-
1
-
-
0019691416
-
A branch and bound network algorithm for interactive process scheduling
-
Baker, T. (1981), "A Branch and Bound network algorithm for interactive process scheduling", Mathematical Programming Study 15, 43-57.
-
(1981)
Mathematical Programming Study
, vol.15
, pp. 43-57
-
-
Baker, T.1
-
2
-
-
0026900932
-
A multicriteria scheduling tool using a branch-and-bound algorithm
-
Bausch, R. (1992), "A multicriteria scheduling tool using a Branch-and-Bound algorithm", European Journal of Operational Research 61, 215-218.
-
(1992)
European Journal of Operational Research
, vol.61
, pp. 215-218
-
-
Bausch, R.1
-
3
-
-
0019491059
-
Solving the resource constrained deadline scheduling problem via reduction to the network flow problem
-
Blazewicz, J. (1981), "Solving the resource constrained deadline scheduling problem via reduction to the network flow problem", European Journal of Operational Research 6, 75-79.
-
(1981)
European Journal of Operational Research
, vol.6
, pp. 75-79
-
-
Blazewicz, J.1
-
4
-
-
0000813734
-
An algorithm for optimal project scheduling under multiple resource constraints
-
Davis, E., and Heidom, G. (1971), "An algorithm for optimal project scheduling under multiple resource constraints", Management Science 17, B803-B816.
-
(1971)
Management Science
, vol.17
-
-
Davis, E.1
Heidom, G.2
-
5
-
-
0020266918
-
Multiple criteria job-shop scheduling
-
Deckro, R., Hebert, J., and Winkofsky, E. (1982), "Multiple criteria job-shop scheduling", Computers & Operations Research 9, 279-285.
-
(1982)
Computers & Operations Research
, vol.9
, pp. 279-285
-
-
Deckro, R.1
Hebert, J.2
Winkofsky, E.3
-
6
-
-
0011522042
-
A computer aided decision system
-
Ferguson, R., and Jones, C. (1969), "A computer aided decision system", Management Science 15, B550-B561.
-
(1969)
Management Science
, vol.15
-
-
Ferguson, R.1
Jones, C.2
-
7
-
-
0002983810
-
Optimal solution of scheduling problems using lagrange multipliers: Part I
-
Fisher, M. (1973), "Optimal solution of scheduling problems using Lagrange multipliers: Part I", Operations Research 21, 1114-1127.
-
(1973)
Operations Research
, vol.21
, pp. 1114-1127
-
-
Fisher, M.1
-
8
-
-
0021437506
-
An application of multiple criteria decision making principles for planning machining operations
-
Ghiassi, M., De Vor, R., Dessouky, M., and Kijowski, B. (1984), "An application of multiple criteria decision making principles for planning machining operations", IIE Transactions 16, 106-114.
-
(1984)
IIE Transactions
, vol.16
, pp. 106-114
-
-
Ghiassi, M.1
De Vor, R.2
Dessouky, M.3
Kijowski, B.4
-
9
-
-
0018012519
-
Interactive scheduling: Historical survey and state of the art
-
Godin, V. (1978), "Interactive scheduling: Historical survey and state of the art", AIIE Transactions 10, 331-337.
-
(1978)
AIIE Transactions
, vol.10
, pp. 331-337
-
-
Godin, V.1
-
10
-
-
0020782430
-
Master production scheduling: A multiple-objective linear programming approach
-
Gonzalez, J., and Reeves, G. (1983) "Master production scheduling: A multiple-objective linear programming approach", International Journal of Production Research 21, 553-562.
-
(1983)
International Journal of Production Research
, vol.21
, pp. 553-562
-
-
Gonzalez, J.1
Reeves, G.2
-
11
-
-
0026904814
-
A multicriterion view of optimal resource allocation in job-shop production
-
Gravel, M., Martel, J., Nadeau, R., Price, W., and Tremblay, R. (1992), "A multicriterion view of optimal resource allocation in job-shop production", European Journal of Operational Research 61, 230-244.
-
(1992)
European Journal of Operational Research
, vol.61
, pp. 230-244
-
-
Gravel, M.1
Martel, J.2
Nadeau, R.3
Price, W.4
Tremblay, R.5
-
12
-
-
0018976963
-
On the interactive solution to a multicriteria scheduling problem
-
Huckert, R., Rhode, R., Roglin, O., and Weber, R. (1980), "On the interactive solution to a multicriteria scheduling problem", Zeitschrift für Operations Research 24, 47-60.
-
(1980)
Zeitschrift für Operations Research
, vol.24
, pp. 47-60
-
-
Huckert, R.1
Rhode, R.2
Roglin, O.3
Weber, R.4
-
13
-
-
0002884211
-
On computational complexity of combinatorial problems
-
Karp, R. (1975), "On computational complexity of combinatorial problems", Networks 5, 45-68.
-
(1975)
Networks
, vol.5
, pp. 45-68
-
-
Karp, R.1
-
14
-
-
0026961938
-
Multiple criteria decision support - A review
-
Korhonen, P., Moskowitz, H., and Wallenius, J. (1992), "Multiple criteria decision support - A review", European Journal of Operational Research 63, 361-375.
-
(1992)
European Journal of Operational Research
, vol.63
, pp. 361-375
-
-
Korhonen, P.1
Moskowitz, H.2
Wallenius, J.3
-
15
-
-
0024903966
-
A gradient-based approach for solving hierarchical multicriteria production planning problems
-
Malakooti, B. (1989), "A gradient-based approach for solving hierarchical multicriteria production planning problems", Computers and Industrial Engineering 16, 407-417.
-
(1989)
Computers and Industrial Engineering
, vol.16
, pp. 407-417
-
-
Malakooti, B.1
-
16
-
-
0042263127
-
Computer scheduling and control systems part production
-
Moodie, C., and Novotny, D. (1968), "Computer scheduling and control systems part production", The Journal of Industrial Engineering 19, 326-341.
-
(1968)
The Journal of Industrial Engineering
, vol.19
, pp. 326-341
-
-
Moodie, C.1
Novotny, D.2
-
17
-
-
0041762380
-
-
Ph.D. Thesis, Industrial Engineering and Operations Research Department, University of Massachusetts, Amherst, MA
-
Norbis, M. (1987), "Heuristics for the Resource Constrained Scheduling Problem", Ph.D. Thesis, Industrial Engineering and Operations Research Department, University of Massachusetts, Amherst, MA.
-
(1987)
Heuristics for the Resource Constrained Scheduling Problem
-
-
Norbis, M.1
-
18
-
-
0022787783
-
Two level heuristic for the resource constrained scheduling problem
-
Norbis, M., and Smith, J.M. (1986), "Two level heuristic for the Resource Constrained Scheduling Problem", International Journal of Production Research 24, 1203-1220.
-
(1986)
International Journal of Production Research
, vol.24
, pp. 1203-1220
-
-
Norbis, M.1
Smith, J.M.2
-
19
-
-
0023825887
-
A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems
-
Norbis, M., and Smith, J.M. (1988), "A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems", European Journal of Operational Research 33, 30-41.
-
(1988)
European Journal of Operational Research
, vol.33
, pp. 30-41
-
-
Norbis, M.1
Smith, J.M.2
-
21
-
-
0017268482
-
Scheduling a project under multiple resource constraints: A zero-one programming approach
-
Patterson, J., and Roth, G. (1976), "Scheduling a project under multiple resource constraints: A zero-one programming approach", AIIE Transactions 8, 449-455.
-
(1976)
AIIE Transactions
, vol.8
, pp. 449-455
-
-
Patterson, J.1
Roth, G.2
-
22
-
-
0014574409
-
Multiproject scheduling with limited resources: A zero-one programming approach
-
Pritsker, A., Walters, L., and Wolfe, P. (1969), " Multiproject scheduling with limited resources: A zero-one programming approach", Management Science 16, 93-108.
-
(1969)
Management Science
, vol.16
, pp. 93-108
-
-
Pritsker, A.1
Walters, L.2
Wolfe, P.3
-
23
-
-
0020717649
-
A branch-and-bound procedure to solve a bicriterion scheduling problem
-
Sen, T., and Gupta, S. (1983), "A Branch-and-Bound procedure to solve a bicriterion scheduling problem", IIE Transactions 15, 84-88.
-
(1983)
IIE Transactions
, vol.15
, pp. 84-88
-
-
Sen, T.1
Gupta, S.2
-
24
-
-
0024682175
-
An artificial intelligence approach to the scheduling of flexible manufacturing systems
-
Shaw, M. (1989), "An Artificial Intelligence approach to the scheduling of Flexible Manufacturing Systems", IIE Transactions 21, 170-183.
-
(1989)
IIE Transactions
, vol.21
, pp. 170-183
-
-
Shaw, M.1
-
25
-
-
0023851151
-
Scheduling experiments on the space station
-
Sheskin, T. (1988), "Scheduling experiments on the space station", Computers and Industrial Engineering 14, 315-23.
-
(1988)
Computers and Industrial Engineering
, vol.14
, pp. 315-323
-
-
Sheskin, T.1
-
26
-
-
0025960935
-
Interactive multiple objective optimization: Survey I - Continuous case
-
Shin, W., and Ravindran, A. (1991), "Interactive multiple objective optimization: Survey I - Continuous case", Computers & Operations Research 18, 97-114.
-
(1991)
Computers & Operations Research
, vol.18
, pp. 97-114
-
-
Shin, W.1
Ravindran, A.2
-
27
-
-
0019586862
-
Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
-
Slowinski, R. (1981), "Multiobjective network scheduling with efficient use of renewable and nonrenewable resources", European Journal of Operational Research 7, 265-273.
-
(1981)
European Journal of Operational Research
, vol.7
, pp. 265-273
-
-
Slowinski, R.1
-
29
-
-
0018011301
-
Multiple resource-constrained scheduling using branch and bound
-
Stinson, J., Davis, E., and Khumawala, B. (1978), "Multiple resource-constrained scheduling using Branch and Bound", AIlE Transactions 10, 252-259.
-
(1978)
AIIE Transactions
, vol.10
, pp. 252-259
-
-
Stinson, J.1
Davis, E.2
Khumawala, B.3
-
30
-
-
0017997005
-
An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
-
Talbot, F., and Patterson, J. (1978), "An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems", Management Science 24, 1163-1174.
-
(1978)
Management Science
, vol.24
, pp. 1163-1174
-
-
Talbot, F.1
Patterson, J.2
-
31
-
-
0010322740
-
Complexity of sequencing problems
-
E. Coffman, Wiley, New York
-
Ullman, J. (1977), "Complexity of sequencing problems", in: E. Coffman, Computer and Job-Shop Scheduling Theory, Wiley, New York.
-
(1977)
Computer and Job-Shop Scheduling Theory
-
-
Ullman, J.1
-
32
-
-
0020822062
-
A decision support system for job shop scheduling
-
Viviers, F. (1983), "A decision support system for job shop scheduling", European Journal of Operational Research 14, 95-103.
-
(1983)
European Journal of Operational Research
, vol.14
, pp. 95-103
-
-
Viviers, F.1
-
33
-
-
0018924243
-
Solving a bicriterion scheduling problem
-
Wassenhove, L. van, and Gelders, L. (1980), "Solving a bicriterion scheduling problem", European Journal of Operational Research 4, 42-48.
-
(1980)
European Journal of Operational Research
, vol.4
, pp. 42-48
-
-
Van Wassenhove, L.1
Gelders, L.2
|