메뉴 건너뛰기




Volumn 95, Issue 3, 1996, Pages 537-548

A sequential integer programming method for discontinuous labor tour scheduling

Author keywords

Heuristics; Integer programming; Scheduling; Service

Indexed keywords


EID: 0043042499     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(97)81461-0     Document Type: Article
Times cited : (27)

References (43)
  • 1
    • 0021694201 scopus 로고
    • Integrated days off and shift personnel scheduling
    • Bailey, J.E., "Integrated days off and shift personnel scheduling", Computers and Industrial Engineering 9 (1985) 395-404.
    • (1985) Computers and Industrial Engineering , vol.9 , pp. 395-404
    • Bailey, J.E.1
  • 2
    • 84896876201 scopus 로고
    • Workforce allocation in cyclical scheduling problems: A survey
    • Baker, K.R., "Workforce allocation in cyclical scheduling problems: A survey", Operational Research Quarterly 27 (1976) 155-167.
    • (1976) Operational Research Quarterly , vol.27 , pp. 155-167
    • Baker, K.R.1
  • 3
    • 0017547182 scopus 로고
    • Workforce scheduling with cyclic demands and day-off constraints
    • Baker, K.R. and Magazine, M.J., "Workforce scheduling with cyclic demands and day-off constraints", Management Science 24 (1977) 161-167.
    • (1977) Management Science , vol.24 , pp. 161-167
    • Baker, K.R.1    Magazine, M.J.2
  • 4
    • 0019562318 scopus 로고
    • A guaranteed-accuracy round-off algorithm for cyclic scheduling and set covering
    • Bartholdi, III, J.J., "A guaranteed-accuracy round-off algorithm for cyclic scheduling and set covering", Operations Research 29 (1981) 501-510.
    • (1981) Operations Research , vol.29 , pp. 501-510
    • Bartholdi J.J. III1
  • 5
    • 84985853243 scopus 로고
    • Implicit optimal and heuristic labor staffing in a multi-objective, multilocation environment
    • Bechtold, S.E., "Implicit optimal and heuristic labor staffing in a multi-objective, multilocation environment", Decision Sciences 19 (1988) 353-373.
    • (1988) Decision Sciences , vol.19 , pp. 353-373
    • Bechtold, S.E.1
  • 6
    • 0028532737 scopus 로고
    • A microcomputer-based heuristic for tour scheduling of a mixed workforce
    • Bechtold, S.E., and Brusco, M.J., "A microcomputer-based heuristic for tour scheduling of a mixed workforce", Computers & Operations Research 21 (1994) 1001-1009.
    • (1994) Computers & Operations Research , vol.21 , pp. 1001-1009
    • Bechtold, S.E.1    Brusco, M.J.2
  • 8
    • 84985773391 scopus 로고
    • A comparative evaluation of labor tour scheduling methods
    • Bechtold, S.E., Brusco, M.J., and Showalter, M.J., "A comparative evaluation of labor tour scheduling methods", Decision Sciences 22 (1991) 683-699.
    • (1991) Decision Sciences , vol.22 , pp. 683-699
    • Bechtold, S.E.1    Brusco, M.J.2    Showalter, M.J.3
  • 9
    • 0000309722 scopus 로고
    • Implicit modeling of flexible break assignments in optimal shift scheduling
    • Bechtold, S.E., and Jacobs, L.W., "Implicit modeling of flexible break assignments in optimal shift scheduling", Management Science 36 (1990) 1339-1351.
    • (1990) Management Science , vol.36 , pp. 1339-1351
    • Bechtold, S.E.1    Jacobs, L.W.2
  • 10
    • 84947651214 scopus 로고
    • A methodology for labor scheduling in a service operating system
    • Bechtold, S.E., and Showalter, M.J., "A methodology for labor scheduling in a service operating system", Decision Sciences 18 (1987) 89-107.
    • (1987) Decision Sciences , vol.18 , pp. 89-107
    • Bechtold, S.E.1    Showalter, M.J.2
  • 11
    • 0041671523 scopus 로고
    • The Hastus vehicle and manpower scheduling systems at the Société de Transport de la Communauté Urbaine de Montréal
    • Blais, J., Lamont, J., and Rousseau, J., "The Hastus vehicle and manpower scheduling systems at the Société de Transport de la Communauté Urbaine de Montréal", Interfaces 20 (1990) 26-42.
    • (1990) Interfaces , vol.20 , pp. 26-42
    • Blais, J.1    Lamont, J.2    Rousseau, J.3
  • 12
    • 0027543260 scopus 로고
    • A simulated annealing approach to the cyclic staff-scheduling problem
    • Brusco, M.J., and Jacobs, L.W., "A simulated annealing approach to the cyclic staff-scheduling problem", Naval Research Logistics 40 (1993) 69-84.
    • (1993) Naval Research Logistics , vol.40 , pp. 69-84
    • Brusco, M.J.1    Jacobs, L.W.2
  • 13
    • 0029471493 scopus 로고
    • Cost analysis of alternative formulations for personnel scheduling in continuously operating organizations
    • Brusco, M.J., and Jacobs, L.W., "Cost analysis of alternative formulations for personnel scheduling in continuously operating organizations", European Journal of Operational Research 86 (1995) 249-261.
    • (1995) European Journal of Operational Research , vol.86 , pp. 249-261
    • Brusco, M.J.1    Jacobs, L.W.2
  • 15
    • 84989491929 scopus 로고
    • An integrated work shift scheduling system
    • Buffa, E.S., Cosgrove, M.J., and Luce, B.J., "An integrated work shift scheduling system", Decision Sciences 7 (1976) 620-630.
    • (1976) Decision Sciences , vol.7 , pp. 620-630
    • Buffa, E.S.1    Cosgrove, M.J.2    Luce, B.J.3
  • 16
    • 0022060907 scopus 로고
    • Work force size and single shift schedules with variable demands
    • Burns, R., and Carter, M., "Work force size and single shift schedules with variable demands", Management Science 31 (1985) 599-607.
    • (1985) Management Science , vol.31 , pp. 599-607
    • Burns, R.1    Carter, M.2
  • 18
    • 0000722156 scopus 로고
    • A comment on Edie's 'Traffic delays at toll booths'
    • Dantzig, G.B., "A comment on Edie's 'Traffic delays at toll booths'", Operations Research 2 (1954) 339-341.
    • (1954) Operations Research , vol.2 , pp. 339-341
    • Dantzig, G.B.1
  • 19
    • 0042673342 scopus 로고
    • A dynamic programming approach to workforce scheduling with time-dependent performance measures
    • Davis, S., and Reutzel, E., "A dynamic programming approach to workforce scheduling with time-dependent performance measures", Journal of Operations Management 1 (1981) 165-171.
    • (1981) Journal of Operations Management , vol.1 , pp. 165-171
    • Davis, S.1    Reutzel, E.2
  • 21
    • 84985773418 scopus 로고
    • Equivalent alternate solutions for the tour scheduling problem
    • Easton, F.F., and Rossin, D.F., "Equivalent alternate solutions for the tour scheduling problem", Decision Sciences 22 (1991) 985-1007.
    • (1991) Decision Sciences , vol.22 , pp. 985-1007
    • Easton, F.F.1    Rossin, D.F.2
  • 22
    • 0001296956 scopus 로고
    • Sufficient working subsets for the tour scheduling problem
    • Easton, F.F., and Rossin, D.F., "Sufficient working subsets for the tour scheduling problem", Management Science 37 (1991) 1441-1451.
    • (1991) Management Science , vol.37 , pp. 1441-1451
    • Easton, F.F.1    Rossin, D.F.2
  • 23
    • 0022026652 scopus 로고
    • Workforce scheduling with cyclic requirements and constraints on days off, weekends off, and work-stretch
    • Emmons, H., "Workforce scheduling with cyclic requirements and constraints on days off, weekends off, and work-stretch", IIE Transactions 17 (1985) 8-16.
    • (1985) IIE Transactions , vol.17 , pp. 8-16
    • Emmons, H.1
  • 24
    • 0026163585 scopus 로고
    • Off-day scheduling with hierarchical worker categories
    • Emmons, H., and Burns, R., "Off-day scheduling with hierarchical worker categories", Operations Research 39 (1991) 484-495.
    • (1991) Operations Research , vol.39 , pp. 484-495
    • Emmons, H.1    Burns, R.2
  • 26
    • 0016985083 scopus 로고
    • Heuristic methods for telephone operator shift scheduling: An experimental analysis
    • Henderson, W.B., and Berry, W.L., "Heuristic methods for telephone operator shift scheduling: An experimental analysis", Management Science 22 (1976) 1372-1380.
    • (1976) Management Science , vol.22 , pp. 1372-1380
    • Henderson, W.B.1    Berry, W.L.2
  • 28
    • 0000183015 scopus 로고
    • Multiple-shift workforce scheduling under the 3-4 workweek with different weekday and weekend requirements
    • Hung, R., "Multiple-shift workforce scheduling under the 3-4 workweek with different weekday and weekend requirements", Management Science 40 (1994) 280-284.
    • (1994) Management Science , vol.40 , pp. 280-284
    • Hung, R.1
  • 29
    • 84990587419 scopus 로고
    • Labor utilization effects of labor scheduling flexibility alternatives in a tour scheduling environment
    • Jacobs, L.W., and Bechtold, S.E., "Labor utilization effects of labor scheduling flexibility alternatives in a tour scheduling environment", Decision Sciences 24(1993) 148-166.
    • (1993) Decision Sciences , vol.24 , pp. 148-166
    • Jacobs, L.W.1    Bechtold, S.E.2
  • 30
    • 0028496547 scopus 로고
    • Solving large-scale tour scheduling problems
    • Jarrah, A., Bard, J., and deSilva, A., "Solving large-scale tour scheduling problems", Management Science 40 (1994) 1124-1144.
    • (1994) Management Science , vol.40 , pp. 1124-1144
    • Jarrah, A.1    Bard, J.2    DeSilva, A.3
  • 31
    • 85029992839 scopus 로고
    • An effective construction heuristic for labor tour scheduling
    • Decision Sciences Institute, Atlanta, GA
    • Johns, T.R., "An effective construction heuristic for labor tour scheduling", in: Proceedings of the 1993 Decision Sciences Institute National Meeting, Decision Sciences Institute, Atlanta, GA, 1993.
    • (1993) Proceedings of the 1993 Decision Sciences Institute National Meeting
    • Johns, T.R.1
  • 32
    • 0018444711 scopus 로고
    • Operator scheduling
    • Keith, E., "Operator scheduling", AIIE Transactions 11 (1979) 37-41.
    • (1979) AIIE Transactions , vol.11 , pp. 37-41
    • Keith, E.1
  • 35
    • 0020132677 scopus 로고
    • A simulation analysis of tour-shift construction procedures
    • Mabert, V.A., and Watts, C.A., "A simulation analysis of tour-shift construction procedures", Management Science 28 (1982) 520-532.
    • (1982) Management Science , vol.28 , pp. 520-532
    • Mabert, V.A.1    Watts, C.A.2
  • 37
    • 0020797571 scopus 로고
    • Simple approaches to shift, days-off and tour scheduling
    • Morris, J.G., and Showalter, M.J., "Simple approaches to shift, days-off and tour scheduling", Management Science 29 (1983) 942-950.
    • (1983) Management Science , vol.29 , pp. 942-950
    • Morris, J.G.1    Showalter, M.J.2
  • 39
    • 0042172211 scopus 로고
    • Scheduling manpower by mathematical programming
    • Rothstein, M., "Scheduling manpower by mathematical programming", Industrial Engineering 4 (1972) 29-33.
    • (1972) Industrial Engineering , vol.4 , pp. 29-33
    • Rothstein, M.1
  • 41
    • 0016079835 scopus 로고
    • The operator scheduling problem: A network-flow approach
    • Segal, M., "The operator scheduling problem: A network-flow approach", Operations Research 22 (1974) 808-823.
    • (1974) Operations Research , vol.22 , pp. 808-823
    • Segal, M.1
  • 43
    • 0003332325 scopus 로고
    • Improved implicit optimal modeling of the shift scheduling problem
    • Thompson, G.M., "'Improved implicit optimal modeling of the shift scheduling problem", Management Science 41 (1995) 595-607.
    • (1995) Management Science , vol.41 , pp. 595-607
    • Thompson, G.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.