메뉴 건너뛰기




Volumn 10, Issue 2, 1994, Pages 123-132

Scheduling Flexible Manufacturing Systems using Petri Nets and Heuristic Search

Author keywords

[No Author keywords available]

Indexed keywords

FLEXIBLE MANUFACTURING SYSTEMS; HEURISTIC METHODS; MATHEMATICAL MODELS; PETRI NETS;

EID: 0028413979     PISSN: 1042296X     EISSN: None     Source Type: Journal    
DOI: 10.1109/70.282537     Document Type: Article
Times cited : (367)

References (52)
  • 1
    • 0024733452 scopus 로고
    • Robot control computation in microprocessor systems with multiple arithmetic processors using a modified DF/IHS scheduling algorithm
    • S. Ahmad and B. Li, “Robot control computation in microprocessor systems with multiple arithmetic processors using a modified DF/IHS scheduling algorithm,” IEEE Transactions on Systems, Man, and Cybernetics, vol. 19, no. 5, pp. 1167–1178, 1989.
    • (1989) IEEE Transactions on Systems, Man, and Cybernetics , vol.19 , Issue.5 , pp. 1167-1178
    • Ahmad, S.1    Li, B.2
  • 3
    • 0025623508 scopus 로고
    • Performance evaluation of automated manufacturing systems using generalized stochastic Petri nets
    • R. Y. Al-Jaar and A. A. Desrochers, “Performance evaluation of automated manufacturing systems using generalized stochastic Petri nets,” IEEE Transactions on Robotics and Automation, vol. 6, no. 6, pp. 621–639, 1990.
    • (1990) IEEE Transactions on Robotics and Automation , vol.6 , Issue.6 , pp. 621-639
    • Al-Jaar, R.Y.1    Desrochers, A.A.2
  • 5
    • 0038709760 scopus 로고
    • The schedule-sequencing problem
    • E. Bowman, “The schedule-sequencing problem,” Operations Research, vol. 7, no. pp. 621–624, 1959.
    • (1959) Operations Research , vol.7 , pp. 621-624
    • Bowman, E.1
  • 7
    • 0002596689 scopus 로고
    • Timed Petri net schedules
    • Rozenberg, Ed., Berlin: Springer-Verlag
    • J. Carlier and P. Chretienne, “Timed Petri net schedules,” in Advances in Petri Nets, Rozenberg, Ed., Berlin: Springer-Verlag, 1988, pp. 62–84.
    • (1988) Advances in Petri Nets , pp. 62-84
    • Carlier, J.1    Chretienne, P.2
  • 12
    • 0022706976 scopus 로고
    • A control perspective on recent trends in manufacturing systems
    • S. B. Gershwin and R. R. Hildebrant, et al., “A control perspective on recent trends in manufacturing systems,” IEEE Control Systems Magazine, vol. 6, no. 2, pp. 3–15, 1986.
    • (1986) IEEE Control Systems Magazine , vol.6 , Issue.2 , pp. 3-15
    • Gershwin, S.B.1    Hildebrant, R.R.2
  • 13
    • 0024479894 scopus 로고
    • Performance evaluation of job-shop systems using timed event-graphs
    • H. P. Hillion and J. Proth, “Performance evaluation of job-shop systems using timed event-graphs,” IEEE Transactions on Automatic Control, vol. 34, no. 1. pp. 3–9, 1989.
    • (1989) IEEE Transactions on Automatic Control , vol.34 , Issue.1 , pp. 3-9
    • Hillion, H.P.1    Proth, J.2
  • 18
    • 0025433819 scopus 로고
    • Synthesis of feedback control logic for a class of controlled Petri nets
    • May
    • L. E. Holloway and B. H. Krogh, “Synthesis of feedback control logic for a class of controlled Petri nets,” IEEE Transactions on Automatic Control, vol. 35, no. 5, pp. 514–523, May 1990.
    • (1990) IEEE Transactions on Automatic Control , vol.35 , Issue.5 , pp. 514-523
    • Holloway, L.E.1    Krogh, B.H.2
  • 22
    • 0026156730 scopus 로고
    • Resource allocation and performance evaluation in large human-machine organizations
    • P. Kapasouris and D. Serfaty, et al., “Resource allocation and performance evaluation in large human-machine organizations,” IEEE Transactions on Systems, Man, and Cybernetics, vol. 21, no. 3, pp. 521–532, 1991.
    • (1991) IEEE Transactions on Systems, Man, and Cybernetics , vol.21 , Issue.3 , pp. 521-532
    • Kapasouris, P.1    Serfaty, D.2
  • 23
  • 24
    • 84941542662 scopus 로고
    • Integrated tooling and scheduling of flexible machines: Theory and algorithms
    • Troy, NY, May
    • A. E. J. Lee, “Integrated tooling and scheduling of flexible machines: Theory and algorithms,” Ph.D. Dissertation, Rensselaer Polytechnic Institute, Troy, NY, May 1989.
    • (1989) Ph.D. Dissertation, Rensselaer Polytechnic Institute
    • Lee, A.E.J.1
  • 26
  • 27
    • 0027221308 scopus 로고
    • Integrated models for scheduling flexible manufacturing systems
    • Atlanta, Georgia, May 2–7
    • D. Y. Lee and F. DiCesare, “Integrated models for scheduling flexible manufacturing systems,” in Proceedings of the 1993 IEEE Intl. Conf. on Robot. & Auto., Atlanta, Georgia, May 2–7, 1993, pp. 827–832.
    • (1993) Proceedings of the 1993 IEEE Intl. Conf. on Robot & Auto. , pp. 827-832
    • Lee, D.Y.1    DiCesare, F.2
  • 29
    • 0024866826 scopus 로고
    • Planning and scheduling in a flexible manufacturing system using a dynamic routing method for automated guided vehicles
    • Scottsdale, AZ
    • P. S. Liu and L. C. Fu, “Planning and scheduling in a flexible manufacturing system using a dynamic routing method for automated guided vehicles,” in Proceedings of the 1989 IEEE International Conference on Robotics and Automation, Scottsdale, AZ, 1989, pp. 1584–1589.
    • (1989) Proceedings of the 1989 IEEE International Conference on Robotics and Automation , pp. 1584-1589
    • Liu, P.S.1    Fu, L.C.2
  • 31
    • 0025595665 scopus 로고
    • Schedule generation and reconfiguration for parallel machines
    • Dec.
    • P. B. Luh and D. J. Hoitomt, et al., “Schedule generation and reconfiguration for parallel machines,” IEEE Transactions on Robotics and Automation, vol. 6, no. 6, pp. 687–696, Dec. 1990.
    • (1990) IEEE Transactions on Robotics and Automation , vol.6 , Issue.6 , pp. 687-696
    • Luh, P.B.1    Hoitomt, D.J.2
  • 32
    • 0000237789 scopus 로고
    • On the job-shop scheduling problem
    • A. Manne, “On the job-shop scheduling problem,” Operations Research, vol. 8, no. pp. 219–223, 1960.
    • (1960) Operations Research , vol.8 , pp. 219-223
    • Manne, A.1
  • 33
    • 0011782937 scopus 로고
    • A review of job shop scheduling
    • June
    • P. Mellor, “A review of job shop scheduling,” Operational Research Quarterly, vol. 17, no. 2, pp. 161–171, June 1966.
    • (1966) Operational Research Quarterly , vol.17 , Issue.2 , pp. 161-171
    • Mellor, P.1
  • 39
    • 0019058848 scopus 로고
    • Performance evaluation of asynchronous concurrent systems using Petri nets
    • C. Ramamoorthy and G. Ho, “Performance evaluation of asynchronous concurrent systems using Petri nets,” IEEE Transactions on Software Engineering, vol. 6, no. 5, pp. 440–449. 1980.
    • (1980) IEEE Transactions on Software Engineering , vol.6 , Issue.5 , pp. 440-449
    • Ramamoorthy, C.1    Ho, G.2
  • 40
    • 0002532362 scopus 로고
    • Issues in the design of scheduling systems
    • Oliff, Ed. Elsevier
    • J. Rickel, “Issues in the design of scheduling systems,” in Expert Systems and Intelligent Manufacturing, Oliff, Ed. Elsevier, 1988, pp. 70–89.
    • (1988) Expert Systems and Intelligent Manufacturing , pp. 70-89
    • Rickel, J.1
  • 42
    • 0026156030 scopus 로고
    • Algebraic, mathematical programming, and network models of the deterministic job-shop scheduling problem
    • R. V. Rogers and K. P. White, “Algebraic, mathematical programming, and network models of the deterministic job-shop scheduling problem,” IEEE Transactions on Systems, Man, and Cybernetics, vol. 21, no. 3, pp. 693–697, 1991.
    • (1991) IEEE Transactions on Systems, Man, and Cybernetics , vol.21 , Issue.3 , pp. 693-697
    • Rogers, R.V.1    White, K.P.2
  • 44
    • 0027040543 scopus 로고
    • Truncation of Petri net models of scheduling problems for optimum solutions
    • San Francisco, CA, July 13–15
    • L. Shen and Q. Chen, et al., “Truncation of Petri net models of scheduling problems for optimum solutions,” Proceedings of the Japan/USA Symposium on Flexible Automation, San Francisco, CA, July 13–15, 1992, pp. 1681–1688.
    • (1992) Proceedings of the Japan/USA Symposium on Flexible Automation , pp. 1681-1688
    • Shen, L.1    Chen, Q.2
  • 45
  • 46
    • 85014512742 scopus 로고
    • Performance evaluation of systems using nets
    • Brauer, Ed. Berlin: Springer-Verlag
    • J. Sifakis, “Performance evaluation of systems using nets,” Net Theory and Applications. Brauer, Ed. Berlin: Springer-Verlag, 1980, pp. 307–319.
    • (1980) Net Theory and Applications , pp. 307-319
    • Sifakis, J.1
  • 47
    • 0001153857 scopus 로고
    • Petri nets and flexible manufacturing
    • Berlin: Springer-Verlag
    • M. Silva and R. Valette, “Petri nets and flexible manufacturing,” Advances in Petri Nets. Berlin: Springer-Verlag, 1989, pp. 374–417.
    • (1989) Advances in Petri Nets , pp. 374-417
    • Silva, M.1    Valette, R.2
  • 48
    • 0018544931 scopus 로고
    • Job-shop scheduling heuristics with local neighbourhood search
    • A. S. Spachis and J. R. King, “Job-shop scheduling heuristics with local neighbourhood search,” International Journal of Production Research, vol. 17, no. 6, pp. 507–526, 1979.
    • (1979) International Journal of Production Research , vol.17 , Issue.6 , pp. 507-526
    • Spachis, A.S.1    King, J.R.2
  • 50
    • 0024141580 scopus 로고
    • Stochastic Petri net models for performance evaluation of automated manufacturing systems
    • N. Viswanadham and Y. Narahari, “Stochastic Petri net models for performance evaluation of automated manufacturing systems,” Information and Decision Technologies, vol. 14, no. pp. 125–142, 1988.
    • (1988) Information and Decision Technologies , vol.14 , pp. 125-142
    • Viswanadham, N.1    Narahari, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.