메뉴 건너뛰기




Volumn 1985-November, Issue , 1985, Pages 87-89

New quick-setting cement solves shallow gas migration problems and reduces WOC time

Author keywords

[No Author keywords available]

Indexed keywords

CEMENTS; COMPRESSIVE STRENGTH; EXPANSION; GASES; INFILL DRILLING; NATURAL GAS; NATURAL GAS WELLS; POTABLE WATER; TEMPERATURE; WELL WORKOVER;

EID: 84888975153     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.2118/14500-ms     Document Type: Conference Paper
Times cited : (6)

References (7)
  • 1
    • 0019049404 scopus 로고
    • Study of factors causing annular gas flow following primary cementing
    • Aug
    • Tinsley, J. M., Miller, E. C, and Sutton, D. L.: "Study of Factors Causing Annular Gas Flow Following Primary Cementing", J. Pet Tech. (Aug. 1980) 1427-1437.
    • (1980) J. Pet Tech , pp. 1427-1437
    • Tinsley, J.M.1    Miller, E.C.2    Sutton, D.L.3
  • 2
    • 85059148965 scopus 로고
    • Bonding studies of cementing compositions to pipe and formations
    • Dallas
    • Evans, G. W. and Carter, L. G.: "Bonding Studies of Cementing Compositions to Pipe and Formations", API Drilling and Production Practices, Dallas (1962) 72-79.
    • (1962) API Drilling and Production Practices , pp. 72-79
    • Evans, G.W.1    Carter, L.G.2
  • 3
    • 0020813985 scopus 로고
    • An integrated approach for successful primary cementations
    • Sept.
    • Hartog, J. J., Davies, D. R., and Stevens, R. B.: "An Integrated Approach for Successful Primary Cementations", J. Pet. Tech. (Sept. 1983) 1600-1610.
    • (1983) J. Pet. Tech , pp. 1600-1610
    • Hartog, J.J.1    Davies, D.R.2    Stevens, R.B.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.