메뉴 건너뛰기




Volumn , Issue , 1999, Pages

Well abandonment—A “best practices” approach can reduce environmental risk

Author keywords

[No Author keywords available]

Indexed keywords

BOREHOLES; ENVIRONMENTAL REGULATIONS; INFILL DRILLING; LAWS AND LEGISLATION; OIL BEARING FORMATIONS; OIL FIELD EQUIPMENT; OIL WELLS; PETROLEUM RESERVOIRS; WELL DRILLING;

EID: 85086690633     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.2523/54344-ms     Document Type: Conference Paper
Times cited : (16)

References (15)
  • 2
    • 85059443428 scopus 로고    scopus 로고
    • Prevention of flow after cementing of surface casing
    • paper presented at the Baton Rouge, Nov
    • Manowski, W.: "Prevention of Flow After Cementing of Surface Casing," paper presented at the 1996 LSU/MMS Well Control Workshop, Baton Rouge, Nov. 19-20.
    • 1996 LSU/MMS Well Control Workshop , pp. 19-20
    • Manowski, W.1
  • 3
    • 85054335090 scopus 로고    scopus 로고
    • Current methods for analysis and remediation of sustained casing pressure
    • paper presented at the Baton Rouge, Nov
    • Scott, S. and Bourgoyne, Jr., A.T.: "Current Methods for Analysis and Remediation of Sustained Casing Pressure," paper presented at the 1996 LSU/MMS Well Control Workshop, Baton Rouge, Nov. 19-20.
    • 1996 LSU/MMS Well Control Workshop , pp. 19-20
    • Scott, S.1    Bourgoyne, A.T.2
  • 5
    • 1142297972 scopus 로고
    • Effects of temperature and cement admixes on bond strength
    • August
    • Carpenter, R.B., Brady, J.L., and Blount, C.G.: "Effects of Temperature and Cement Admixes on Bond Strength," JPT (August 1992).
    • (1992) JPT
    • Carpenter, R.B.1    Brady, J.L.2    Blount, C.G.3
  • 6
    • 0024858989 scopus 로고    scopus 로고
    • Cementing displacement practices: Application in the field
    • paper SPE/IADC 18617, presented at the New Orleans, Feb. 28-Mar. 3
    • Smith, T.R.: "Cementing Displacement Practices: Application in the Field," paper SPE/IADC 18617, presented at the 1989 SPE/ IADC Drilling Conference, New Orleans, Feb. 28-Mar. 3.
    • 1989 SPE/ IADC Drilling Conference
    • Smith, T.R.1
  • 7
    • 85059486296 scopus 로고    scopus 로고
    • Cementing oil and gas wells
    • May
    • Suman, Jr., G.O. and Ellis, R.C.: "Cementing Oil and Gas Wells," World Oil (May 1997).
    • (1997) World Oil
    • Suman, G.O.1    Ellis, R.C.2
  • 8
    • 0021575586 scopus 로고
    • New evaluation for annular gas-flow potential
    • Dec. 17
    • Sutton, D.L., Sabins, F., and Faul, R.R.: "New Evaluation for Annular Gas-Flow Potential," Oil & Gas J. (Dec. 17, 1984).
    • (1984) Oil & Gas J
    • Sutton, D.L.1    Sabins, F.2    Faul, R.R.3
  • 9
    • 84888975153 scopus 로고    scopus 로고
    • New quick-setting cement solves shallow gas migration problems and reduces WOC time
    • paper SPE 14500 presented at the Morgantown, Nov. 6-8
    • Sepos, D.J. and Cart, B.W.: "New Quick-Setting Cement Solves Shallow Gas Migration Problems and Reduces WOC Time," paper SPE 14500 presented at the 1985 Eastern Regional Meeting, Morgantown, Nov. 6-8.
    • 1985 Eastern Regional Meeting
    • Sepos, D.J.1    Cart, B.W.2
  • 10
    • 0022561660 scopus 로고
    • 2 – Silica cement under high-temperature and high-pressure conditions
    • January
    • 2 – Silica Cement Under High-Temperature and High-Pressure Conditions," SPEPE (January 1986).
    • (1986) SPEPE
    • Sasaki, S.1    Kobayashi, W.2    Okabayashi, S.3
  • 13
    • 85058972013 scopus 로고
    • Cement bonding
    • December
    • Jeffcoat, D.: "Cement Bonding," Drilling (December 1981).
    • (1981) Drilling
    • Jeffcoat, D.1
  • 14
    • 85059457588 scopus 로고
    • A well or a hole in the ground - The difference can be the cement job
    • May/June
    • Walther, E.: "A Well or a Hole in the Ground - The Difference Can Be the Cement Job," Well Servicing (May/June 1982).
    • (1982) Well Servicing
    • Walther, E.1
  • 15
    • 85059461367 scopus 로고    scopus 로고
    • Pre-planning/pre-investing during drilling phase will reduce P & A cost, reduce environmental risk & increase long-term P & A reliability
    • The Hague, The Netherlands, Nov. 3-5
    • Kelm, C.H. and Slocum, T.B.: "Pre-Planning/Pre-Investing During Drilling Phase Will Reduce P & A Cost, Reduce Environmental Risk & Increase Long-Term P & A Reliability," presented at the 1997 Deep Offshore Technology Conference and Exhibition, The Hague, The Netherlands, Nov. 3-5.
    • 1997 Deep Offshore Technology Conference and Exhibition
    • Kelm, C.H.1    Slocum, T.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.