-
1
-
-
0003075019
-
-
included," Nav. Res. Log. Quart., vol.1, no. 1, pp.61-68, 1954.
-
S.M. Johnson, "Optimal two-and-three-stage production schedules with setup times included," Nav. Res. Log. Quart., vol.1, no. 1, pp.61-68, 1954.
-
"Optimal Two-and-three-stage Production Schedules with Setup Times
-
-
Johnson, S.M.1
-
2
-
-
85027184249
-
-
Scheduling," Nav. Res. Log. Quart, vol.3, no.3, pp.201-203, 1956.
-
J.R. Jackson, "An extension of Johnson's results on job-lot Scheduling," Nav. Res. Log. Quart, vol.3, no.3, pp.201-203, 1956.
-
"An Extension of Johnson's Results on Job-lot
-
-
Jackson, J.R.1
-
3
-
-
0020013653
-
-
research," vol.20, no.l, pp.27-45, 1982.
-
J.H. Blackstone, D.T. Phillips, and G.L. Hogg, "A State-ofthe-art survey of dispatching rules for manufacturing job shop operations, international journal of production research," vol.20, no.l, pp.27-45, 1982.
-
D.T. Phillips, and G.L. Hogg, "A State-ofthe-art Survey of Dispatching Rules for Manufacturing Job Shop Operations, International Journal of Production
-
-
Blackstone, J.H.1
-
5
-
-
85027184301
-
-
Publishers, Boston, pp.149-188, 1995.
-
D.Y. Lee and F. DiCesare, "Pétri Net-Based Heuristic Scheduling for Flexible Manufacturing," Petri Nets in Flexible and Agile Automation, ed. MengChu Zhou, Kluwer Academic Publishers, Boston, pp.149-188, 1995.
-
And F. DiCesare, "Pétri Net-Based Heuristic Scheduling for Flexible Manufacturing," Petri Nets in Flexible and Agile Automation, Ed. MengChu Zhou, Kluwer Academic
-
-
Lee, D.Y.1
-
6
-
-
0028413979
-
-
Automation, vol.10, no.2, pp.I23-132, 1994.
-
D.Y. Lee and F. DiCesare, "Scheduling flexible manufacturing systems using Petri Nets and heuristic search," IEEE Trans. Robotics and Automation, vol.10, no.2, pp.I23-132, 1994.
-
And F. DiCesare, "Scheduling Flexible Manufacturing Systems Using Petri Nets and Heuristic Search," IEEE Trans. Robotics and
-
-
Lee, D.Y.1
-
7
-
-
0031144442
-
-
(C), vol.63, no.609, pp.1795-1802, 1997.
-
A. Inaba, T. Suzuki, and S. Okuma, "Generation of assembly or disassembly sequences based on topological operations," Trans, of the Japan Society of Mechanical Engineers (C), vol.63, no.609, pp.1795-1802, 1997.
-
T. Suzuki, and S. Okuma, "Generation of Assembly or Disassembly Sequences Based on Topological Operations," Trans, of the Japan Society of Mechanical Engineers
-
-
Inaba, A.1
-
8
-
-
85027119922
-
-
Systems-APMS'96, Kyoto, Japan, pp.557-562, 1996.
-
M.F. Sebaaly and H. Fujimoto, "Integrated planning and scheduling for multi-product job-shop assembly based on genetic algorithms," Proc. of the 6th IFIP TC5/WG5.7 International Conference on Advances in Production Management Systems-APMS'96, Kyoto, Japan, pp.557-562, 1996.
-
And H. Fujimoto, "Integrated Planning and Scheduling for Multi-product Job-shop Assembly Based on Genetic Algorithms," Proc. of the 6th IFIP TC5/WG5.7 International Conference on Advances in Production Management
-
-
Sebaaly, M.F.1
|