Volumn 94, Issue 1, 1996, Pages 54-65

An interactive decision support system for the resource constrained scheduling problem

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRAINT THEORY; DECISION SUPPORT SYSTEMS; HEURISTIC METHODS; OPTIMIZATION; PERFORMANCE; RESOURCE ALLOCATION; SCHEDULING;

EID: 0030270996     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/0377-2217(95)00187-5     Document Type: Article
Times cited : (6)

References (33)
  • 1
    • 0019691416 scopus 로고
    • A branch and bound network algorithm for interactive process scheduling
    • Baker, T. (1981), "A Branch and Bound network algorithm for interactive process scheduling", Mathematical Programming Study 15, 43-57.
    • (1981) Mathematical Programming Study , vol.15 , pp. 43-57
    • Baker, T.1
  • 2
    • 0026900932 scopus 로고
    • A multicriteria scheduling tool using a branch-and-bound algorithm
    • Bausch, R. (1992), "A multicriteria scheduling tool using a Branch-and-Bound algorithm", European Journal of Operational Research 61, 215-218.
    • (1992) European Journal of Operational Research , vol.61 , pp. 215-218
    • Bausch, R.1
  • 3
    • 0019491059 scopus 로고
    • Solving the resource constrained deadline scheduling problem via reduction to the network flow problem
    • Blazewicz, J. (1981), "Solving the resource constrained deadline scheduling problem via reduction to the network flow problem", European Journal of Operational Research 6, 75-79.
    • (1981) European Journal of Operational Research , vol.6 , pp. 75-79
    • Blazewicz, J.1
  • 4
    • 0000813734 scopus 로고
    • An algorithm for optimal project scheduling under multiple resource constraints
    • Davis, E., and Heidom, G. (1971), "An algorithm for optimal project scheduling under multiple resource constraints", Management Science 17, B803-B816.
    • (1971) Management Science , vol.17
    • Davis, E.1    Heidom, G.2
  • 6
    • 0011522042 scopus 로고
    • A computer aided decision system
    • Ferguson, R., and Jones, C. (1969), "A computer aided decision system", Management Science 15, B550-B561.
    • (1969) Management Science , vol.15
    • Ferguson, R.1    Jones, C.2
  • 7
    • 0002983810 scopus 로고
    • Optimal solution of scheduling problems using lagrange multipliers: Part I
    • Fisher, M. (1973), "Optimal solution of scheduling problems using Lagrange multipliers: Part I", Operations Research 21, 1114-1127.
    • (1973) Operations Research , vol.21 , pp. 1114-1127
    • Fisher, M.1
  • 8
    • 0021437506 scopus 로고
    • An application of multiple criteria decision making principles for planning machining operations
    • Ghiassi, M., De Vor, R., Dessouky, M., and Kijowski, B. (1984), "An application of multiple criteria decision making principles for planning machining operations", IIE Transactions 16, 106-114.
    • (1984) IIE Transactions , vol.16 , pp. 106-114
    • Ghiassi, M.1    De Vor, R.2    Dessouky, M.3    Kijowski, B.4
  • 9
    • 0018012519 scopus 로고
    • Interactive scheduling: Historical survey and state of the art
    • Godin, V. (1978), "Interactive scheduling: Historical survey and state of the art", AIIE Transactions 10, 331-337.
    • (1978) AIIE Transactions , vol.10 , pp. 331-337
    • Godin, V.1
  • 10
    • 0020782430 scopus 로고
    • Master production scheduling: A multiple-objective linear programming approach
    • Gonzalez, J., and Reeves, G. (1983) "Master production scheduling: A multiple-objective linear programming approach", International Journal of Production Research 21, 553-562.
    • (1983) International Journal of Production Research , vol.21 , pp. 553-562
    • Gonzalez, J.1    Reeves, G.2
  • 13
    • 0002884211 scopus 로고
    • On computational complexity of combinatorial problems
    • Karp, R. (1975), "On computational complexity of combinatorial problems", Networks 5, 45-68.
    • (1975) Networks , vol.5 , pp. 45-68
    • Karp, R.1
  • 15
    • 0024903966 scopus 로고
    • A gradient-based approach for solving hierarchical multicriteria production planning problems
    • Malakooti, B. (1989), "A gradient-based approach for solving hierarchical multicriteria production planning problems", Computers and Industrial Engineering 16, 407-417.
    • (1989) Computers and Industrial Engineering , vol.16 , pp. 407-417
    • Malakooti, B.1
  • 16
    • 0042263127 scopus 로고
    • Computer scheduling and control systems part production
    • Moodie, C., and Novotny, D. (1968), "Computer scheduling and control systems part production", The Journal of Industrial Engineering 19, 326-341.
    • (1968) The Journal of Industrial Engineering , vol.19 , pp. 326-341
    • Moodie, C.1    Novotny, D.2
  • 17
    • 0041762380 scopus 로고
    • Ph.D. Thesis, Industrial Engineering and Operations Research Department, University of Massachusetts, Amherst, MA
    • Norbis, M. (1987), "Heuristics for the Resource Constrained Scheduling Problem", Ph.D. Thesis, Industrial Engineering and Operations Research Department, University of Massachusetts, Amherst, MA.
    • (1987) Heuristics for the Resource Constrained Scheduling Problem
    • Norbis, M.1
  • 18
    • 0022787783 scopus 로고
    • Two level heuristic for the resource constrained scheduling problem
    • Norbis, M., and Smith, J.M. (1986), "Two level heuristic for the Resource Constrained Scheduling Problem", International Journal of Production Research 24, 1203-1220.
    • (1986) International Journal of Production Research , vol.24 , pp. 1203-1220
    • Norbis, M.1    Smith, J.M.2
  • 19
    • 0023825887 scopus 로고
    • A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems
    • Norbis, M., and Smith, J.M. (1988), "A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems", European Journal of Operational Research 33, 30-41.
    • (1988) European Journal of Operational Research , vol.33 , pp. 30-41
    • Norbis, M.1    Smith, J.M.2
  • 21
    • 0017268482 scopus 로고
    • Scheduling a project under multiple resource constraints: A zero-one programming approach
    • Patterson, J., and Roth, G. (1976), "Scheduling a project under multiple resource constraints: A zero-one programming approach", AIIE Transactions 8, 449-455.
    • (1976) AIIE Transactions , vol.8 , pp. 449-455
    • Patterson, J.1    Roth, G.2
  • 22
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker, A., Walters, L., and Wolfe, P. (1969), " Multiproject scheduling with limited resources: A zero-one programming approach", Management Science 16, 93-108.
    • (1969) Management Science , vol.16 , pp. 93-108
    • Pritsker, A.1    Walters, L.2    Wolfe, P.3
  • 23
    • 0020717649 scopus 로고
    • A branch-and-bound procedure to solve a bicriterion scheduling problem
    • Sen, T., and Gupta, S. (1983), "A Branch-and-Bound procedure to solve a bicriterion scheduling problem", IIE Transactions 15, 84-88.
    • (1983) IIE Transactions , vol.15 , pp. 84-88
    • Sen, T.1    Gupta, S.2
  • 24
    • 0024682175 scopus 로고
    • An artificial intelligence approach to the scheduling of flexible manufacturing systems
    • Shaw, M. (1989), "An Artificial Intelligence approach to the scheduling of Flexible Manufacturing Systems", IIE Transactions 21, 170-183.
    • (1989) IIE Transactions , vol.21 , pp. 170-183
    • Shaw, M.1
  • 25
    • 0023851151 scopus 로고
    • Scheduling experiments on the space station
    • Sheskin, T. (1988), "Scheduling experiments on the space station", Computers and Industrial Engineering 14, 315-23.
    • (1988) Computers and Industrial Engineering , vol.14 , pp. 315-323
    • Sheskin, T.1
  • 26
    • 0025960935 scopus 로고
    • Interactive multiple objective optimization: Survey I - Continuous case
    • Shin, W., and Ravindran, A. (1991), "Interactive multiple objective optimization: Survey I - Continuous case", Computers & Operations Research 18, 97-114.
    • (1991) Computers & Operations Research , vol.18 , pp. 97-114
    • Shin, W.1    Ravindran, A.2
  • 27
    • 0019586862 scopus 로고
    • Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
    • Slowinski, R. (1981), "Multiobjective network scheduling with efficient use of renewable and nonrenewable resources", European Journal of Operational Research 7, 265-273.
    • (1981) European Journal of Operational Research , vol.7 , pp. 265-273
    • Slowinski, R.1
  • 29
    • 0018011301 scopus 로고
    • Multiple resource-constrained scheduling using branch and bound
    • Stinson, J., Davis, E., and Khumawala, B. (1978), "Multiple resource-constrained scheduling using Branch and Bound", AIlE Transactions 10, 252-259.
    • (1978) AIIE Transactions , vol.10 , pp. 252-259
    • Stinson, J.1    Davis, E.2    Khumawala, B.3
  • 30
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
    • Talbot, F., and Patterson, J. (1978), "An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems", Management Science 24, 1163-1174.
    • (1978) Management Science , vol.24 , pp. 1163-1174
    • Talbot, F.1    Patterson, J.2
  • 31
    • 0010322740 scopus 로고
    • Complexity of sequencing problems
    • E. Coffman, Wiley, New York
    • Ullman, J. (1977), "Complexity of sequencing problems", in: E. Coffman, Computer and Job-Shop Scheduling Theory, Wiley, New York.
    • (1977) Computer and Job-Shop Scheduling Theory
    • Ullman, J.1
  • 32
    • 0020822062 scopus 로고
    • A decision support system for job shop scheduling
    • Viviers, F. (1983), "A decision support system for job shop scheduling", European Journal of Operational Research 14, 95-103.
    • (1983) European Journal of Operational Research , vol.14 , pp. 95-103
    • Viviers, F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.