메뉴 건너뛰기




Volumn 4, Issue 4, 2010, Pages 517-522

Total Productive Maintenance Review and Overall Equipment Effectiveness Measurement

Author keywords

Overall Equipment Effectiveness; Total Productive Maintenance; TPM

Indexed keywords

PRODUCTION CONTROL; STEELMAKING;

EID: 85187778110     PISSN: 19956665     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (58)

References (13)
  • 1
    • 33644598208 scopus 로고    scopus 로고
    • Manufacturing excellence through TPM implementation: a practical analysis
    • [1]
    • [1] Rajiv Kumar Sharma, Dinesh Kumar and Pradeep Kumar, "Manufacturing excellence through TPM implementation: a practical analysis", Industrial Management & Data System, Vol. 106 No. 2, 2006, 256-280.
    • (2006) Industrial Management & Data System , vol.106 , Issue.2 , pp. 256-280
    • Sharma, Rajiv Kumar1    Kumar, Dinesh2    Kumar, Pradeep3
  • 11
    • 0032688919 scopus 로고    scopus 로고
    • Factors affecting successful implementation of total productive maintenance A UK manufacturing case study perspective
    • [11]
    • [11] C.J. Bamber, J.M. Sharp and M.T. Hides, "Factors affecting successful implementation of total productive maintenance A UK manufacturing case study perspective", Journal of Quality in Maintenance engineering, Vol. 5 No. 3, 1999, 162-181.
    • (1999) Journal of Quality in Maintenance engineering , vol.5 , Issue.3 , pp. 162-181
    • Bamber, C.J.1    Sharp, J.M.2    Hides, M.T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.