-
2
-
-
85059443428
-
Prevention of flow after cementing of surface casing
-
paper presented at the Baton Rouge, Nov
-
Manowski, W.: "Prevention of Flow After Cementing of Surface Casing," paper presented at the 1996 LSU/MMS Well Control Workshop, Baton Rouge, Nov. 19-20.
-
1996 LSU/MMS Well Control Workshop
, pp. 19-20
-
-
Manowski, W.1
-
3
-
-
85054335090
-
Current methods for analysis and remediation of sustained casing pressure
-
paper presented at the Baton Rouge, Nov
-
Scott, S. and Bourgoyne, Jr., A.T.: "Current Methods for Analysis and Remediation of Sustained Casing Pressure," paper presented at the 1996 LSU/MMS Well Control Workshop, Baton Rouge, Nov. 19-20.
-
1996 LSU/MMS Well Control Workshop
, pp. 19-20
-
-
Scott, S.1
Bourgoyne, A.T.2
-
4
-
-
0042890124
-
New technology in gas migration control
-
paper SPE 16653, presented at the Dallas, Sept
-
Sykes, R.L. and Logan, J.L.: "New Technology in Gas Migration Control," paper SPE 16653, presented at the 1987 SPE Annual Technology Conference and Exhibition, Dallas, Sept. 27-30.
-
1987 SPE Annual Technology Conference and Exhibition
, pp. 27-30
-
-
Sykes, R.L.1
Logan, J.L.2
-
5
-
-
1142297972
-
Effects of temperature and cement admixes on bond strength
-
August
-
Carpenter, R.B., Brady, J.L., and Blount, C.G.: "Effects of Temperature and Cement Admixes on Bond Strength," JPT (August 1992).
-
(1992)
JPT
-
-
Carpenter, R.B.1
Brady, J.L.2
Blount, C.G.3
-
6
-
-
0024858989
-
Cementing displacement practices: Application in the field
-
paper SPE/IADC 18617, presented at the New Orleans, Feb. 28-Mar. 3
-
Smith, T.R.: "Cementing Displacement Practices: Application in the Field," paper SPE/IADC 18617, presented at the 1989 SPE/ IADC Drilling Conference, New Orleans, Feb. 28-Mar. 3.
-
1989 SPE/ IADC Drilling Conference
-
-
Smith, T.R.1
-
7
-
-
85059486296
-
Cementing oil and gas wells
-
May
-
Suman, Jr., G.O. and Ellis, R.C.: "Cementing Oil and Gas Wells," World Oil (May 1997).
-
(1997)
World Oil
-
-
Suman, G.O.1
Ellis, R.C.2
-
8
-
-
0021575586
-
New evaluation for annular gas-flow potential
-
Dec. 17
-
Sutton, D.L., Sabins, F., and Faul, R.R.: "New Evaluation for Annular Gas-Flow Potential," Oil & Gas J. (Dec. 17, 1984).
-
(1984)
Oil & Gas J
-
-
Sutton, D.L.1
Sabins, F.2
Faul, R.R.3
-
9
-
-
84888975153
-
New quick-setting cement solves shallow gas migration problems and reduces WOC time
-
paper SPE 14500 presented at the Morgantown, Nov. 6-8
-
Sepos, D.J. and Cart, B.W.: "New Quick-Setting Cement Solves Shallow Gas Migration Problems and Reduces WOC Time," paper SPE 14500 presented at the 1985 Eastern Regional Meeting, Morgantown, Nov. 6-8.
-
1985 Eastern Regional Meeting
-
-
Sepos, D.J.1
Cart, B.W.2
-
10
-
-
0022561660
-
2 – Silica cement under high-temperature and high-pressure conditions
-
January
-
2 – Silica Cement Under High-Temperature and High-Pressure Conditions," SPEPE (January 1986).
-
(1986)
SPEPE
-
-
Sasaki, S.1
Kobayashi, W.2
Okabayashi, S.3
-
13
-
-
85058972013
-
Cement bonding
-
December
-
Jeffcoat, D.: "Cement Bonding," Drilling (December 1981).
-
(1981)
Drilling
-
-
Jeffcoat, D.1
-
14
-
-
85059457588
-
A well or a hole in the ground - The difference can be the cement job
-
May/June
-
Walther, E.: "A Well or a Hole in the Ground - The Difference Can Be the Cement Job," Well Servicing (May/June 1982).
-
(1982)
Well Servicing
-
-
Walther, E.1
-
15
-
-
85059461367
-
Pre-planning/pre-investing during drilling phase will reduce P & A cost, reduce environmental risk & increase long-term P & A reliability
-
The Hague, The Netherlands, Nov. 3-5
-
Kelm, C.H. and Slocum, T.B.: "Pre-Planning/Pre-Investing During Drilling Phase Will Reduce P & A Cost, Reduce Environmental Risk & Increase Long-Term P & A Reliability," presented at the 1997 Deep Offshore Technology Conference and Exhibition, The Hague, The Netherlands, Nov. 3-5.
-
1997 Deep Offshore Technology Conference and Exhibition
-
-
Kelm, C.H.1
Slocum, T.B.2
|