메뉴 건너뛰기




Volumn 44, Issue 4, 1998, Pages 534-547

Personnel tour scheduling when starting-time restrictions are present

Author keywords

Heuristics; Linear Programming; Workforce Scheduling

Indexed keywords

HEURISTIC METHODS; INDUSTRIAL MANAGEMENT; LINEAR PROGRAMMING; PERSONNEL; PROBLEM SOLVING; SCHEDULING;

EID: 0032050742     PISSN: 00251909     EISSN: None     Source Type: Journal    
DOI: 10.1287/mnsc.44.4.534     Document Type: Article
Times cited : (59)

References (50)
  • 1
    • 0001971924 scopus 로고
    • L. L. Bean Chooses a Telephone Agent Scheduling System
    • Andrews, B. H. and H. L. Parsons, "L. L. Bean Chooses a Telephone Agent Scheduling System," Interfaces, 19, 6 (1989), 1-9.
    • (1989) Interfaces , vol.19 , Issue.6 , pp. 1-9
    • Andrews, B.H.1    Parsons, H.L.2
  • 2
    • 0021694201 scopus 로고
    • Integrated Days off and Shift Personnel Scheduling
    • Bailey, J. E., "Integrated Days Off and Shift Personnel Scheduling," Computers and Industrial Engineering, 9, 4 (1985), 395-404.
    • (1985) Computers and Industrial Engineering , vol.9 , Issue.4 , pp. 395-404
    • Bailey, J.E.1
  • 3
    • 0010767738 scopus 로고
    • Personnel Scheduling with Flexshift Models
    • _ and J. Field, "Personnel Scheduling with Flexshift Models," J. Oper. Management, 5, 3 (1985), 327-338.
    • (1985) J. Oper. Management , vol.5 , Issue.3 , pp. 327-338
    • Field, J.1
  • 4
    • 0016091890 scopus 로고
    • Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements
    • Baker, K. R., "Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements," Management Sci., 20, 12 (1974), 1561-1568.
    • (1974) Management Sci. , vol.20 , Issue.12 , pp. 1561-1568
    • Baker, K.R.1
  • 5
    • 84896876201 scopus 로고
    • Workforce Allocation in Cyclical Scheduling Problems: A Survey
    • _, "Workforce Allocation in Cyclical Scheduling Problems: A Survey," Oper. Res. Quarterly, 27, 1 (1976), 155-167.
    • (1976) Oper. Res. Quarterly , vol.27 , Issue.1 , pp. 155-167
  • 6
    • 0018674639 scopus 로고
    • Staff Scheduling with Day-Off and Workstretch Constraints
    • _, R. N. Burns, and M. Carter, "Staff Scheduling with Day-Off and Workstretch Constraints," AIIE Trans., 11, 4 (1979), 286-292.
    • (1979) AIIE Trans. , vol.11 , Issue.4 , pp. 286-292
    • Burns, R.N.1    Carter, M.2
  • 7
    • 0017547182 scopus 로고
    • Workforce Scheduling with Cyclic Demands and Day-Off Constraints
    • _ and M. J. Magazine, "Workforce Scheduling with Cyclic Demands and Day-Off Constraints," Management Sci., 24, 2 (1977), 161-167.
    • (1977) Management Sci. , vol.24 , Issue.2 , pp. 161-167
    • Magazine, M.J.1
  • 8
    • 0019562318 scopus 로고
    • A Guaranteed-Accuracy Round-Off Algorithm for Cyclic Scheduling and Set Covering
    • Bartholdi, J. J. III, "A Guaranteed-Accuracy Round-Off Algorithm for Cyclic Scheduling and Set Covering," Oper. Res., 29, 3 (1981), 501-510.
    • (1981) Oper. Res. , vol.29 , Issue.3 , pp. 501-510
    • Bartholdi III, J.J.1
  • 9
    • 0019059991 scopus 로고
    • Cyclic Scheduling Via Integer Programs with Circular Ones
    • _, J. B. Orlin, and H. D. Ratliff, "Cyclic Scheduling Via Integer Programs with Circular Ones," Oper. Res., 28, 5 (1980), 1074-1085.
    • (1980) Oper. Res. , vol.28 , Issue.5 , pp. 1074-1085
    • Orlin, J.B.1    Ratliff, H.D.2
  • 10
    • 0017951234 scopus 로고
    • Unnetworks with Applications to Idle Time Scheduling
    • Bartholdi, J. J. III and H. D. Ratliff, "Unnetworks with Applications to Idle Time Scheduling," Management Sci., 24, 8 (1978), 850-858.
    • (1978) Management Sci. , vol.24 , Issue.8 , pp. 850-858
    • Bartholdi III, J.J.1    Ratliff, H.D.2
  • 11
    • 84985853243 scopus 로고
    • Implicit Optimal and Heuristic Labor Staffing in a Multiobjective, Multilocation Environment
    • Bechtold, S. E., "Implicit Optimal and Heuristic Labor Staffing in a Multiobjective, Multilocation Environment," Decision Sci., 19, 2 (1988), 353-373.
    • (1988) Decision Sci. , vol.19 , Issue.2 , pp. 353-373
    • Bechtold, S.E.1
  • 12
    • 0028765130 scopus 로고
    • Working Set Generation Methods for Labor Tour Scheduling
    • _ and M. J. Brusco, "Working Set Generation Methods for Labor Tour Scheduling," European J. Oper. Res., 74, 3 (1994), 540-551.
    • (1994) European J. Oper. Res. , vol.74 , Issue.3 , pp. 540-551
    • Brusco, M.J.1
  • 13
    • 84985773391 scopus 로고
    • A Comparative Evaluation of Labor Tour Scheduling Methods
    • _, _, and M. J. Showalter, "A Comparative Evaluation of Labor Tour Scheduling Methods," Decision Sci., 22, 4 (1991), 683-699.
    • (1991) Decision Sci. , vol.22 , Issue.4 , pp. 683-699
    • Showalter, M.J.1
  • 14
    • 0000309722 scopus 로고
    • Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling
    • _ and L. W. Jacobs, "Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling," Management Sci., 36, 11 (1990), 1339-1351.
    • (1990) Management Sci. , vol.36 , Issue.11 , pp. 1339-1351
    • Jacobs, L.W.1
  • 15
    • 4243163526 scopus 로고    scopus 로고
    • The Equivalence of General Set-Covering and Implicit Integer Programming Formulations for Shift Scheduling
    • _ and _, "The Equivalence of General Set-Covering and Implicit Integer Programming Formulations for Shift Scheduling," Naval Res. Logistics, 43, 2, (1996), 233-249.
    • (1996) Naval Res. Logistics , vol.43 , Issue.2 , pp. 233-249
  • 16
    • 84947651214 scopus 로고
    • A Methodology for Labor Scheduling in a Service Operating System
    • _ and M. J. Showalter, "A Methodology for Labor Scheduling in a Service Operating System," Decision Sci., 18, 1 (1987), 89-107.
    • (1987) Decision Sci. , vol.18 , Issue.1 , pp. 89-107
    • Showalter, M.J.1
  • 17
    • 0041671523 scopus 로고
    • The Hastus Vehicle and Manpower Scheduling Systems at the Société de Transport de la Communauté Urbaine de Montréal
    • Blais, J., J. Lamont, and J. Rousseau, "The Hastus Vehicle and Manpower Scheduling Systems at the Société de Transport de la Communauté Urbaine de Montréal," Interfaces, 20, 1 (1990), 26-42.
    • (1990) Interfaces , vol.20 , Issue.1 , pp. 26-42
    • Blais, J.1    Lamont, J.2    Rousseau, J.3
  • 18
    • 0027543260 scopus 로고
    • A Simulated Annealing Approach to the Cyclic Staff-Scheduling Problem
    • Brusco, M. J. and L. W. Jacobs, "A Simulated Annealing Approach to the Cyclic Staff-Scheduling Problem," Naval Res. Logistics, 40, 1 (1993), 69-84.
    • (1993) Naval Res. Logistics , vol.40 , Issue.1 , pp. 69-84
    • Brusco, M.J.1    Jacobs, L.W.2
  • 19
    • 0029471493 scopus 로고
    • A Cost Analysis of Alternative Formulations for Personnel Scheduling in Continuously Operating Organizations
    • _ and _, "A Cost Analysis of Alternative Formulations for Personnel Scheduling in Continuously Operating Organizations," European J. Oper. Res., 86, 2 (1995), 249-261.
    • (1995) European J. Oper. Res. , vol.86 , Issue.2 , pp. 249-261
  • 20
    • 0000223585 scopus 로고
    • Improving Personnel Scheduling at Airline Stations
    • _, _, R. J. Bongiorno, D. V. Lyons, and B. Tang, "Improving Personnel Scheduling at Airline Stations," Oper. Res., 43, 5 (1995), 741-751.
    • (1995) Oper. Res. , vol.43 , Issue.5 , pp. 741-751
    • Bongiorno, R.J.1    Lyons, D.V.2    Tang, B.3
  • 21
    • 84989491929 scopus 로고
    • An Integrated Work Shift Scheduling System
    • Buffa, E. S., M. J. Cosgrove, and B. J. Luce, "An Integrated Work Shift Scheduling System," Decision Sci., 7, 4 (1976), 620-630.
    • (1976) Decision Sci. , vol.7 , Issue.4 , pp. 620-630
    • Buffa, E.S.1    Cosgrove, M.J.2    Luce, B.J.3
  • 22
    • 0022060907 scopus 로고
    • Work Force Size and Single Shift Schedules with Variable Demands
    • Burns, R. N. and M. W. Carter, "Work Force Size and Single Shift Schedules with Variable Demands," Management Sci., 31, 5 (1985), 599-607.
    • (1985) Management Sci. , vol.31 , Issue.5 , pp. 599-607
    • Burns, R.N.1    Carter, M.W.2
  • 23
    • 0023171522 scopus 로고
    • A Modular Approach to Optimal Multiple-Shift Manpower Scheduling
    • _ and G. J. Koop, "A Modular Approach to Optimal Multiple-Shift Manpower Scheduling," Oper. Res., 35, 1 (1987), 100-110.
    • (1987) Oper. Res. , vol.35 , Issue.1 , pp. 100-110
    • Koop, G.J.1
  • 24
    • 0015658401 scopus 로고
    • Scheduling of Toll Collectors
    • Byrne, J. L. and R. B. Potts, "Scheduling of Toll Collectors," Transportation Sci., 7 (1973), 224-245.
    • (1973) Transportation Sci. , vol.7 , pp. 224-245
    • Byrne, J.L.1    Potts, R.B.2
  • 25
    • 0000722156 scopus 로고
    • A Comment on Edie's 'Traffic Delays at Toll Booths'
    • Dantzig, G. B., "A Comment on Edie's 'Traffic Delays at Toll Booths'," Oper. Res., 2, 3 (1954), 339-341.
    • (1954) Oper. Res. , vol.2 , Issue.3 , pp. 339-341
    • Dantzig, G.B.1
  • 26
    • 0001296956 scopus 로고
    • Sufficient Working Subsets for the Tour Scheduling Problem
    • Easton, F. F. and D. F. Rossin, "Sufficient Working Subsets for the Tour Scheduling Problem," Management Sci., 37, 11 (1991), 1441-1451.
    • (1991) Management Sci. , vol.37 , Issue.11 , pp. 1441-1451
    • Easton, F.F.1    Rossin, D.F.2
  • 27
    • 0000722157 scopus 로고
    • Traffic Delays at Toll Booths
    • Edie, L. C., "Traffic Delays at Toll Booths," Oper. Res., 2, 1 (1954), 107-138.
    • (1954) Oper. Res. , vol.2 , Issue.1 , pp. 107-138
    • Edie, L.C.1
  • 28
    • 0022026652 scopus 로고
    • Workforce Scheduling with Cyclic Requirements and Constraints on Days Off, Weekends Off, and Workstretch
    • Emmons, H., "Workforce Scheduling with Cyclic Requirements and Constraints on Days Off, Weekends Off, and Workstretch," IIE Trans., 17 (1985), 8-16.
    • (1985) IIE Trans. , vol.17 , pp. 8-16
    • Emmons, H.1
  • 29
    • 0026163585 scopus 로고
    • Off-Day Scheduling with Hierarchical Worker Categories
    • _ and R. N. Burns, "Off-Day Scheduling with Hierarchical Worker Categories," Oper. Res., 39, 3 (1991), 484-495.
    • (1991) Oper. Res. , vol.39 , Issue.3 , pp. 484-495
    • Burns, R.N.1
  • 30
    • 0002267839 scopus 로고
    • Telephone Sales Manpower Planning at Qantas
    • Gaballa, A. and W. Pearce, "Telephone Sales Manpower Planning at Qantas," Interfaces, 9, 3 (1979), 1-9.
    • (1979) Interfaces , vol.9 , Issue.3 , pp. 1-9
    • Gaballa, A.1    Pearce, W.2
  • 31
    • 21144467280 scopus 로고
    • A Decision Support System for Scheduling Personnel in a Newspaper Publishing Environment
    • Gopalakrishnan, M., S. Gopalakrishnan, and D. M. Miller, "A Decision Support System for Scheduling Personnel in a Newspaper Publishing Environment," Interfaces, 23, 4 (1993), 104-115.
    • (1993) Interfaces , vol.23 , Issue.4 , pp. 104-115
    • Gopalakrishnan, M.1    Gopalakrishnan, S.2    Miller, D.M.3
  • 32
    • 0022519776 scopus 로고
    • United Airlines Station Manpower Planning System
    • Holloran, T. J. and J. E. Byrn, "United Airlines Station Manpower Planning System," Interfaces, 16, 1 (1986), 39-50.
    • (1986) Interfaces , vol.16 , Issue.1 , pp. 39-50
    • Holloran, T.J.1    Byrn, J.E.2
  • 33
    • 0000183015 scopus 로고
    • Multiple-Shift Workforce Scheduling under the 3-4 Work-week with Different Weekday and Weekend Requirements
    • Hung, R., "Multiple-Shift Workforce Scheduling Under the 3-4 Work-week with Different Weekday and Weekend Requirements," Management Sci., 40, 2 (1994), 280-284.
    • (1994) Management Sci. , vol.40 , Issue.2 , pp. 280-284
    • Hung, R.1
  • 34
    • 84990587419 scopus 로고
    • Labor Utilization Effects of Labor Scheduling Flexibility Alternatives in a Tour Scheduling Environment
    • Jacobs, L. W. and S. E. Bechtold, "Labor Utilization Effects of Labor Scheduling Flexibility Alternatives in a Tour Scheduling Environment," Decision Sci., 24, 1 (1993), 148-166.
    • (1993) Decision Sci. , vol.24 , Issue.1 , pp. 148-166
    • Jacobs, L.W.1    Bechtold, S.E.2
  • 35
    • 0005268792 scopus 로고    scopus 로고
    • Overlapping Start-Time Bands in Implicit Tour Scheduling
    • _ and M. J. Brusco, "Overlapping Start-Time Bands in Implicit Tour Scheduling," Management Sci., 42, 9, (1996), 1247-1259.
    • (1996) Management Sci. , vol.42 , Issue.9 , pp. 1247-1259
    • Brusco, M.J.1
  • 36
    • 0028496547 scopus 로고
    • Solving Large Scale Tour Scheduling Problems
    • Jarrah, A., J. F. Bard, and A. deSilva, "Solving Large Scale Tour Scheduling Problems," Management Sci., 40, 9 (1994), 1124-1144.
    • (1994) Management Sci. , vol.40 , Issue.9 , pp. 1124-1144
    • Jarrah, A.1    Bard, J.F.2    DeSilva, A.3
  • 37
    • 0018444711 scopus 로고
    • Operator Scheduling
    • Keith, E. G., "Operator Scheduling," AIIE Trans., 11, 1 (1979), 37-41.
    • (1979) AIIE Trans. , vol.11 , Issue.1 , pp. 37-41
    • Keith, E.G.1
  • 38
    • 0010167431 scopus 로고
    • An Interactive, Optimization-Based Decision Support System for Scheduling Part-Time Computer Lab Attendants
    • Lauer, J., L. W. Jacobs, M. J. Brusco, and S. E. Bechtold, "An Interactive, Optimization-Based Decision Support System for Scheduling Part-Time Computer Lab Attendants," Omega, 22, 6 (1994), 613-626.
    • (1994) Omega , vol.22 , Issue.6 , pp. 613-626
    • Lauer, J.1    Jacobs, L.W.2    Brusco, M.J.3    Bechtold, S.E.4
  • 39
    • 0040820263 scopus 로고
    • Management Science Improves Fast-Food Operations
    • Love, R. and J. Hoey, "Management Science Improves Fast-Food Operations," Interfaces, 20, 2 (1990), 21-29.
    • (1990) Interfaces , vol.20 , Issue.2 , pp. 21-29
    • Love, R.1    Hoey, J.2
  • 41
    • 0020797571 scopus 로고
    • Simple Approaches to Shift, Days-Off, and Tour Scheduling Problems
    • Morris, J. G. and M. J. Showalter, "Simple Approaches to Shift, Days-Off, and Tour Scheduling Problems," Management Sci., 29, 8 (1983), 942-950.
    • (1983) Management Sci. , vol.29 , Issue.8 , pp. 942-950
    • Morris, J.G.1    Showalter, M.J.2
  • 42
    • 21144471416 scopus 로고
    • Station Staffing at Pan American World Airways
    • Schindler, S. and T. Semmel, "Station Staffing at Pan American World Airways," Interfaces, 23, 3 (1993), 91-106.
    • (1993) Interfaces , vol.23 , Issue.3 , pp. 91-106
    • Schindler, S.1    Semmel, T.2
  • 44
    • 0002116639 scopus 로고
    • A Break from Tradition for the San Francisco Police: Patrol Officer Scheduling Using an Optimization-Based Decision Support System
    • Taylor, P. E. and S. J. Huxley, "A Break from Tradition for the San Francisco Police: Patrol Officer Scheduling Using an Optimization-Based Decision Support System," Interfaces, 19, 1 (1989), 4-24.
    • (1989) Interfaces , vol.19 , Issue.1 , pp. 4-24
    • Taylor, P.E.1    Huxley, S.J.2
  • 45
    • 0003332325 scopus 로고
    • Improved Implicit Optimal Modeling of the Shift Scheduling Problem
    • Thompson, G. M., "Improved Implicit Optimal Modeling of the Shift Scheduling Problem," Management Sci., 41, 5 (1995), 595-607.
    • (1995) Management Sci. , vol.41 , Issue.5 , pp. 595-607
    • Thompson, G.M.1
  • 46
    • 0009391755 scopus 로고    scopus 로고
    • A Simulated Annealing Heuristic for Shift Scheduling Using Non-Continuously Available Employees
    • _, "A Simulated Annealing Heuristic for Shift Scheduling Using Non-Continuously Available Employees," Computers and Oper. Res., 23, 2 (1996a), 275-288.
    • (1996) Computers and Oper. Res. , vol.23 , Issue.2 , pp. 275-288
  • 48
    • 21344486344 scopus 로고
    • Scheduling Harbor Pilots
    • Wermus, M. and J. A. Pope, "Scheduling Harbor Pilots," Interfaces, 24, 2 (1994), 44-52.
    • (1994) Interfaces , vol.24 , Issue.2 , pp. 44-52
    • Wermus, M.1    Pope, J.A.2
  • 49
    • 0026219571 scopus 로고
    • Staffing Rosters with Breaks - A Case Study
    • Willis, R. J. and S. B. Huxford, "Staffing Rosters with Breaks - A Case Study," J. Oper. Res. Society, 42, 9 (1991), 727-731.
    • (1991) J. Oper. Res. Society , vol.42 , Issue.9 , pp. 727-731
    • Willis, R.J.1    Huxford, S.B.2
  • 50
    • 0020832799 scopus 로고
    • Scheduling of Telephone Betting Operators - A Case Study
    • Wilson, E. J. G. and R. J. Willis, "Scheduling of Telephone Betting Operators - A Case Study," J. Oper. Res. Society, 34, 10 (1983), 991-998.
    • (1983) J. Oper. Res. Society , vol.34 , Issue.10 , pp. 991-998
    • Wilson, E.J.G.1    Willis, R.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.