-
1
-
-
0001296956
-
Sufficient working subsets for the tour scheduling problem
-
Easton FF and Rossin DF (1991). Sufficient working subsets for the tour scheduling problem. Mgmt Sci 37: 1441-1451.
-
(1991)
Mgmt Sci
, vol.37
, pp. 1441-1451
-
-
Easton, F.F.1
Rossin, D.F.2
-
2
-
-
0028765130
-
Working set generation methods for labor tour scheduling
-
Betchold SE and Brusco MJ (1994). Working set generation methods for labor tour scheduling. Eur J Op Res 74: 540-551.
-
(1994)
Eur J Op Res
, vol.74
, pp. 540-551
-
-
Betchold, S.E.1
Brusco, M.J.2
-
3
-
-
0005268792
-
Overlapping start-time bands in implicit tour scheduling
-
Jacobs LW and Brusco MJ (1996). Overlapping start-time bands in implicit tour scheduling. Mgmt Sci, 42: 1247-1259.
-
(1996)
Mgmt Sci
, vol.42
, pp. 1247-1259
-
-
Jacobs, L.W.1
Brusco, M.J.2
-
4
-
-
0018444711
-
Operator scheduling
-
Keith EG (1979). Operator scheduling. AIIE Trans 11: 37-41.
-
(1979)
AIIE Trans
, vol.11
, pp. 37-41
-
-
Keith, E.G.1
-
5
-
-
0020797571
-
Simple approaches to shift, days-off and tour scheduling
-
Morris JG and Showalter MJ (1983). Simple approaches to shift, days-off and tour scheduling. Mgmt Sci 29: 942-950.
-
(1983)
Mgmt Sci
, vol.29
, pp. 942-950
-
-
Morris, J.G.1
Showalter, M.J.2
-
6
-
-
0043042499
-
A sequential integer programming method for discontinuous labor tour scheduling
-
Brusco MJ and Johns TR (1996). A sequential integer programming method for discontinuous labor tour scheduling. Eur J Opns Res 95: 537-548.
-
(1996)
Eur J Opns Res
, vol.95
, pp. 537-548
-
-
Brusco, M.J.1
Johns, T.R.2
-
7
-
-
84985773391
-
A comparative evaluation of tour scheduling methods
-
Betchold SE, Brusco MJ and Showalter MJ (1991). A comparative evaluation of tour scheduling methods. Dec Sci 22 683-699.
-
(1991)
Dec Sci
, vol.22
, pp. 683-699
-
-
Betchold, S.E.1
Brusco, M.J.2
Showalter, M.J.3
-
8
-
-
84947651214
-
A methodology for labor scheduling in a service operating system
-
Betchold SE and Showalter MJ (1987). A methodology for labor scheduling in a service operating system. Dec Sci 18: 89-107.
-
(1987)
Dec Sci
, vol.18
, pp. 89-107
-
-
Betchold, S.E.1
Showalter, M.J.2
-
9
-
-
0028496547
-
Solving large-scale tour scheduling problems
-
Jarrad AI, Bard JF and deSilva AH (1994). Solving large-scale tour scheduling problems. Mgmt Sci 40: 1124-1144.
-
(1994)
Mgmt Sci
, vol.40
, pp. 1124-1144
-
-
Jarrad, A.I.1
Bard, J.F.2
Desilva, A.H.3
-
10
-
-
0028532737
-
A microcomputer-based heuristic for tour scheduling of a mixed workforce
-
Betchold SE and Brusco MJ (1994). A microcomputer-based heuristic for tour scheduling of a mixed workforce. Comp Res 21, 1001-1009.
-
(1994)
Comp Res
, vol.21
, pp. 1001-1009
-
-
Betchold, S.E.1
Brusco, M.J.2
-
11
-
-
0027883451
-
A simulated annealing approach to the solution flexible labour scheduling problems
-
Brusco MJ and Jacobs LW (1993). A simulated annealing approach to the solution flexible labour scheduling problems J OplResSoc 44: 1191-1200.
-
(1993)
J Oplressoc
, vol.44
, pp. 1191-1200
-
-
Brusco, M.J.1
Jacobs, L.W.2
-
12
-
-
0000223585
-
Improving personnel scheduling at airline stations
-
Brusco MJ et al (1995). Improving personnel scheduling at airline stations. Opns Res 43: 741-751.
-
(1995)
Opns Res
, vol.43
, pp. 741-751
-
-
Brusco, M.J.1
-
13
-
-
0022883022
-
The general employee scheduling problem: An integration of MS and AI
-
Glover F and McMillan C (1986). The general employee scheduling problem: an integration of MS and AI. Comput & OperRes 13: 563-573.
-
(1986)
Comput & Operres
, vol.13
, pp. 563-573
-
-
Glover, F.1
Mc Millan, C.2
-
14
-
-
0022060907
-
Workforce size and single shift schedules with variable demands
-
Burns RN and Carter MW (1985). Workforce size and single shift schedules with variable demands Mgmt Sci 31, 599-607.
-
(1985)
Mgmt Sci
, vol.31
, pp. 599-607
-
-
Burns, R.N.1
Carter, M.W.2
-
15
-
-
0028498195
-
A multiple-shift workforce scheduling model under the 4-day workweek with weekday and weekend labour demands
-
Hung R (1994). A multiple-shift workforce scheduling model under the 4-day workweek with weekday and weekend labour demands. J Opl Res Soc 45: 1088-1092.
-
(1994)
J Opl Res Soc
, vol.45
, pp. 1088-1092
-
-
Hung, R.1
-
16
-
-
0023171522
-
A modular approach to optimal multiple-shift manpower scheduling
-
Burns RN and Koop GJ (1987). A modular approach to optimal multiple-shift manpower scheduling. Opns Res 35: 100-110.
-
(1987)
Opns Res
, vol.35
, pp. 100-110
-
-
Burns, R.N.1
Koop, G.J.2
-
17
-
-
0001422664
-
Critical event tabu search for multidimensional knapsack problem In: Osman IH and Kelly JP (eds)
-
Kluwer Academic Publishing, Norwell, MA, USA
-
Glover F and Kochenberger GA (1996). Critical event tabu search for multidimensional knapsack problem In: Osman IH and Kelly JP (eds). Meta-Heuristics: Theory and Applications. Kluwer Academic Publishing: Norwell, MA, USA, 407-427.
-
(1996)
Meta-Heuristics: Theory and Applications
, pp. 407-427
-
-
Glover, F.1
Kochenberger, G.A.2
-
18
-
-
34250097087
-
Algorithms and codes for the assignment problem
-
Carpaneto G, Martello S and Toth P (1988). Algorithms and codes for the assignment problem. Annals Opns Res 13: 193-223.
-
(1988)
Annals Opns Res
, vol.13
, pp. 193-223
-
-
Carpaneto, G.1
Martello, S.2
Toth, P.3
|