Cunningham, P.1    Browne, J.2
  • 10
    • 0025565242 scopus 로고
    • Group technology for high- mixed printed circuit assembly
    • Davis, T., and Selep, E., 1990, Group technology for high- mixed printed circuit assembly, IEEE\ CHMT 1990. iemt Symposium, 264-269.
    • (1990) IEEE\ CHMT 1990. Iemt Symposium , pp. 264-269
    • Davis, T.1    Selep, E.2
  • 11
    • 0011750526 scopus 로고
    • Design and scheduling of flexible assembly lines for printed circuit boards
    • Dessouky, M M., Adiga, S., and Parik, K., 1995, Design and scheduling of flexible assembly lines for printed circuit boards. International Journal of Production Research, 33(3), 757-775.
    • (1995) International Journal of Production Research , vol.33 , Issue.3 , pp. 757-775
    • Dessouky, M.M.1    Adiga, S.2    Parik, K.3
  • 12
    • 0024715223 scopus 로고
    • A mathematical model for loading the sequencers in a printed circuit pack manufacturing environment
    • Fathi, Y., and Taheri, J., 1989, A mathematical model for loading the sequencers in a printed circuit pack manufacturing environment. International Journal of Production Research, 27(8), 1305-1316.
    • (1989) International Journal of Production Research , vol.27 , Issue.8 , pp. 1305-1316
    • Fathi, Y.1    Taheri, J.2
  • 13
    • 0027625565 scopus 로고
    • Scheduling sequence-dependent jobs on identical parallel machines to minimize completion time criteria
    • Guinet, A., 1993, Scheduling sequence-dependent jobs on identical parallel machines to minimize completion time criteria. International Journal of Production Research, 31(7), 1579-1594.
    • (1993) International Journal of Production Research , vol.31 , Issue.7 , pp. 1579-1594
    • Guinet, A.1
  • 14
    • 5344264764 scopus 로고
    • PCB assembly set-up reduction using Group Technology
    • Hashiba, S., and Chang, T. C., 1991, PCB assembly set-up reduction using Group Technology. Computers and Industrial E ngineering, 21(1-4), 453-457.
    • (1991) Computers and Industrial E Ngineering , vol.21 , Issue.1-4 , pp. 453-457
    • Hashiba, S.1    Chang, T.C.2
  • 15
    • 0042667522 scopus 로고
    • A heuristic algorithm for loading new work on circuit pack assembly lines
    • Johri, K P., 1990, A heuristic algorithm for loading new work on circuit pack assembly lines. International Journal of Production Research, 28(10), 1871-1883.
    • (1990) International Journal of Production Research , vol.28 , Issue.10 , pp. 1871-1883
    • Johri, K.P.1
  • 16
    • 0028462998 scopus 로고
    • Impact of sequence dependent setup time on job-shop scheduling performance
    • Kim, S. C., and Bobrowski, P. M., 1994, Impact of sequence dependent setup time on job-shop scheduling performance. International Journal of ProductionResearch Research, 32(7), 1503-1520.
    • (1994) International Journal of Productionresearch Research , vol.32 , Issue.7 , pp. 1503-1520
    • Kim, S.C.1    Bobrowski, P.M.2
  • 17
    • 0027668386 scopus 로고
    • Cell formation in PCB assembly based on production quantitative data
    • Luzzatto, D., and Perona, M., 1993, Cell formation in PCB assembly based on production quantitative data. European Journal of Operations Reserach, 69, 312-329.
    • (1993) European Journal of Operations Reserach , vol.69 , pp. 312-329
    • Luzzatto, D.1    Perona, M.2
  • 20
    • 0028452709 scopus 로고
    • Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent set-up times
    • Ovacik, I. M., and Uzsoy, R., 1994, Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent set-up times. International Journal of Production Research, 32(6), 1243-1263.
    • (1994) International Journal of Production Research , vol.32 , Issue.6 , pp. 1243-1263
    • Ovacik, I.M.1    Uzsoy, R.2
  • 21
    • 0022059122 scopus 로고
    • An integer programming application to solve sequencer mix problems in printed circuit board production
    • Randhawa, S. U., McDowell, E. D., and Faruqui, S., 1985, An integer programming application to solve sequencer mix problems in printed circuit board production. International Journal of Production Research, 23(3), 543-552.
    • (1985) International Journal of Production Research , vol.23 , Issue.3 , pp. 543-552
    • Randhawa, S.U.1    McDowell, E.D.2    Faruqui, S.3
  • 22
    • 0342410155 scopus 로고
    • An experimental investigation of scheduling non-identical parallel processors with sequence-dependent set-up times and due-dates
    • RAndhawa, S. U., and Smth, T. A., 1995, An experimental investigation of scheduling non-identical parallel processors with sequence-dependent set-up times and due-dates. International Journal of Production Research, 33(1), 59-69.
    • (1995) International Journal of Production Research , vol.33 , Issue.1 , pp. 59-69
    • Randhawa, S.U.1    Smth, T.A.2
  • 23
    • 0025398905 scopus 로고
    • Material flow management in cellular configurations for small-lot, circuit card assembly
    • Rockwell, T. H., and Wilhelm, W E., 1990, Material flow management in cellular configurations for small-lot, circuit card assembly. International Journal of Production Research, 28(3), 573-593.
    • (1990) International Journal of Production Research , vol.28 , Issue.3 , pp. 573-593
    • Rockwell, T.H.1    Wilhelm, W.E.2
  • 24
    • 0027609116 scopus 로고
    • A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine
    • Sadiq, M, Landers, T. L., and Don Taylor, G, 1993, A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine. International Journal of Production Research, 31(6), 1327-1341.
    • (1993) International Journal of Production Research , vol.31 , Issue.6 , pp. 1327-1341
    • Sadiq, M.1    Landers, T.L.2    Don Taylor, G.3
  • 27
    • 0026869894 scopus 로고
    • A heuristic procedure for component scheduling in printed circuit pack sequencers
    • Sule, D. R., 1992, A heuristic procedure for component scheduling in printed circuit pack sequencers. International Journal of Production Research, 30(5), 1191-1208.
    • (1992) International Journal of Production Research , vol.30 , Issue.5 , pp. 1191-1208
    • Sule, D.R.1
  • 29
    • 0024070715 scopus 로고
    • Modes arising from a flexible manufacturing machine
    • Tang, C. S., and Denardo, E. V., 1988, Modes arising from a flexible manufacturing machine Part I: minimization of number of tool switches. Operations Research, 36(5), 767-777.
    • (1988) Operations Research , vol.36 , Issue.5 , pp. 767-777
    • Tang, C.S.1    Denardo, E.V.2
  • 30
    • 0010848654 scopus 로고
    • An examination of routeing flexibility in small batch assembly of printed circuit boards
    • Taylor, D., and Graves, R. J., 1990, An examination of routeing flexibility in small batch assembly of printed circuit boards. International Journal of Production Research, 28(11), 2117-2135.
    • (1990) International Journal of Production Research , vol.28 , Issue.11 , pp. 2117-2135
    • Taylor, D.1    Graves, R.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.