-
1
-
-
0021694201
-
Integrated Days off and Shift Personnel Scheduling
-
Bailey, J. E., "Integrated Days Off and Shift Personnel Scheduling," Computers and Industrial Engineering, 9, 4 (1985), 395-404.
-
(1985)
Computers and Industrial Engineering
, vol.9
, Issue.4
, pp. 395-404
-
-
Bailey, J.E.1
-
2
-
-
0019562318
-
A Guaranteed Accuracy Round-off Algorithm for Cyclic Scheduling and Set Covering
-
Bartholdi, J. J., III, "A Guaranteed Accuracy Round-off Algorithm for Cyclic Scheduling and Set Covering," Oper. Res., 29, 3 (1981), 501-510.
-
(1981)
Oper. Res.
, vol.29
, Issue.3
, pp. 501-510
-
-
Bartholdi III, J.J.1
-
3
-
-
0028765130
-
Working Set Generation Methods for Labor Tour Scheduling
-
Bechtold, S. E. and M. J. Brusco, "Working Set Generation Methods for Labor Tour Scheduling," European J. Oper. Res., 74, 3 (1994), 540-551.
-
(1994)
European J. Oper. Res.
, vol.74
, Issue.3
, pp. 540-551
-
-
Bechtold, S.E.1
Brusco, M.J.2
-
4
-
-
84985773391
-
A Comparative Evaluation of Labor Tour Scheduling Methods
-
_, _, and M. J. Showalter, "A Comparative Evaluation of Labor Tour Scheduling Methods," Decision Sci., 22, 4 (1991), 683-699.
-
(1991)
Decision Sci.
, vol.22
, Issue.4
, pp. 683-699
-
-
Showalter, M.J.1
-
5
-
-
0000309722
-
Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling
-
_, and L. W. Jacobs, "Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling," Management Sci., 36, 11 (1990), 1339-1351.
-
(1990)
Management Sci.
, vol.36
, Issue.11
, pp. 1339-1351
-
-
Jacobs, L.W.1
-
6
-
-
84947651214
-
A Methodology for Labor Scheduling in a Service Delivery System
-
_, and M. J. Showalter, "A Methodology for Labor Scheduling in a Service Delivery System," Decision Sci., 18, 1 (1987), 89-107.
-
(1987)
Decision Sci.
, vol.18
, Issue.1
, pp. 89-107
-
-
Showalter, M.J.1
-
7
-
-
0027543260
-
A Simulated Annealing Approach to the Cyclic Staff-Scheduling Problem
-
Brusco, M. J., and L. W. Jacobs, "A Simulated Annealing Approach to the Cyclic Staff-Scheduling Problem," Naval Res. Logistics, 40, 1 (1993), 69-84.
-
(1993)
Naval Res. Logistics
, vol.40
, Issue.1
, pp. 69-84
-
-
Brusco, M.J.1
Jacobs, L.W.2
-
8
-
-
0000223585
-
Improving Personnel Scheduling at Airline Stations
-
_, _, R. J. Bongiorno, D. V. Lyons, and B. Tang, "Improving Personnel Scheduling at Airline Stations," Operations Res., 43, 5 (1995), 741-751.
-
(1995)
Operations Res.
, vol.43
, Issue.5
, pp. 741-751
-
-
Bongiorno, R.J.1
Lyons, D.V.2
Tang, B.3
-
9
-
-
0022060907
-
Work Force Size and Single Shift Schedules with Variable Demands
-
Burns, R. N., and M. W. Carter, "Work Force Size and Single Shift Schedules with Variable Demands," Management Sci., 31, 5 (1985), 599-607.
-
(1985)
Management Sci.
, vol.31
, Issue.5
, pp. 599-607
-
-
Burns, R.N.1
Carter, M.W.2
-
10
-
-
0000722156
-
A Comment on Edie's 'Traffic Delays at Toll Booths,'
-
Dantzig, G. B., "A Comment on Edie's 'Traffic Delays at Toll Booths,'" Operations Res., 2, 3 (1954), 339-341.
-
(1954)
Operations Res.
, vol.2
, Issue.3
, pp. 339-341
-
-
Dantzig, G.B.1
-
11
-
-
0001296956
-
Sufficient Working Subsets for the Tour Scheduling Problem
-
Easton, F. F. and D. F. Rossin, "Sufficient Working Subsets for the Tour Scheduling Problem," Management Sci., 37, 11 (1991), 1441-1451.
-
(1991)
Management Sci.
, vol.37
, Issue.11
, pp. 1441-1451
-
-
Easton, F.F.1
Rossin, D.F.2
-
12
-
-
84990587419
-
Labor Utilization Effects of Work-Force Scheduling Flexibility Alternatives in a Tour Scheduling Environment
-
Jacobs, L. W. and S. E. Bechtold, "Labor Utilization Effects of Work-Force Scheduling Flexibility Alternatives in a Tour Scheduling Environment," Decision Sci., 24, 1 (1993), 148-166.
-
(1993)
Decision Sci.
, vol.24
, Issue.1
, pp. 148-166
-
-
Jacobs, L.W.1
Bechtold, S.E.2
-
13
-
-
0028496547
-
Solving Large-Scale Tour Scheduling Problems
-
Jarrah, A., J. F. Bard, and A. deSilva, "Solving Large-Scale Tour Scheduling Problems," Management Sci., 40, 9 (1994), 1124-1144.
-
(1994)
Management Sci.
, vol.40
, Issue.9
, pp. 1124-1144
-
-
Jarrah, A.1
Bard, J.F.2
DeSilva, A.3
-
14
-
-
0003391424
-
An L. P. Model for Work Force Scheduling for Banks
-
Moondra, S. L., "An L. P. Model for Work Force Scheduling for Banks," J. Bank Res., 6, 4 (1976), 299-301.
-
(1976)
J. Bank Res.
, vol.6
, Issue.4
, pp. 299-301
-
-
Moondra, S.L.1
-
15
-
-
0020797571
-
Simple Approaches to Shift, Days-Off and Tour Scheduling
-
Morris, J. G. and M. J. Showalter, "Simple Approaches to Shift, Days-Off and Tour Scheduling," Management Sci., 29, 8 (1983), 942-950.
-
(1983)
Management Sci.
, vol.29
, Issue.8
, pp. 942-950
-
-
Morris, J.G.1
Showalter, M.J.2
-
16
-
-
0003690191
-
-
The Scientific Press, San Francisco, CA
-
Schrage, L., LINDO User's Manual, Release 5.0, The Scientific Press, San Francisco, CA, 1991.
-
(1991)
LINDO User's Manual, Release 5.0
-
-
Schrage, L.1
-
17
-
-
0003332325
-
Improved Implicit Optimal Modeling of the Shift Scheduling Problem
-
Thompson, G. M., "Improved Implicit Optimal Modeling of the Shift Scheduling Problem," Management Sci., 41, 4 (1995), 595-607.
-
(1995)
Management Sci.
, vol.41
, Issue.4
, pp. 595-607
-
-
Thompson, G.M.1
|