-
1
-
-
22944472668
-
A product information modeling framework for product lifecycle management
-
Sudarsan R, Fenves SJ, Sriram RD, Wang F (2005) A product information modeling framework for product lifecycle management. Computer-Aided Design 37:1399-1411
-
(2005)
Computer-Aided Design
, vol.37
, pp. 1399-1411
-
-
Sudarsan, R.1
Fenves, S.J.2
Sriram, R.D.3
Wang, F.4
-
2
-
-
33645564499
-
Internet-based collaborative product development chain for networked product development
-
Yang Y, Zhang J, Wan L, Chen L (2006) Internet-based collaborative product development chain for networked product development. Int J Adv Manuf Tech 28:845-853
-
(2006)
Int J Adv Manuf Tech
, vol.28
, pp. 845-853
-
-
Yang, Y.1
Zhang, J.2
Wan, L.3
Chen, L.4
-
3
-
-
0038481102
-
A web based collaborative product design platform for dispersed network manufacturing
-
Zhan HF, Lee WB, Cheung CF, Kwok SK, Gu XJ (2003) A web based collaborative product design platform for dispersed network manufacturing. J Mater Process Tech 138:600-604
-
(2003)
J Mater Process Tech
, vol.138
, pp. 600-604
-
-
Zhan, H.F.1
Lee, W.B.2
Cheung, C.F.3
Kwok, S.K.4
Gu, X.J.5
-
5
-
-
84941151770
-
Collaborative manufacturing explained
-
MESA International (2004) Collaborative manufacturing explained. MESA International white paper, available at http://www.mesa.org/whitepapers/ cme040331.pdf
-
(2004)
MESA International White Paper
-
-
-
7
-
-
0033344909
-
Multi-plant production planning in capacitated self-configuring two stage serial systems
-
Vercellis C (1999) Multi-plant production planning in capacitated self-configuring two stage serial systems. Eur J Oper Res 119:451-460
-
(1999)
Eur J Oper Res
, vol.119
, pp. 451-460
-
-
Vercellis, C.1
-
8
-
-
0035452612
-
An integrated model for an industrial production-distribution problem
-
Dhaenens-Flipo C, Finke G (2001) An integrated model for an industrial production-distribution problem. IIE Transaction 33:705-715
-
(2001)
IIE Transaction
, vol.33
, pp. 705-715
-
-
Dhaenens-Flipo, C.1
Finke, G.2
-
9
-
-
0036642688
-
Integrated process planning and scheduling with minimizing total tardiness in multi-plant supply chain
-
Moon C, Kim J, Hur S (2002) Integrated process planning and scheduling with minimizing total tardiness in multi-plant supply chain. Comput Ind Eng 43:331-349
-
(2002)
Comput Ind Eng
, vol.43
, pp. 331-349
-
-
Moon, C.1
Kim, J.2
Hur, S.3
-
10
-
-
28544453481
-
A distributed internet-based framework for manufacturing planning
-
Cecil J, Davidson S, Muthaiyan A (2006) A distributed internet-based framework for manufacturing planning. Int J Adv Manuf Technol 27:619-624
-
(2006)
Int J Adv Manuf Technol
, vol.27
, pp. 619-624
-
-
Cecil, J.1
Davidson, S.2
Muthaiyan, A.3
-
11
-
-
34548213658
-
Component-based modeling of enterprise architectures for collaborative manufacturing
-
Chae H, Choi Y, Kim K (2007) Component-based modeling of enterprise architectures for collaborative manufacturing. Int J Adv Manuf Technol 34:605-616
-
(2007)
Int J Adv Manuf Technol
, vol.34
, pp. 605-616
-
-
Chae, H.1
Choi, Y.2
Kim, K.3
-
13
-
-
48749110421
-
Genetic optimization of order scheduling with multiple uncertainties
-
Guo ZX, Wong WK, Leung S Y S, Fan JT, Chan SF (2008) Genetic optimization of order scheduling with multiple uncertainties. Expert Syst Appl 35:1788-1801
-
(2008)
Expert Syst Appl
, vol.35
, pp. 1788-1801
-
-
Guo, Z.X.1
Wong, W.K.2
Leung, S.Y.S.3
Fan, J.T.4
Chan, S.F.5
-
14
-
-
0036300695
-
Reactive recovery of job shop schedules-A review
-
Raheja AS, Subramaniam V (2002) Reactive recovery of job shop schedules-A review. Int J Adv Manuf Technol 19:756-763
-
(2002)
Int J Adv Manuf Technol
, vol.19
, pp. 756-763
-
-
Raheja, A.S.1
Subramaniam, V.2
-
15
-
-
14044268702
-
An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
-
Xia WJ, Wu ZM (2005) An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems. Comput Ind Eng 48(2):409-425
-
(2005)
Comput Ind Eng
, vol.48
, Issue.2
, pp. 409-425
-
-
Xia, W.J.1
Wu, Z.M.2
-
16
-
-
0036588767
-
Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
-
Kacem I, Hammadi S, Borne P (2002) Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems. IEEE Sys Man Cybern 32(2):172
-
(2002)
IEEE Sys Man Cybern
, vol.32
, Issue.2
, pp. 172
-
-
Kacem, I.1
Hammadi, S.2
Borne, P.3
-
17
-
-
0037201140
-
Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
-
Kacem I, Hammadi S, Borne P (2002) Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic. Math Comput Simul 60(3-5):245-276
-
(2002)
Math Comput Simul
, vol.60
, Issue.3-5
, pp. 245-276
-
-
Kacem, I.1
Hammadi, S.2
Borne, P.3
-
18
-
-
33751381442
-
Variable neighborhood particle swarm optimization for multi-objective flexible job-shop scheduling problems
-
Liu HB, Abraham A, Choi O, Moon SH (2006) Variable neighborhood particle swarm optimization for multi-objective flexible job-shop scheduling problems. Lect Notes Comput Sci 4247:197-204
-
(2006)
Lect Notes Comput Sci
, vol.4247
, pp. 197-204
-
-
Liu, H.B.1
Abraham, A.2
Choi, O.3
Moon, S.H.4
-
19
-
-
79958830093
-
Dynamic flexible job shop scheduling with alternative process plans: An agent-based approach
-
doi:10.1007/s00170-010-2986-7
-
Amir R, Saeed M (2010) Dynamic flexible job shop scheduling with alternative process plans: an agent-based approach. Int J Adv Manuf Technol. doi:10.1007/s00170-010-2986-7
-
(2010)
Int J Adv Manuf Technol.
-
-
Amir, R.1
Saeed, M.2
-
20
-
-
78149466035
-
An efficient architecture for scheduling flexible job-shop with machine availability constraints
-
Moradi E, Fatemi Ghomi S M T, Zandieh M (2010) An efficient architecture for scheduling flexible job-shop with machine availability constraints. Int J Adv Manuf Technol 51:325-339
-
(2010)
Int J Adv Manuf Technol
, vol.51
, pp. 325-339
-
-
Moradi, E.1
Fatemi Ghomi, S.M.T.2
Zandieh, M.3
-
21
-
-
77953622630
-
A parallel genetic algorithm for a flexible job-shop scheduling problem with sequence dependent setups
-
Defersha FM, Chen M (2010) A parallel genetic algorithm for a flexible job-shop scheduling problem with sequence dependent setups. Int J Adv Manuf Technol 49:263-279
-
(2010)
Int J Adv Manuf Technol
, vol.49
, pp. 263-279
-
-
Defersha, F.M.1
Chen, M.2
-
22
-
-
78650179774
-
A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem
-
Wang X, Gao L, Zhang C, Shao X (2010) A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem. Int J Adv Manuf Technol 51:757-767
-
(2010)
Int J Adv Manuf Technol
, vol.51
, pp. 757-767
-
-
Wang, X.1
Gao, L.2
Zhang, C.3
Shao, X.4
-
23
-
-
77956231848
-
Research on ontology-based integration of product knowledge for collaborative manufacturing
-
doi:10.1007/s00170-009-2463-3
-
Jiang Y, Peng G, Liu W (2010) Research on ontology-based integration of product knowledge for collaborative manufacturing. Int J Adv Manuf Technol. doi:10.1007/s00170-009-2463-3
-
(2010)
Int J Adv Manuf Technol.
-
-
Jiang, Y.1
Peng, G.2
Liu, W.3
-
24
-
-
33745698696
-
Neural network simulation metamodels and genetic algorithms in analysis and design of manufacturing cells
-
Vosniakos G-C, Tsifakis A, Benardos P (2006) Neural network simulation metamodels and genetic algorithms in analysis and design of manufacturing cells. Int J Adv Manuf Technol 29:541-550
-
(2006)
Int J Adv Manuf Technol
, vol.29
, pp. 541-550
-
-
Vosniakos, G.-C.1
Tsifakis, A.2
Benardos, P.3
-
25
-
-
78650177338
-
A neural network-based control scheme for monitoring start-up processes and short runs
-
Garjani M, Noorossana R, Saghaei A (2010) A neural network-based control scheme for monitoring start-up processes and short runs. Int J Adv Manuf Technol 51:1023-1032
-
(2010)
Int J Adv Manuf Technol
, vol.51
, pp. 1023-1032
-
-
Garjani, M.1
Noorossana, R.2
Saghaei, A.3
-
26
-
-
78650297118
-
A flexible artificial neural network-fuzzy simulation algorithm for scheduling a flow shop with multiple processors
-
Azadeh A, Moghaddam M, Geranmayeh P, Naghavi A (2010) A flexible artificial neural network-fuzzy simulation algorithm for scheduling a flow shop with multiple processors. Int J Adv Manuf Technol 50:699-715
-
(2010)
Int J Adv Manuf Technol
, vol.50
, pp. 699-715
-
-
Azadeh, A.1
Moghaddam, M.2
Geranmayeh, P.3
Naghavi, A.4
-
27
-
-
77953611596
-
Optimization of injection molding process parameters using integrated artificial neural network model and expected improvement function method
-
Shi H, Gao Y, Wang X (2010) Optimization of injection molding process parameters using integrated artificial neural network model and expected improvement function method. Int J Adv Manuf Technol 48:955-962
-
(2010)
Int J Adv Manuf Technol
, vol.48
, pp. 955-962
-
-
Shi, H.1
Gao, Y.2
Wang, X.3
-
28
-
-
70449521323
-
A hybrid model using genetic algorithm and neural network for process parameters optimization in NC camshaft grinding
-
Deng ZH, Zhang XH, Liu W, Cao H (2010) A hybrid model using genetic algorithm and neural network for process parameters optimization in NC camshaft grinding. Int J Adv Manuf Technol 45:859-866
-
(2010)
Int J Adv Manuf Technol
, vol.45
, pp. 859-866
-
-
Deng, Z.H.1
Zhang, X.H.2
Liu, W.3
Cao, H.4
|