메뉴 건너뛰기




Volumn 42, Issue 9, 1996, Pages 1247-1259

Overlapping start-time bands in implicit tour scheduling

Author keywords

Implicit Formulation; Integer Programming; Personnel Scheduling

Indexed keywords


EID: 0005268792     PISSN: 00251909     EISSN: None     Source Type: Journal    
DOI: 10.1287/mnsc.42.9.1247     Document Type: Article
Times cited : (36)

References (17)
  • 1
    • 0021694201 scopus 로고
    • Integrated Days off and Shift Personnel Scheduling
    • Bailey, J. E., "Integrated Days Off and Shift Personnel Scheduling," Computers and Industrial Engineering, 9, 4 (1985), 395-404.
    • (1985) Computers and Industrial Engineering , vol.9 , Issue.4 , pp. 395-404
    • Bailey, J.E.1
  • 2
    • 0019562318 scopus 로고
    • A Guaranteed Accuracy Round-off Algorithm for Cyclic Scheduling and Set Covering
    • Bartholdi, J. J., III, "A Guaranteed Accuracy Round-off Algorithm for Cyclic Scheduling and Set Covering," Oper. Res., 29, 3 (1981), 501-510.
    • (1981) Oper. Res. , vol.29 , Issue.3 , pp. 501-510
    • Bartholdi III, J.J.1
  • 3
    • 0028765130 scopus 로고
    • Working Set Generation Methods for Labor Tour Scheduling
    • Bechtold, S. E. and M. J. Brusco, "Working Set Generation Methods for Labor Tour Scheduling," European J. Oper. Res., 74, 3 (1994), 540-551.
    • (1994) European J. Oper. Res. , vol.74 , Issue.3 , pp. 540-551
    • Bechtold, S.E.1    Brusco, M.J.2
  • 4
    • 84985773391 scopus 로고
    • A Comparative Evaluation of Labor Tour Scheduling Methods
    • _, _, and M. J. Showalter, "A Comparative Evaluation of Labor Tour Scheduling Methods," Decision Sci., 22, 4 (1991), 683-699.
    • (1991) Decision Sci. , vol.22 , Issue.4 , pp. 683-699
    • Showalter, M.J.1
  • 5
    • 0000309722 scopus 로고
    • Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling
    • _, and L. W. Jacobs, "Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling," Management Sci., 36, 11 (1990), 1339-1351.
    • (1990) Management Sci. , vol.36 , Issue.11 , pp. 1339-1351
    • Jacobs, L.W.1
  • 6
    • 84947651214 scopus 로고
    • A Methodology for Labor Scheduling in a Service Delivery System
    • _, and M. J. Showalter, "A Methodology for Labor Scheduling in a Service Delivery System," Decision Sci., 18, 1 (1987), 89-107.
    • (1987) Decision Sci. , vol.18 , Issue.1 , pp. 89-107
    • Showalter, M.J.1
  • 7
    • 0027543260 scopus 로고
    • A Simulated Annealing Approach to the Cyclic Staff-Scheduling Problem
    • Brusco, M. J., and L. W. Jacobs, "A Simulated Annealing Approach to the Cyclic Staff-Scheduling Problem," Naval Res. Logistics, 40, 1 (1993), 69-84.
    • (1993) Naval Res. Logistics , vol.40 , Issue.1 , pp. 69-84
    • Brusco, M.J.1    Jacobs, L.W.2
  • 8
    • 0000223585 scopus 로고
    • Improving Personnel Scheduling at Airline Stations
    • _, _, R. J. Bongiorno, D. V. Lyons, and B. Tang, "Improving Personnel Scheduling at Airline Stations," Operations Res., 43, 5 (1995), 741-751.
    • (1995) Operations Res. , vol.43 , Issue.5 , pp. 741-751
    • Bongiorno, R.J.1    Lyons, D.V.2    Tang, B.3
  • 9
    • 0022060907 scopus 로고
    • Work Force Size and Single Shift Schedules with Variable Demands
    • Burns, R. N., and M. W. Carter, "Work Force Size and Single Shift Schedules with Variable Demands," Management Sci., 31, 5 (1985), 599-607.
    • (1985) Management Sci. , vol.31 , Issue.5 , pp. 599-607
    • Burns, R.N.1    Carter, M.W.2
  • 10
    • 0000722156 scopus 로고
    • A Comment on Edie's 'Traffic Delays at Toll Booths,'
    • Dantzig, G. B., "A Comment on Edie's 'Traffic Delays at Toll Booths,'" Operations Res., 2, 3 (1954), 339-341.
    • (1954) Operations Res. , vol.2 , Issue.3 , pp. 339-341
    • Dantzig, G.B.1
  • 11
    • 0001296956 scopus 로고
    • Sufficient Working Subsets for the Tour Scheduling Problem
    • Easton, F. F. and D. F. Rossin, "Sufficient Working Subsets for the Tour Scheduling Problem," Management Sci., 37, 11 (1991), 1441-1451.
    • (1991) Management Sci. , vol.37 , Issue.11 , pp. 1441-1451
    • Easton, F.F.1    Rossin, D.F.2
  • 12
    • 84990587419 scopus 로고
    • Labor Utilization Effects of Work-Force Scheduling Flexibility Alternatives in a Tour Scheduling Environment
    • Jacobs, L. W. and S. E. Bechtold, "Labor Utilization Effects of Work-Force Scheduling Flexibility Alternatives in a Tour Scheduling Environment," Decision Sci., 24, 1 (1993), 148-166.
    • (1993) Decision Sci. , vol.24 , Issue.1 , pp. 148-166
    • Jacobs, L.W.1    Bechtold, S.E.2
  • 13
    • 0028496547 scopus 로고
    • Solving Large-Scale Tour Scheduling Problems
    • Jarrah, A., J. F. Bard, and A. deSilva, "Solving Large-Scale Tour Scheduling Problems," Management Sci., 40, 9 (1994), 1124-1144.
    • (1994) Management Sci. , vol.40 , Issue.9 , pp. 1124-1144
    • Jarrah, A.1    Bard, J.F.2    DeSilva, A.3
  • 14
    • 0003391424 scopus 로고
    • An L. P. Model for Work Force Scheduling for Banks
    • Moondra, S. L., "An L. P. Model for Work Force Scheduling for Banks," J. Bank Res., 6, 4 (1976), 299-301.
    • (1976) J. Bank Res. , vol.6 , Issue.4 , pp. 299-301
    • Moondra, S.L.1
  • 15
    • 0020797571 scopus 로고
    • Simple Approaches to Shift, Days-Off and Tour Scheduling
    • Morris, J. G. and M. J. Showalter, "Simple Approaches to Shift, Days-Off and Tour Scheduling," Management Sci., 29, 8 (1983), 942-950.
    • (1983) Management Sci. , vol.29 , Issue.8 , pp. 942-950
    • Morris, J.G.1    Showalter, M.J.2
  • 17
    • 0003332325 scopus 로고
    • Improved Implicit Optimal Modeling of the Shift Scheduling Problem
    • Thompson, G. M., "Improved Implicit Optimal Modeling of the Shift Scheduling Problem," Management Sci., 41, 4 (1995), 595-607.
    • (1995) Management Sci. , vol.41 , Issue.4 , pp. 595-607
    • Thompson, G.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.