-
1
-
-
0001971924
-
L. L. Bean Chooses a Telephone Agent Scheduling System
-
Andrews, B. H. and H. L. Parsons, "L. L. Bean Chooses a Telephone Agent Scheduling System," Interfaces, 19, 6 (1989), 1-9.
-
(1989)
Interfaces
, vol.19
, Issue.6
, pp. 1-9
-
-
Andrews, B.H.1
Parsons, H.L.2
-
2
-
-
0021694201
-
Integrated Days off and Shift Personnel Scheduling
-
Bailey, J. E., "Integrated Days Off and Shift Personnel Scheduling," Computers and Industrial Engineering, 9, 4 (1985), 395-404.
-
(1985)
Computers and Industrial Engineering
, vol.9
, Issue.4
, pp. 395-404
-
-
Bailey, J.E.1
-
3
-
-
0010767738
-
Personnel Scheduling with Flexshift Models
-
_ and J. Field, "Personnel Scheduling with Flexshift Models," J. Oper. Management, 5, 3 (1985), 327-338.
-
(1985)
J. Oper. Management
, vol.5
, Issue.3
, pp. 327-338
-
-
Field, J.1
-
4
-
-
0016091890
-
Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements
-
Baker, K. R., "Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements," Management Sci., 20, 12 (1974), 1561-1568.
-
(1974)
Management Sci.
, vol.20
, Issue.12
, pp. 1561-1568
-
-
Baker, K.R.1
-
5
-
-
84896876201
-
Workforce Allocation in Cyclical Scheduling Problems: A Survey
-
_, "Workforce Allocation in Cyclical Scheduling Problems: A Survey," Oper. Res. Quarterly, 27, 1 (1976), 155-167.
-
(1976)
Oper. Res. Quarterly
, vol.27
, Issue.1
, pp. 155-167
-
-
-
6
-
-
0018674639
-
Staff Scheduling with Day-Off and Workstretch Constraints
-
_, R. N. Burns, and M. Carter, "Staff Scheduling with Day-Off and Workstretch Constraints," AIIE Trans., 11, 4 (1979), 286-292.
-
(1979)
AIIE Trans.
, vol.11
, Issue.4
, pp. 286-292
-
-
Burns, R.N.1
Carter, M.2
-
7
-
-
0017547182
-
Workforce Scheduling with Cyclic Demands and Day-Off Constraints
-
_ and M. J. Magazine, "Workforce Scheduling with Cyclic Demands and Day-Off Constraints," Management Sci., 24, 2 (1977), 161-167.
-
(1977)
Management Sci.
, vol.24
, Issue.2
, pp. 161-167
-
-
Magazine, M.J.1
-
8
-
-
0019562318
-
A Guaranteed-Accuracy Round-Off Algorithm for Cyclic Scheduling and Set Covering
-
Bartholdi, J. J. III, "A Guaranteed-Accuracy Round-Off Algorithm for Cyclic Scheduling and Set Covering," Oper. Res., 29, 3 (1981), 501-510.
-
(1981)
Oper. Res.
, vol.29
, Issue.3
, pp. 501-510
-
-
Bartholdi III, J.J.1
-
9
-
-
0019059991
-
Cyclic Scheduling Via Integer Programs with Circular Ones
-
_, J. B. Orlin, and H. D. Ratliff, "Cyclic Scheduling Via Integer Programs with Circular Ones," Oper. Res., 28, 5 (1980), 1074-1085.
-
(1980)
Oper. Res.
, vol.28
, Issue.5
, pp. 1074-1085
-
-
Orlin, J.B.1
Ratliff, H.D.2
-
10
-
-
0017951234
-
Unnetworks with Applications to Idle Time Scheduling
-
Bartholdi, J. J. III and H. D. Ratliff, "Unnetworks with Applications to Idle Time Scheduling," Management Sci., 24, 8 (1978), 850-858.
-
(1978)
Management Sci.
, vol.24
, Issue.8
, pp. 850-858
-
-
Bartholdi III, J.J.1
Ratliff, H.D.2
-
11
-
-
84985853243
-
Implicit Optimal and Heuristic Labor Staffing in a Multiobjective, Multilocation Environment
-
Bechtold, S. E., "Implicit Optimal and Heuristic Labor Staffing in a Multiobjective, Multilocation Environment," Decision Sci., 19, 2 (1988), 353-373.
-
(1988)
Decision Sci.
, vol.19
, Issue.2
, pp. 353-373
-
-
Bechtold, S.E.1
-
12
-
-
0028765130
-
Working Set Generation Methods for Labor Tour Scheduling
-
_ and M. J. Brusco, "Working Set Generation Methods for Labor Tour Scheduling," European J. Oper. Res., 74, 3 (1994), 540-551.
-
(1994)
European J. Oper. Res.
, vol.74
, Issue.3
, pp. 540-551
-
-
Brusco, M.J.1
-
13
-
-
84985773391
-
A Comparative Evaluation of Labor Tour Scheduling Methods
-
_, _, and M. J. Showalter, "A Comparative Evaluation of Labor Tour Scheduling Methods," Decision Sci., 22, 4 (1991), 683-699.
-
(1991)
Decision Sci.
, vol.22
, Issue.4
, pp. 683-699
-
-
Showalter, M.J.1
-
14
-
-
0000309722
-
Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling
-
_ and L. W. Jacobs, "Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling," Management Sci., 36, 11 (1990), 1339-1351.
-
(1990)
Management Sci.
, vol.36
, Issue.11
, pp. 1339-1351
-
-
Jacobs, L.W.1
-
15
-
-
4243163526
-
The Equivalence of General Set-Covering and Implicit Integer Programming Formulations for Shift Scheduling
-
_ and _, "The Equivalence of General Set-Covering and Implicit Integer Programming Formulations for Shift Scheduling," Naval Res. Logistics, 43, 2, (1996), 233-249.
-
(1996)
Naval Res. Logistics
, vol.43
, Issue.2
, pp. 233-249
-
-
-
16
-
-
84947651214
-
A Methodology for Labor Scheduling in a Service Operating System
-
_ and M. J. Showalter, "A Methodology for Labor Scheduling in a Service Operating System," Decision Sci., 18, 1 (1987), 89-107.
-
(1987)
Decision Sci.
, vol.18
, Issue.1
, pp. 89-107
-
-
Showalter, M.J.1
-
17
-
-
0041671523
-
The Hastus Vehicle and Manpower Scheduling Systems at the Société de Transport de la Communauté Urbaine de Montréal
-
Blais, J., J. Lamont, and J. Rousseau, "The Hastus Vehicle and Manpower Scheduling Systems at the Société de Transport de la Communauté Urbaine de Montréal," Interfaces, 20, 1 (1990), 26-42.
-
(1990)
Interfaces
, vol.20
, Issue.1
, pp. 26-42
-
-
Blais, J.1
Lamont, J.2
Rousseau, J.3
-
18
-
-
0027543260
-
A Simulated Annealing Approach to the Cyclic Staff-Scheduling Problem
-
Brusco, M. J. and L. W. Jacobs, "A Simulated Annealing Approach to the Cyclic Staff-Scheduling Problem," Naval Res. Logistics, 40, 1 (1993), 69-84.
-
(1993)
Naval Res. Logistics
, vol.40
, Issue.1
, pp. 69-84
-
-
Brusco, M.J.1
Jacobs, L.W.2
-
19
-
-
0029471493
-
A Cost Analysis of Alternative Formulations for Personnel Scheduling in Continuously Operating Organizations
-
_ and _, "A Cost Analysis of Alternative Formulations for Personnel Scheduling in Continuously Operating Organizations," European J. Oper. Res., 86, 2 (1995), 249-261.
-
(1995)
European J. Oper. Res.
, vol.86
, Issue.2
, pp. 249-261
-
-
-
20
-
-
0000223585
-
Improving Personnel Scheduling at Airline Stations
-
_, _, R. J. Bongiorno, D. V. Lyons, and B. Tang, "Improving Personnel Scheduling at Airline Stations," Oper. Res., 43, 5 (1995), 741-751.
-
(1995)
Oper. Res.
, vol.43
, Issue.5
, pp. 741-751
-
-
Bongiorno, R.J.1
Lyons, D.V.2
Tang, B.3
-
21
-
-
84989491929
-
An Integrated Work Shift Scheduling System
-
Buffa, E. S., M. J. Cosgrove, and B. J. Luce, "An Integrated Work Shift Scheduling System," Decision Sci., 7, 4 (1976), 620-630.
-
(1976)
Decision Sci.
, vol.7
, Issue.4
, pp. 620-630
-
-
Buffa, E.S.1
Cosgrove, M.J.2
Luce, B.J.3
-
22
-
-
0022060907
-
Work Force Size and Single Shift Schedules with Variable Demands
-
Burns, R. N. and M. W. Carter, "Work Force Size and Single Shift Schedules with Variable Demands," Management Sci., 31, 5 (1985), 599-607.
-
(1985)
Management Sci.
, vol.31
, Issue.5
, pp. 599-607
-
-
Burns, R.N.1
Carter, M.W.2
-
23
-
-
0023171522
-
A Modular Approach to Optimal Multiple-Shift Manpower Scheduling
-
_ and G. J. Koop, "A Modular Approach to Optimal Multiple-Shift Manpower Scheduling," Oper. Res., 35, 1 (1987), 100-110.
-
(1987)
Oper. Res.
, vol.35
, Issue.1
, pp. 100-110
-
-
Koop, G.J.1
-
24
-
-
0015658401
-
Scheduling of Toll Collectors
-
Byrne, J. L. and R. B. Potts, "Scheduling of Toll Collectors," Transportation Sci., 7 (1973), 224-245.
-
(1973)
Transportation Sci.
, vol.7
, pp. 224-245
-
-
Byrne, J.L.1
Potts, R.B.2
-
25
-
-
0000722156
-
A Comment on Edie's 'Traffic Delays at Toll Booths'
-
Dantzig, G. B., "A Comment on Edie's 'Traffic Delays at Toll Booths'," Oper. Res., 2, 3 (1954), 339-341.
-
(1954)
Oper. Res.
, vol.2
, Issue.3
, pp. 339-341
-
-
Dantzig, G.B.1
-
26
-
-
0001296956
-
Sufficient Working Subsets for the Tour Scheduling Problem
-
Easton, F. F. and D. F. Rossin, "Sufficient Working Subsets for the Tour Scheduling Problem," Management Sci., 37, 11 (1991), 1441-1451.
-
(1991)
Management Sci.
, vol.37
, Issue.11
, pp. 1441-1451
-
-
Easton, F.F.1
Rossin, D.F.2
-
27
-
-
0000722157
-
Traffic Delays at Toll Booths
-
Edie, L. C., "Traffic Delays at Toll Booths," Oper. Res., 2, 1 (1954), 107-138.
-
(1954)
Oper. Res.
, vol.2
, Issue.1
, pp. 107-138
-
-
Edie, L.C.1
-
28
-
-
0022026652
-
Workforce Scheduling with Cyclic Requirements and Constraints on Days Off, Weekends Off, and Workstretch
-
Emmons, H., "Workforce Scheduling with Cyclic Requirements and Constraints on Days Off, Weekends Off, and Workstretch," IIE Trans., 17 (1985), 8-16.
-
(1985)
IIE Trans.
, vol.17
, pp. 8-16
-
-
Emmons, H.1
-
29
-
-
0026163585
-
Off-Day Scheduling with Hierarchical Worker Categories
-
_ and R. N. Burns, "Off-Day Scheduling with Hierarchical Worker Categories," Oper. Res., 39, 3 (1991), 484-495.
-
(1991)
Oper. Res.
, vol.39
, Issue.3
, pp. 484-495
-
-
Burns, R.N.1
-
30
-
-
0002267839
-
Telephone Sales Manpower Planning at Qantas
-
Gaballa, A. and W. Pearce, "Telephone Sales Manpower Planning at Qantas," Interfaces, 9, 3 (1979), 1-9.
-
(1979)
Interfaces
, vol.9
, Issue.3
, pp. 1-9
-
-
Gaballa, A.1
Pearce, W.2
-
31
-
-
21144467280
-
A Decision Support System for Scheduling Personnel in a Newspaper Publishing Environment
-
Gopalakrishnan, M., S. Gopalakrishnan, and D. M. Miller, "A Decision Support System for Scheduling Personnel in a Newspaper Publishing Environment," Interfaces, 23, 4 (1993), 104-115.
-
(1993)
Interfaces
, vol.23
, Issue.4
, pp. 104-115
-
-
Gopalakrishnan, M.1
Gopalakrishnan, S.2
Miller, D.M.3
-
32
-
-
0022519776
-
United Airlines Station Manpower Planning System
-
Holloran, T. J. and J. E. Byrn, "United Airlines Station Manpower Planning System," Interfaces, 16, 1 (1986), 39-50.
-
(1986)
Interfaces
, vol.16
, Issue.1
, pp. 39-50
-
-
Holloran, T.J.1
Byrn, J.E.2
-
33
-
-
0000183015
-
Multiple-Shift Workforce Scheduling under the 3-4 Work-week with Different Weekday and Weekend Requirements
-
Hung, R., "Multiple-Shift Workforce Scheduling Under the 3-4 Work-week with Different Weekday and Weekend Requirements," Management Sci., 40, 2 (1994), 280-284.
-
(1994)
Management Sci.
, vol.40
, Issue.2
, pp. 280-284
-
-
Hung, R.1
-
34
-
-
84990587419
-
Labor Utilization Effects of Labor Scheduling Flexibility Alternatives in a Tour Scheduling Environment
-
Jacobs, L. W. and S. E. Bechtold, "Labor Utilization Effects of Labor Scheduling Flexibility Alternatives in a Tour Scheduling Environment," Decision Sci., 24, 1 (1993), 148-166.
-
(1993)
Decision Sci.
, vol.24
, Issue.1
, pp. 148-166
-
-
Jacobs, L.W.1
Bechtold, S.E.2
-
35
-
-
0005268792
-
Overlapping Start-Time Bands in Implicit Tour Scheduling
-
_ and M. J. Brusco, "Overlapping Start-Time Bands in Implicit Tour Scheduling," Management Sci., 42, 9, (1996), 1247-1259.
-
(1996)
Management Sci.
, vol.42
, Issue.9
, pp. 1247-1259
-
-
Brusco, M.J.1
-
36
-
-
0028496547
-
Solving Large Scale Tour Scheduling Problems
-
Jarrah, A., J. F. Bard, and A. deSilva, "Solving Large Scale Tour Scheduling Problems," Management Sci., 40, 9 (1994), 1124-1144.
-
(1994)
Management Sci.
, vol.40
, Issue.9
, pp. 1124-1144
-
-
Jarrah, A.1
Bard, J.F.2
DeSilva, A.3
-
37
-
-
0018444711
-
Operator Scheduling
-
Keith, E. G., "Operator Scheduling," AIIE Trans., 11, 1 (1979), 37-41.
-
(1979)
AIIE Trans.
, vol.11
, Issue.1
, pp. 37-41
-
-
Keith, E.G.1
-
38
-
-
0010167431
-
An Interactive, Optimization-Based Decision Support System for Scheduling Part-Time Computer Lab Attendants
-
Lauer, J., L. W. Jacobs, M. J. Brusco, and S. E. Bechtold, "An Interactive, Optimization-Based Decision Support System for Scheduling Part-Time Computer Lab Attendants," Omega, 22, 6 (1994), 613-626.
-
(1994)
Omega
, vol.22
, Issue.6
, pp. 613-626
-
-
Lauer, J.1
Jacobs, L.W.2
Brusco, M.J.3
Bechtold, S.E.4
-
39
-
-
0040820263
-
Management Science Improves Fast-Food Operations
-
Love, R. and J. Hoey, "Management Science Improves Fast-Food Operations," Interfaces, 20, 2 (1990), 21-29.
-
(1990)
Interfaces
, vol.20
, Issue.2
, pp. 21-29
-
-
Love, R.1
Hoey, J.2
-
40
-
-
0017909287
-
One- and Two-Phase Heuristics for Workforce Scheduling
-
McGinnis, L. F., W. D. Culver, and R. H. Deane, "One- and Two-Phase Heuristics for Workforce Scheduling," Computers and Industrial Engineering, 2, 1 (1978), 7-15.
-
(1978)
Computers and Industrial Engineering
, vol.2
, Issue.1
, pp. 7-15
-
-
McGinnis, L.F.1
Culver, W.D.2
Deane, R.H.3
-
41
-
-
0020797571
-
Simple Approaches to Shift, Days-Off, and Tour Scheduling Problems
-
Morris, J. G. and M. J. Showalter, "Simple Approaches to Shift, Days-Off, and Tour Scheduling Problems," Management Sci., 29, 8 (1983), 942-950.
-
(1983)
Management Sci.
, vol.29
, Issue.8
, pp. 942-950
-
-
Morris, J.G.1
Showalter, M.J.2
-
42
-
-
21144471416
-
Station Staffing at Pan American World Airways
-
Schindler, S. and T. Semmel, "Station Staffing at Pan American World Airways," Interfaces, 23, 3 (1993), 91-106.
-
(1993)
Interfaces
, vol.23
, Issue.3
, pp. 91-106
-
-
Schindler, S.1
Semmel, T.2
-
44
-
-
0002116639
-
A Break from Tradition for the San Francisco Police: Patrol Officer Scheduling Using an Optimization-Based Decision Support System
-
Taylor, P. E. and S. J. Huxley, "A Break from Tradition for the San Francisco Police: Patrol Officer Scheduling Using an Optimization-Based Decision Support System," Interfaces, 19, 1 (1989), 4-24.
-
(1989)
Interfaces
, vol.19
, Issue.1
, pp. 4-24
-
-
Taylor, P.E.1
Huxley, S.J.2
-
45
-
-
0003332325
-
Improved Implicit Optimal Modeling of the Shift Scheduling Problem
-
Thompson, G. M., "Improved Implicit Optimal Modeling of the Shift Scheduling Problem," Management Sci., 41, 5 (1995), 595-607.
-
(1995)
Management Sci.
, vol.41
, Issue.5
, pp. 595-607
-
-
Thompson, G.M.1
-
46
-
-
0009391755
-
A Simulated Annealing Heuristic for Shift Scheduling Using Non-Continuously Available Employees
-
_, "A Simulated Annealing Heuristic for Shift Scheduling Using Non-Continuously Available Employees," Computers and Oper. Res., 23, 2 (1996a), 275-288.
-
(1996)
Computers and Oper. Res.
, vol.23
, Issue.2
, pp. 275-288
-
-
-
48
-
-
21344486344
-
Scheduling Harbor Pilots
-
Wermus, M. and J. A. Pope, "Scheduling Harbor Pilots," Interfaces, 24, 2 (1994), 44-52.
-
(1994)
Interfaces
, vol.24
, Issue.2
, pp. 44-52
-
-
Wermus, M.1
Pope, J.A.2
-
49
-
-
0026219571
-
Staffing Rosters with Breaks - A Case Study
-
Willis, R. J. and S. B. Huxford, "Staffing Rosters with Breaks - A Case Study," J. Oper. Res. Society, 42, 9 (1991), 727-731.
-
(1991)
J. Oper. Res. Society
, vol.42
, Issue.9
, pp. 727-731
-
-
Willis, R.J.1
Huxford, S.B.2
-
50
-
-
0020832799
-
Scheduling of Telephone Betting Operators - A Case Study
-
Wilson, E. J. G. and R. J. Willis, "Scheduling of Telephone Betting Operators - A Case Study," J. Oper. Res. Society, 34, 10 (1983), 991-998.
-
(1983)
J. Oper. Res. Society
, vol.34
, Issue.10
, pp. 991-998
-
-
Wilson, E.J.G.1
Willis, R.J.2
|