-
1
-
-
0004545053
-
A heuristic programming approach to the employee scheduling problem and some thoughts on 'Managerial robots'
-
F. Glover, C. McMillan and R. Glover, A heuristic programming approach to the employee scheduling problem and some thoughts on 'Managerial robots'. J. Opers. Mgmt 4, 113-128 (1984).
-
(1984)
J. Opers. Mgmt
, vol.4
, pp. 113-128
-
-
Glover, F.1
McMillan, C.2
Glover, R.3
-
2
-
-
84985759957
-
Tour scheduling and task assignment of a heterogeneous work force: A heuristic approach
-
J. S. Loucks and F. R. Jacobs, Tour scheduling and task assignment of a heterogeneous work force: a heuristic approach. Decis. Sci. 22, 719-738 (1991).
-
(1991)
Decis. Sci.
, vol.22
, pp. 719-738
-
-
Loucks, J.S.1
Jacobs, F.R.2
-
3
-
-
0040820263
-
Management science improves fast food operations
-
R. R. Love, Jr and J. M. Hoey, Management science improves fast food operations. Interfaces 20, 21-29 (1990).
-
(1990)
Interfaces
, vol.20
, pp. 21-29
-
-
Love R.R., Jr.1
Hoey, J.M.2
-
4
-
-
38249019798
-
Shift scheduling when employees have limited availability: An L. P. Approach
-
G. M. Thompson, Shift scheduling when employees have limited availability: an L. P. approach. J. Opers. Mgmt 9, 352-370 (1990).
-
(1990)
J. Opers. Mgmt
, vol.9
, pp. 352-370
-
-
Thompson, G.M.1
-
5
-
-
0000722156
-
A comment on Edie's Traffic delays at toll booths'
-
G. B. Dantzig, A comment on Edie's Traffic delays at toll booths'. Opers Res 2, 339-341 (1954).
-
(1954)
Opers Res
, vol.2
, pp. 339-341
-
-
Dantzig, G.B.1
-
6
-
-
84989491929
-
An integrated work shift scheduling system
-
E. S. Buffa, M. J. Cosgrove and B. J. Luce, An integrated work shift scheduling system. Decis. Sci. 7, 620-630 (1976).
-
(1976)
Decis. Sci.
, vol.7
, pp. 620-630
-
-
Buffa, E.S.1
Cosgrove, M.J.2
Luce, B.J.3
-
8
-
-
0016985083
-
Heuristic methods for telephone operator shift scheduling: An experimental analysis
-
W. B. Henderson and W. L. Berry, Heuristic methods for telephone operator shift scheduling: an experimental analysis. Mgmt Sci 22, 1372-1380 (1976).
-
(1976)
Mgmt Sci
, vol.22
, pp. 1372-1380
-
-
Henderson, W.B.1
Berry, W.L.2
-
9
-
-
84947651214
-
A methodology for labor scheduling in a service operating system
-
S. E. Bechtold and M. J. Showalter, A methodology for labor scheduling in a service operating system. Decis. Sci. 18, 89-107 (1987).
-
(1987)
Decis. Sci.
, vol.18
, pp. 89-107
-
-
Bechtold, S.E.1
Showalter, M.J.2
-
10
-
-
0018444711
-
Operator scheduling
-
E. G. Keith, Operator scheduling. AllE Trans. 11, 37-41 (1979).
-
(1979)
AllE Trans.
, vol.11
, pp. 37-41
-
-
Keith, E.G.1
-
11
-
-
0002829684
-
Shift scheduling in banking operations: A case application
-
L. J. Krajewski, L. P. Ritzman and P. McKensie, Shift scheduling in banking operations: a case application. Interfaces 10, 1-8 (1980).
-
(1980)
Interfaces
, vol.10
, pp. 1-8
-
-
Krajewski, L.J.1
Ritzman, L.P.2
McKensie, P.3
-
12
-
-
0020132677
-
A simulation analysis of tour-shift construction procedures
-
V. A. Mabert and C. A. Watts, A simulation analysis of tour-shift construction procedures. Mgmt Sci. 28, 520-532 (1982).
-
(1982)
Mgmt Sci.
, vol.28
, pp. 520-532
-
-
Mabert, V.A.1
Watts, C.A.2
-
13
-
-
0020797571
-
Simple approaches to shift, days-off and tour scheduling problems
-
J. G. Morris and M. J. Showalter, Simple approaches to shift, days-off and tour scheduling problems. Mgmt Sci. 29, 942-950 (1983).
-
(1983)
Mgmt Sci.
, vol.29
, pp. 942-950
-
-
Morris, J.G.1
Showalter, M.J.2
-
14
-
-
0010767738
-
Personnel scheduling with flexishift models
-
J. Bailey and J. Field, Personnel scheduling with flexishift models. J. Opers Mgmt 5, 327-338 (1985).
-
(1985)
J. Opers Mgmt
, vol.5
, pp. 327-338
-
-
Bailey, J.1
Field, J.2
-
15
-
-
0022519776
-
United airlines station manpower planning system
-
T. J. Holloran and J. E. Byrn, United Airlines station manpower planning system. Interfaces 16, 39-50 (1986).
-
(1986)
Interfaces
, vol.16
, pp. 39-50
-
-
Holloran, T.J.1
Byrn, J.E.2
-
16
-
-
0003181293
-
An evaluation of a full-/part-time tour scheduling methodology
-
M. J. Showalter and V. A. Mabert, An evaluation of a full-/part-time tour scheduling methodology. Int. J. Opers Product Mgmt 8, 54-71 (1989).
-
(1989)
Int. J. Opers Product Mgmt
, vol.8
, pp. 54-71
-
-
Showalter, M.J.1
Mabert, V.A.2
-
17
-
-
84985773391
-
A comparative evaluation of labor tour scheduling methods
-
S. E. Bechtold, M. J. Brusco and M. J. Showalter, A comparative evaluation of labor tour scheduling methods. Decis. Sci. 22, 683-699 (1991).
-
(1991)
Decis. Sci.
, vol.22
, pp. 683-699
-
-
Bechtold, S.E.1
Brusco, M.J.2
Showalter, M.J.3
-
18
-
-
0027543260
-
A simulated annealing approach to the cyclic staff-scheduling problem
-
M. J. Brusco and L. W. Jacobs, A simulated annealing approach to the cyclic staff-scheduling problem. Nav. Res. Logist. 40, 69-84 (1993).
-
(1993)
Nav. Res. Logist.
, vol.40
, pp. 69-84
-
-
Brusco, M.J.1
Jacobs, L.W.2
-
19
-
-
0040966431
-
-
Microsoft Corporation, Redmond, WA
-
Microsoft Corporation, Microsoft FORTRAN Power Station 1.0. Microsoft Corporation, Redmond, WA (1993).
-
(1993)
Microsoft Fortran Power Station 1.0
-
-
-
20
-
-
0003611556
-
-
The Scientific Press, South San Francisco, CA
-
A. Brooke, D. Kendrick and A. Meeraus, GAMS. Release 2.25, A User's Guide. The Scientific Press, South San Francisco, CA (1992).
-
(1992)
GAMS. Release 2.25, a User's Guide
-
-
Brooke, A.1
Kendrick, D.2
Meeraus, A.3
|