Heuristic Algorithms for Resource-Constrained Project Scheduling: A Review and an Empirical Analysis
-
R. Slowinski, J. Weglarz, Amsterdam: Elsevier
-
Alvarez-Valdes, R and Tamarit, J.M. (1989). Heuristic Algorithms for Resource-Constrained Project Scheduling: A Review and an Empirical Analysis. Advances in Project Scheduling, R. Slowinski, J. Weglarz, Amsterdam: Elsevier, 113-134.
-
(1989)
Advances in Project Scheduling
, pp. 113-134
-
-
Alvarez-Valdes, R.1
Tamarit, J.M.2
-
3
-
-
2442752317
-
Solving Resource-Constrained Project Scheduling with CHIP
-
EURO PMS, Poznan, Poland
-
Beldiceanu, N., Bourreau, E., Rivreau D, and Simonis, H. (1996). Solving Resource-Constrained Project Scheduling with CHIP. Proceedings of 5th International Workshop on Project Management and Scheduling, EURO PMS, Poznan, Poland, pp 35-38.
-
(1996)
Proceedings of 5th International Workshop on Project Management and Scheduling
, pp. 35-38
-
-
Beldiceanu, N.1
Bourreau, E.2
Rivreau, D.3
Simonis, H.4
-
5
-
-
85013191950
-
Characterization of a Set of Schedules in a Multiple Resource Context
-
Billaut, J. C. and Roubellat, F. (1996b). Characterization of a Set of Schedules in a Multiple Resource Context. Journal of Decision Systems, 5(1-2): 95-109.
-
(1996)
Journal of Decision Systems
, vol.5
, Issue.1-2
, pp. 95-109
-
-
Billaut, J.C.1
Roubellat, F.2
-
6
-
-
0030216966
-
Resource-Constrained Project Scheduling by Simulated Annealing
-
Boctor, F. (1996). Resource-Constrained Project Scheduling by Simulated Annealing'. International Journal of Production Research, 34(8): 2335-2351.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.8
, pp. 2335-2351
-
-
Boctor, F.1
-
7
-
-
25544451818
-
-
LAAS Report 96178, Laboratoire d'Analyse et d'Architecture des Systèmes du CNRS, Toulouse, France
-
Dauzère Pérès, S., Roux, W. and Lasserre, J.B. (1996). Multi-Resource Shop Scheduling with Resource Flexibility, LAAS Report 96178, Laboratoire d'Analyse et d'Architecture des Systèmes du CNRS, Toulouse, France.
-
(1996)
Multi-Resource Shop Scheduling with Resource Flexibility
-
-
Dauzère Pérès, S.1
Roux, W.2
Lasserre, J.B.3
-
8
-
-
0026417681
-
A Decomposition Approach to Multi-Project Scheduling
-
Deckro, R.F., Winkofsky, E.P., Hebert, J.E. and Gagnon, R. (1991). A Decomposition Approach to Multi-Project Scheduling. European Journal of Operational Research, 51: 110-118.
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 110-118
-
-
Deckro, R.F.1
Winkofsky, E.P.2
Hebert, J.E.3
Gagnon, R.4
-
9
-
-
0002907360
-
A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
-
Demeulemeester, E. and Herroelen, W.S. (1992). A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem. Management Science, 38: 1803-1818.
-
(1992)
Management Science
, vol.38
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.S.2
-
10
-
-
2442737544
-
An Approach for Real Time Scheduling for Activities with Time and Resource Constraints
-
R. Slowinski, J. Weglarz, Amsterdam: Elsevier
-
Erschler, J. and Roubellat, F. (1989). An Approach for Real Time Scheduling for Activities with Time and Resource Constraints. Advances in Project Scheduling, R. Slowinski, J. Weglarz, Amsterdam: Elsevier, pp. 237-277.
-
(1989)
Advances in Project Scheduling
, pp. 237-277
-
-
Erschler, J.1
Roubellat, F.2
-
12
-
-
0001896880
-
Adaptive Search for Solving Hard Project Scheduling Problems
-
Kolisch, R. and Drexl, A. (1996a). Adaptive Search for Solving Hard Project Scheduling Problems. Naval Research Logistics, 43: 23-40.
-
(1996)
Naval Research Logistics
, vol.43
, pp. 23-40
-
-
Kolisch, R.1
Drexl, A.2
-
14
-
-
0038319489
-
-
Research Report 396, Institut fur Betriebswirtschaftslehre, Christian-Albrechts-Universitat zu kiel
-
Kolish, R. and Sprecher, A. (1996c). PSPLIB - A Project Scheduling Problem Library. Research Report 396, Institut fur Betriebswirtschaftslehre, Christian-Albrechts-Universitat zu kiel.
-
(1996)
PSPLIB - A Project Scheduling Problem Library
-
-
Kolish, R.1
Sprecher, A.2
-
16
-
-
0030270996
-
An Interactive Decision Support System for the Resource Constrained Scheduling Problem
-
Norbis, M. and MacGregor-Smith, J. (1996). An Interactive Decision Support System for the Resource Constrained Scheduling Problem. European Journal of Operational Research, 94: 54-65.
-
(1996)
European Journal of Operational Research
, vol.94
, pp. 54-65
-
-
Norbis, M.1
MacGregor-Smith, J.2
-
17
-
-
0021460636
-
A Comparison of Exact Procedures for Solving the Multiple Resource Constrained Project Scheduling Problem
-
Patterson, J.H. (1984). A Comparison of Exact Procedures for Solving the Multiple Resource Constrained Project Scheduling Problem. Management Science, 30(7): 854-867.
-
(1984)
Management Science
, vol.30
, Issue.7
, pp. 854-867
-
-
Patterson, J.H.1
-
18
-
-
0001541244
-
Using Tabu Search for Solving the Resource-Constrained Project scheduling problem
-
EURO WG-PMS, Leuven, Belgium
-
Pinson, E., Prins, C. and Ruller, F. (1994). Using Tabu Search for Solving the Resource-Constrained Project scheduling problem. Proceedings of 4th International Workshop on Project Management and Scheduling, EURO WG-PMS, Leuven, Belgium, pp. 102-106.
-
(1994)
Proceedings of 4th International Workshop on Project Management and Scheduling
, pp. 102-106
-
-
Pinson, E.1
Prins, C.2
Ruller, F.3
-
20
-
-
0028396719
-
A Constraint Based Perspective in Resource Constrained Project Scheduling
-
Ulusoy, G. and Ozdarnar, L. (1994). A Constraint Based Perspective in Resource Constrained Project Scheduling. International Journal of Production Research, 32(3): 693-705.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.3
, pp. 693-705
-
-
Ulusoy, G.1
Ozdarnar, L.2
|