메뉴 건너뛰기




Volumn 6, Issue 2, 1999, Pages 112-122

Characterization of a set of schedules in a resource-constrained multi-project scheduling problem with multiple modes

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SOFTWARE; CONSTRAINT THEORY; HEURISTIC METHODS; INDUSTRIAL MANAGEMENT; OPTIMIZATION; PROJECT MANAGEMENT; RESOURCE ALLOCATION;

EID: 0032653344     PISSN: 10724761     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (21)

References (20)
  • 1
    • 0001849846 scopus 로고
    • Heuristic Algorithms for Resource-Constrained Project Scheduling: A Review and an Empirical Analysis
    • R. Slowinski, J. Weglarz, Amsterdam: Elsevier
    • Alvarez-Valdes, R and Tamarit, J.M. (1989). Heuristic Algorithms for Resource-Constrained Project Scheduling: A Review and an Empirical Analysis. Advances in Project Scheduling, R. Slowinski, J. Weglarz, Amsterdam: Elsevier, 113-134.
    • (1989) Advances in Project Scheduling , pp. 113-134
    • Alvarez-Valdes, R.1    Tamarit, J.M.2
  • 5
    • 85013191950 scopus 로고    scopus 로고
    • Characterization of a Set of Schedules in a Multiple Resource Context
    • Billaut, J. C. and Roubellat, F. (1996b). Characterization of a Set of Schedules in a Multiple Resource Context. Journal of Decision Systems, 5(1-2): 95-109.
    • (1996) Journal of Decision Systems , vol.5 , Issue.1-2 , pp. 95-109
    • Billaut, J.C.1    Roubellat, F.2
  • 6
    • 0030216966 scopus 로고    scopus 로고
    • Resource-Constrained Project Scheduling by Simulated Annealing
    • Boctor, F. (1996). Resource-Constrained Project Scheduling by Simulated Annealing'. International Journal of Production Research, 34(8): 2335-2351.
    • (1996) International Journal of Production Research , vol.34 , Issue.8 , pp. 2335-2351
    • Boctor, F.1
  • 9
    • 0002907360 scopus 로고
    • A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
    • Demeulemeester, E. and Herroelen, W.S. (1992). A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem. Management Science, 38: 1803-1818.
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.S.2
  • 10
    • 2442737544 scopus 로고
    • An Approach for Real Time Scheduling for Activities with Time and Resource Constraints
    • R. Slowinski, J. Weglarz, Amsterdam: Elsevier
    • Erschler, J. and Roubellat, F. (1989). An Approach for Real Time Scheduling for Activities with Time and Resource Constraints. Advances in Project Scheduling, R. Slowinski, J. Weglarz, Amsterdam: Elsevier, pp. 237-277.
    • (1989) Advances in Project Scheduling , pp. 237-277
    • Erschler, J.1    Roubellat, F.2
  • 12
    • 0001896880 scopus 로고    scopus 로고
    • Adaptive Search for Solving Hard Project Scheduling Problems
    • Kolisch, R. and Drexl, A. (1996a). Adaptive Search for Solving Hard Project Scheduling Problems. Naval Research Logistics, 43: 23-40.
    • (1996) Naval Research Logistics , vol.43 , pp. 23-40
    • Kolisch, R.1    Drexl, A.2
  • 14
    • 0038319489 scopus 로고    scopus 로고
    • Research Report 396, Institut fur Betriebswirtschaftslehre, Christian-Albrechts-Universitat zu kiel
    • Kolish, R. and Sprecher, A. (1996c). PSPLIB - A Project Scheduling Problem Library. Research Report 396, Institut fur Betriebswirtschaftslehre, Christian-Albrechts-Universitat zu kiel.
    • (1996) PSPLIB - A Project Scheduling Problem Library
    • Kolish, R.1    Sprecher, A.2
  • 15
    • 0030151930 scopus 로고    scopus 로고
    • Search Heuristics for Resource Constrained Project Scheduling
    • Lee, J-K. and Kim, T-D. (1996). Search Heuristics for Resource Constrained Project Scheduling. Journal of the Operational Research Society, 47: 678-689.
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 678-689
    • Lee, J.-K.1    Kim, T.-D.2
  • 16
    • 0030270996 scopus 로고    scopus 로고
    • An Interactive Decision Support System for the Resource Constrained Scheduling Problem
    • Norbis, M. and MacGregor-Smith, J. (1996). An Interactive Decision Support System for the Resource Constrained Scheduling Problem. European Journal of Operational Research, 94: 54-65.
    • (1996) European Journal of Operational Research , vol.94 , pp. 54-65
    • Norbis, M.1    MacGregor-Smith, J.2
  • 17
    • 0021460636 scopus 로고
    • A Comparison of Exact Procedures for Solving the Multiple Resource Constrained Project Scheduling Problem
    • Patterson, J.H. (1984). A Comparison of Exact Procedures for Solving the Multiple Resource Constrained Project Scheduling Problem. Management Science, 30(7): 854-867.
    • (1984) Management Science , vol.30 , Issue.7 , pp. 854-867
    • Patterson, J.H.1
  • 20
    • 0028396719 scopus 로고
    • A Constraint Based Perspective in Resource Constrained Project Scheduling
    • Ulusoy, G. and Ozdarnar, L. (1994). A Constraint Based Perspective in Resource Constrained Project Scheduling. International Journal of Production Research, 32(3): 693-705.
    • (1994) International Journal of Production Research , vol.32 , Issue.3 , pp. 693-705
    • Ulusoy, G.1    Ozdarnar, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.