-
3
-
-
85029585464
-
-
Bosch IoT Platform: https://www.bosch-si.com/iot-platform/bosch-iot-suite/homepage-bosch-iot-suite.html
-
-
-
-
4
-
-
85029592899
-
-
IBM Watson Internet of Things: https://www.ibm.com/internet-of-things/
-
-
-
-
5
-
-
85029592651
-
-
Microsoft Internet of Things: https://www.microsoft.com/en-gb/internet-of-things/
-
-
-
-
6
-
-
84921300723
-
A cyber-physical systems architecture for industry 4.0-based manufacturing systems
-
Lee, J., Bagheri, B., Kao, H.-A.: A cyber-physical systems architecture for industry 4.0-based manufacturing systems. Manufact. Lett. 3, 18–23 (2015)
-
(2015)
Manufact. Lett.
, vol.3
, pp. 18-23
-
-
Lee, J.1
Bagheri, B.2
Kao, H.-A.3
-
8
-
-
0006648954
-
Virtuelle Unternehmenals Unternehmenstyp der Zukunft?
-
Arnold, D., Faisst, W., Haertling, M., Sieber, P.: Virtuelle Unternehmenals Unternehmenstyp der Zukunft? HMD Theorie und Praxis der Wirtschaftsinformatik 32(185) (1995)
-
(1995)
HMD Theorie Und Praxis Der Wirtschaftsinformatik
, vol.32
, Issue.185
-
-
Arnold, D.1
Faisst, W.2
Haertling, M.3
Sieber, P.4
-
9
-
-
0032667079
-
Application of information technology to a virtual enterprise broker: The case of Bill Epstein
-
Kanet, J.J., Faisst, W., Mertens, P.: Application of information technology to a virtual enterprise broker: the case of Bill Epstein. Int. J. Prod. Econ. 62, 23–32 (1999)
-
(1999)
Int. J. Prod. Econ
, vol.62
, pp. 23-32
-
-
Kanet, J.J.1
Faisst, W.2
Mertens, P.3
-
10
-
-
84902548284
-
Co-simulation environment for optimising energy efficiency inproduction systems
-
Bleicher, F., Duer, F., Leobner, I., Kovacic, I., Heinzl, B., Kastner, W.: Co-simulation environment for optimising energy efficiency inproduction systems. CIRP Ann. Manufact. Technol. 63, 441–444 (2014)
-
(2014)
CIRP Ann. Manufact. Technol.
, vol.63
, pp. 441-444
-
-
Bleicher, F.1
Duer, F.2
Leobner, I.3
Kovacic, I.4
Heinzl, B.5
Kastner, W.6
-
12
-
-
85029597041
-
Energy-aware decision support for production scheduling
-
Plitsos, S., Repoussis, P.P., Mourtos, I., Tarantilis, C.D.: Energy-aware decision support for production scheduling. Decision Support Systems (under review) (2015)
-
(2015)
Decision Support Systems (Under Review)
-
-
Plitsos, S.1
Repoussis, P.P.2
Mourtos, I.3
Tarantilis, C.D.4
-
13
-
-
85029591485
-
Iterated local search algorithm for flexible job shop scheduling problems with resource constraints
-
May, Washington, USA
-
Repoussis, P.P., Paraskevopoulos, D.C., Tarantilis, C.D.: Iterated local search algorithm for flexible job shop scheduling problems with resource constraints. In: POMS 2015 Annual Conference, 8–11 May, Washington, USA (2015)
-
(2015)
POMS 2015 Annual Conference
, pp. 8-11
-
-
Repoussis, P.P.1
Paraskevopoulos, D.C.2
Tarantilis, C.D.3
-
14
-
-
0038209741
-
Solving the multi-mode resource-constraint project scheduling problem with genetic algorithms
-
Alcaraz, J., Maroto, C., Ruiz, R.: Solving the multi-mode resource-constraint project scheduling problem with genetic algorithms. J. Oper. Res. Soc. 54, 614–626 (2003)
-
(2003)
J. Oper. Res. Soc.
, vol.54
, pp. 614-626
-
-
Alcaraz, J.1
Maroto, C.2
Ruiz, R.3
-
15
-
-
85029585000
-
-
http://www.disrupt-project.eu/
-
-
-
-
16
-
-
85029579996
-
-
Industrial Internet Consortium Reference Archtitecture. https://www.iiconsortium.org/IIRA-1-7-ajs.pdf
-
-
-
-
17
-
-
85029584806
-
-
Reference Architecture Model Industrie 4.0. https://webstore.iec.ch/preview/info_iecpas 63088%7Bed1.0%7Den.pdf
-
-
-
-
18
-
-
85029599537
-
-
IoT-A Internet of Things Architecture Project Final Report. http://cordis.europa.eu/docs/projects/cnect/1/257521/080/reports/001-257521IoTAPFRrenditionDownload.pdf
-
-
-
|