-
1
-
-
33748699557
-
A genetic algorithm approach to the integrated inventory-distribution problem
-
Abdelmaguid, T.F., Dessouky, M.M., A genetic algorithm approach to the integrated inventory-distribution problem. Int. J. Prod. Res. 44:21 (2006), 4445–4464.
-
(2006)
Int. J. Prod. Res.
, vol.44
, Issue.21
, pp. 4445-4464
-
-
Abdelmaguid, T.F.1
Dessouky, M.M.2
-
2
-
-
67349140917
-
Heuristic approaches for the inventory-routing problem with backlogging
-
Abdelmaguid, T.F., Dessouky, M.M., Ordóñez, F., Heuristic approaches for the inventory-routing problem with backlogging. Comput. Ind. Eng. 56:4 (2009), 1519–1534.
-
(2009)
Comput. Ind. Eng.
, vol.56
, Issue.4
, pp. 1519-1534
-
-
Abdelmaguid, T.F.1
Dessouky, M.M.2
Ordóñez, F.3
-
3
-
-
84927936310
-
Pollution-inventory routing problem with perishable goods
-
P. Golinska Springer International Publishing. EcoProduction
-
Al Shamsi, A., Al Raisi, A., Aftab, M., Pollution-inventory routing problem with perishable goods. Golinska, P., (eds.) Logistics Operations, Supply Chain Management and Sustainability, 2014, Springer International Publishing. EcoProduction, 585–596.
-
(2014)
Logistics Operations, Supply Chain Management and Sustainability
, pp. 585-596
-
-
Al Shamsi, A.1
Al Raisi, A.2
Aftab, M.3
-
4
-
-
84927927336
-
Inventory routing problem with CO2 emissions consideration
-
P. Golinska ability. Springer International Publishing. EcoProduction
-
Alkawaleet, N., Hsieh, Y.F., Wang, Y., Inventory routing problem with CO2 emissions consideration. Golinska, P., (eds.) Logistics Operations, Supply Chain Management and Sustain, 2014, ability. Springer International Publishing. EcoProduction, 611–619.
-
(2014)
Logistics Operations, Supply Chain Management and Sustain
, pp. 611-619
-
-
Alkawaleet, N.1
Hsieh, Y.F.2
Wang, Y.3
-
5
-
-
75749108843
-
Industrial aspects and literature survey: combined inventory management and routing
-
Andersson, H., Ho, A., Christiansen, M., Hasle, G., Likketangen, A., Industrial aspects and literature survey: combined inventory management and routing. Comput. Oper. Res. 37:9 (2010), 1515–1536.
-
(2010)
Comput. Oper. Res.
, vol.37
, Issue.9
, pp. 1515-1536
-
-
Andersson, H.1
Ho, A.2
Christiansen, M.3
Hasle, G.4
Likketangen, A.5
-
6
-
-
67349167929
-
A branch-and- cut algorithm for a vendor-managed inventory-routing problem
-
Archetti, C., Bertazzi, L., Laporte, G., Speranza, M.G., A branch-and- cut algorithm for a vendor-managed inventory-routing problem. Transp. Sci. 41:3 (2007), 382–391.
-
(2007)
Transp. Sci.
, vol.41
, Issue.3
, pp. 382-391
-
-
Archetti, C.1
Bertazzi, L.2
Laporte, G.3
Speranza, M.G.4
-
7
-
-
0032219159
-
Dynamic routing-and-inventory problems: a review
-
Baitaa, F., Ukovicha, W., Pesentib, R., Favarettoc, D., Dynamic routing-and-inventory problems: a review. Transp. Res. Part A Policy Pract. 32:8 (1998), 585–598.
-
(1998)
Transp. Res. Part A Policy Pract.
, vol.32
, Issue.8
, pp. 585-598
-
-
Baitaa, F.1
Ukovicha, W.2
Pesentib, R.3
Favarettoc, D.4
-
8
-
-
84989493292
-
An experimental study of rolling schedules in production planning
-
Baker, K.R., An experimental study of rolling schedules in production planning. Decis. Sci. 8 (1977), 19–27.
-
(1977)
Decis. Sci.
, vol.8
, pp. 19-27
-
-
Baker, K.R.1
-
9
-
-
0020911813
-
Improving the distribution of industrial gases with an on-line computerized routing and scheduling optimizer
-
Bell, W.J., Dalberto, L.M., Fisher, M.L., et al. Improving the distribution of industrial gases with an on-line computerized routing and scheduling optimizer. Interfaces 13:6 (1983), 4–23.
-
(1983)
Interfaces
, vol.13
, Issue.6
, pp. 4-23
-
-
Bell, W.J.1
Dalberto, L.M.2
Fisher, M.L.3
-
10
-
-
0036687522
-
Continuous and discrete shipping strategies for the single link problem
-
Bertazzi, L., Speranza, M.G., Continuous and discrete shipping strategies for the single link problem. Transp. Sci. 36:3 (2002), 314–325.
-
(2002)
Transp. Sci.
, vol.36
, Issue.3
, pp. 314-325
-
-
Bertazzi, L.1
Speranza, M.G.2
-
11
-
-
84873744862
-
A stochastic inventory routing problem with stock-out
-
Bertazzi, L., Bosco, A., Guerriero, F., Laganà, D., A stochastic inventory routing problem with stock-out. Transp. Res. Part C, 2011, 10.1016/j.trc.2011.06.003.
-
(2011)
Transp. Res. Part C
-
-
Bertazzi, L.1
Bosco, A.2
Guerriero, F.3
Laganà, D.4
-
12
-
-
84888074269
-
A multi-objective robust stochastic programming model for disaster relief logistics under uncertainty
-
Bozorgi-Amiri, A., Jabalameli, M.S., Mirzapour Al-e-hashem, S.M., A multi-objective robust stochastic programming model for disaster relief logistics under uncertainty. OR Spectr., 2011, 1–29.
-
(2011)
OR Spectr.
, pp. 1-29
-
-
Bozorgi-Amiri, A.1
Jabalameli, M.S.2
Mirzapour Al-e-hashem, S.M.3
-
13
-
-
10644237167
-
A decomposition approach for the inventory-routing problem
-
Campbell, A.M., Savelsbergh, M.W., A decomposition approach for the inventory-routing problem. Transp. Sci. 38:4 (2004), 488–502.
-
(2004)
Transp. Sci.
, vol.38
, Issue.4
, pp. 488-502
-
-
Campbell, A.M.1
Savelsbergh, M.W.2
-
14
-
-
84987819090
-
Multi-period inventory routing problem under carbon emission regulations
-
Cheng, C., Qi, M., Wang, X., Zhang, Y., Multi-period inventory routing problem under carbon emission regulations. Int. J. Prod. Econ. 182 (2016), 263–275.
-
(2016)
Int. J. Prod. Econ.
, vol.182
, pp. 263-275
-
-
Cheng, C.1
Qi, M.2
Wang, X.3
Zhang, Y.4
-
15
-
-
0001837441
-
An integrated inventory allocation and vehicle routing problem
-
Chien, T.W., Balakrishnan, A., Wong, R.T., An integrated inventory allocation and vehicle routing problem. Transp. Sci. 23:2 (1989), 67–76.
-
(1989)
Transp. Sci.
, vol.23
, Issue.2
, pp. 67-76
-
-
Chien, T.W.1
Balakrishnan, A.2
Wong, R.T.3
-
16
-
-
84992312724
-
A two-phase algorithm for the cyclic inventory routing problem
-
Chitsaz, M., Divsalar, A., Vansteenwegen, P., A two-phase algorithm for the cyclic inventory routing problem. Eur. J. Oper. Res. 254:2 (2016), 410–426.
-
(2016)
Eur. J. Oper. Res.
, vol.254
, Issue.2
, pp. 410-426
-
-
Chitsaz, M.1
Divsalar, A.2
Vansteenwegen, P.3
-
18
-
-
84894618216
-
Optimal joint replenishment, delivery and inventory management policies for perishable products
-
Coelho, Laporte, G., Optimal joint replenishment, delivery and inventory management policies for perishable products. Comput. Oper. Res. 47 (2014), 42–52.
-
(2014)
Comput. Oper. Res.
, vol.47
, pp. 42-52
-
-
Coelho1
Laporte, G.2
-
19
-
-
84859708266
-
The inventory-routing problem with transshipment
-
Coelho, L.C., Cordeau, J.F., Laporte, G., The inventory-routing problem with transshipment. Comput. Oper. Res. 39:11 (2012), 2537–2548.
-
(2012)
Comput. Oper. Res.
, vol.39
, Issue.11
, pp. 2537-2548
-
-
Coelho, L.C.1
Cordeau, J.F.2
Laporte, G.3
-
20
-
-
84893757981
-
Thirty years of inventory routing
-
Coelho, L.C., Cordeau, J.F., Laporte, G., Thirty years of inventory routing. Transp. Sci. 48:1 (2014), 1–19.
-
(2014)
Transp. Sci.
, vol.48
, Issue.1
, pp. 1-19
-
-
Coelho, L.C.1
Cordeau, J.F.2
Laporte, G.3
-
21
-
-
71949092423
-
Vehicle routing
-
C. Barnhart G. Laporte North-Holland Amsterdam
-
Cordeau, J.F., Laporte, G., Savelsbergh, M.W.P., Vigo, D., Vehicle routing. Barnhart, C., Laporte, G., (eds.) Transportation, 2007, North-Holland, Amsterdam, 367–428.
-
(2007)
Transportation
, pp. 367-428
-
-
Cordeau, J.F.1
Laporte, G.2
Savelsbergh, M.W.P.3
Vigo, D.4
-
22
-
-
0021489143
-
A combined vehicle routing and inventory allocation problem
-
Federgruen, A., Zipkin, P., A combined vehicle routing and inventory allocation problem. Oper. Res. 32:5 (1984), 1019–1037.
-
(1984)
Oper. Res.
, vol.32
, Issue.5
, pp. 1019-1037
-
-
Federgruen, A.1
Zipkin, P.2
-
23
-
-
0042807253
-
Managing demand uncertainty in supply chain planning
-
Gupta, A., Maranas, C.D., Managing demand uncertainty in supply chain planning. Comput. Chem. Eng. 27 (2003), 1219–1227.
-
(2003)
Comput. Chem. Eng.
, vol.27
, pp. 1219-1227
-
-
Gupta, A.1
Maranas, C.D.2
-
24
-
-
84896512003
-
A hybrid column generation approach for an industrial waste collection routing problem
-
Hauge, K., Larsen, J., Lusby, R.M., Krapper, E., A hybrid column generation approach for an industrial waste collection routing problem. Comput. Ind. Eng. 71 (2014), 10–20.
-
(2014)
Comput. Ind. Eng.
, vol.71
, pp. 10-20
-
-
Hauge, K.1
Larsen, J.2
Lusby, R.M.3
Krapper, E.4
-
25
-
-
77952672360
-
A modified ant colony optimization algorithm for multi-item inventory routing problems with demand uncertainty
-
Huang, S.H., Lin, P.C., A modified ant colony optimization algorithm for multi-item inventory routing problems with demand uncertainty. Transp. Res. Part E 46 (2010), 598–611.
-
(2010)
Transp. Res. Part E
, vol.46
, pp. 598-611
-
-
Huang, S.H.1
Lin, P.C.2
-
26
-
-
67649958525
-
Scenario tree-based heuristics for stochastic inventory-routing problems
-
Hvattum, L.M., Løkketangen, A., Laporte, G., Scenario tree-based heuristics for stochastic inventory-routing problems. Inf. J. Comput. 21:2 (2009), 268–285.
-
(2009)
Inf. J. Comput.
, vol.21
, Issue.2
, pp. 268-285
-
-
Hvattum, L.M.1
Løkketangen, A.2
Laporte, G.3
-
27
-
-
84977155286
-
The inventory-routing problem of returnable transport items with time windows and simultaneous pickup and delivery in closed-loop supply chains
-
Iassinovskaia, G., Limbourg, S., Riane, F., The inventory-routing problem of returnable transport items with time windows and simultaneous pickup and delivery in closed-loop supply chains. Int. J. Prod. Econ. 183:Part B (2017), 570–582.
-
(2017)
Int. J. Prod. Econ.
, vol.183
, pp. 570-582
-
-
Iassinovskaia, G.1
Limbourg, S.2
Riane, F.3
-
28
-
-
84883512980
-
Inventory routing problems in a context of vendor-managed inventory system with consignment stock and transshipment
-
Jemai, Z., Rekik, Y., Kalaï, R., Inventory routing problems in a context of vendor-managed inventory system with consignment stock and transshipment. Prod. Plan. Control Manag. Oper., 2012, 10.1080/09537287.2012.666844.
-
(2012)
Prod. Plan. Control Manag. Oper.
-
-
Jemai, Z.1
Rekik, Y.2
Kalaï, R.3
-
29
-
-
84894661626
-
Integrated inventory routing problem with quality time windows and loading cost for deteriorating items under discrete time
-
Jia, T., Li, X., Wang, N., Li, R., Integrated inventory routing problem with quality time windows and loading cost for deteriorating items under discrete time. Math. Probl. Eng., 2014, 1–14.
-
(2014)
Math. Probl. Eng.
, pp. 1-14
-
-
Jia, T.1
Li, X.2
Wang, N.3
Li, R.4
-
30
-
-
0003410673
-
Stochastic Programming
-
Wiley New York, NY
-
Kall, P., Wallace, S.W., Stochastic Programming. 1994, Wiley, New York, NY.
-
(1994)
-
-
Kall, P.1
Wallace, S.W.2
-
31
-
-
0036474928
-
The stochastic inventory routing problem with direct deliveries
-
Kleywegt, A.J., Nori, V.S., Savelsbergh, M.W.P., The stochastic inventory routing problem with direct deliveries. Transp. Sci. 36:1 (2002), 94–118.
-
(2002)
Transp. Sci.
, vol.36
, Issue.1
, pp. 94-118
-
-
Kleywegt, A.J.1
Nori, V.S.2
Savelsbergh, M.W.P.3
-
32
-
-
1642324107
-
Dynamic programming approximations for a stochastic inventory routing problem
-
Kleywegt, A.J., Nori, V.S., Savelsbergh, M.W.P., Dynamic programming approximations for a stochastic inventory routing problem. Transp. Sci. 38:1 (2004), 42–70.
-
(2004)
Transp. Sci.
, vol.38
, Issue.1
, pp. 42-70
-
-
Kleywegt, A.J.1
Nori, V.S.2
Savelsbergh, M.W.P.3
-
33
-
-
79958019501
-
A heuristic method for the inventory routing problem with time windows
-
Liu, S.C., Lee, W.T., A heuristic method for the inventory routing problem with time windows. Expert Syst. Appl. 38 (2011), 13223–13231.
-
(2011)
Expert Syst. Appl.
, vol.38
, pp. 13223-13231
-
-
Liu, S.C.1
Lee, W.T.2
-
34
-
-
85053831992
-
L-shaped Method for Two-stage Stochastic Programs with Recourse. Encyclopedia of Optimization
-
second ed.
-
Louveaux, F., Birge, J.R., L-shaped Method for Two-stage Stochastic Programs with Recourse. Encyclopedia of Optimization. second ed., 2009, 1943–1945.
-
(2009)
, pp. 1943-1945
-
-
Louveaux, F.1
Birge, J.R.2
-
35
-
-
84930664898
-
Considering lost sale in inventory routing problems for perishable goods
-
Mirzaei, S., Seifi, A., Considering lost sale in inventory routing problems for perishable goods. Comput. Ind. Eng. 87 (2015), 213–227.
-
(2015)
Comput. Ind. Eng.
, vol.87
, pp. 213-227
-
-
Mirzaei, S.1
Seifi, A.2
-
36
-
-
84922626709
-
Multi-product multi-period Inventory Routing Problem with a transshipment option: a green approach
-
Mirzapour Al-e-hashem, S.M.J., Rekik, Y., Multi-product multi-period Inventory Routing Problem with a transshipment option: a green approach. Int. J. Prod. Econ. 157 (2014), 80–88.
-
(2014)
Int. J. Prod. Econ.
, vol.157
, pp. 80-88
-
-
Mirzapour Al-e-hashem, S.M.J.1
Rekik, Y.2
-
37
-
-
80052344196
-
A multi objective robust aggregate production planning in a supply chain under uncertainty
-
Mirzapour Al-e-hashem, S.M.J., Malekli, H., Aryanezhad, M.B., A multi objective robust aggregate production planning in a supply chain under uncertainty. Int. J. Prod. Econ. 134:1 (2011), 28–42.
-
(2011)
Int. J. Prod. Econ.
, vol.134
, Issue.1
, pp. 28-42
-
-
Mirzapour Al-e-hashem, S.M.J.1
Malekli, H.2
Aryanezhad, M.B.3
-
38
-
-
84856009605
-
An efficient algorithm to solve a multi-objective robust aggregate production planning in an uncertain environment
-
Mirzapour Al-e-hashem, S.M.J., Aryanezhad, M.B., Sadjadi, S.J., An efficient algorithm to solve a multi-objective robust aggregate production planning in an uncertain environment. Int. J. Adv. Manuf. Technol. 58:5–8 (2012), 765–782.
-
(2012)
Int. J. Adv. Manuf. Technol.
, vol.58
, Issue.5-8
, pp. 765-782
-
-
Mirzapour Al-e-hashem, S.M.J.1
Aryanezhad, M.B.2
Sadjadi, S.J.3
-
39
-
-
84878011463
-
A stochastic aggregate production planning model in a green supply chain: considering flexible lead times, nonlinear purchase and shortage cost functions
-
Mirzapour Al-e-hashem, S.M.J., Baboli, A., Sazvar, Z., A stochastic aggregate production planning model in a green supply chain: considering flexible lead times, nonlinear purchase and shortage cost functions. Eur. J. Oper. Res. 230:1 (2013), 26–41.
-
(2013)
Eur. J. Oper. Res.
, vol.230
, Issue.1
, pp. 26-41
-
-
Mirzapour Al-e-hashem, S.M.J.1
Baboli, A.2
Sazvar, Z.3
-
40
-
-
2342488080
-
Retailer- vs. vendor-managed inventory and brand competition
-
Mishra, B.K., Raghunathan, S., Retailer- vs. vendor-managed inventory and brand competition. Manag. Sci. 50:4 (2004), 445–457.
-
(2004)
Manag. Sci.
, vol.50
, Issue.4
, pp. 445-457
-
-
Mishra, B.K.1
Raghunathan, S.2
-
41
-
-
79958186123
-
An efficient hybrid genetic algorithm for the multi-product multi-period inventory routing problem
-
Moin, N.H., Salhi, S., Aziz, N.A.B., An efficient hybrid genetic algorithm for the multi-product multi-period inventory routing problem. Int. J. Prod. Econ. 133 (2011), 334–343.
-
(2011)
Int. J. Prod. Econ.
, vol.133
, pp. 334-343
-
-
Moin, N.H.1
Salhi, S.2
Aziz, N.A.B.3
-
42
-
-
79960106247
-
Heuristics in the multi-location inventory system with transshipments
-
H. Kotzab S. Seuring M. Muller & G Reiner Physica-Verlag Heidelberg
-
Nonas, L.M., Jornsten, K., Heuristics in the multi-location inventory system with transshipments. Kotzab, H., Seuring, S., Muller, M., & G Reiner, (eds.) Research Methodologies in Supply Chains Management, 2005, Physica-Verlag, Heidelberg, 509–524.
-
(2005)
Research Methodologies in Supply Chains Management
, pp. 509-524
-
-
Nonas, L.M.1
Jornsten, K.2
-
43
-
-
33846818473
-
Optimal solution in the multi-location inventory system with transshipments
-
Nonas, L.M., Jornsten, K., Optimal solution in the multi-location inventory system with transshipments. J. Math. Model. Algorithm. 6:1 (2007), 47–75.
-
(2007)
J. Math. Model. Algorithm.
, vol.6
, Issue.1
, pp. 47-75
-
-
Nonas, L.M.1
Jornsten, K.2
-
44
-
-
10444251832
-
Shipment planning at oil refineries using column generation and valid inequalities
-
Persson, J.A., Gothe-Lundgren, M., Shipment planning at oil refineries using column generation and valid inequalities. Eur. J. Oper. Res. 163:3 (2005), 631–652.
-
(2005)
Eur. J. Oper. Res.
, vol.163
, Issue.3
, pp. 631-652
-
-
Persson, J.A.1
Gothe-Lundgren, M.2
-
45
-
-
84890554826
-
Mixed integer linear programming model for multi-commodity multi-depot inventory routing problem
-
Ramkumar, N., Subramanian, P., Narendran, T.T., Ganesh, K., Mixed integer linear programming model for multi-commodity multi-depot inventory routing problem. OPSEARCH 49, 2012, 413–429.
-
(2012)
OPSEARCH 49
, pp. 413-429
-
-
Ramkumar, N.1
Subramanian, P.2
Narendran, T.T.3
Ganesh, K.4
-
46
-
-
1942500445
-
Optimization under uncertainty: state-of-the-art and opportunities
-
Sahinidis, N.V., Optimization under uncertainty: state-of-the-art and opportunities. Comput. Chem. Eng. 28:6–7 (2004), 971–983.
-
(2004)
Comput. Chem. Eng.
, vol.28
, Issue.6-7
, pp. 971-983
-
-
Sahinidis, N.V.1
-
47
-
-
84896825749
-
A bi-objective stochastic programming model for a centralized green supply chain with deteriorating products
-
Sazvar, Z., Mirzapour Al-e-hashem, S.M.J., Baboli, A., Akbari-Jokar, M.R., A bi-objective stochastic programming model for a centralized green supply chain with deteriorating products. Int. J. Prod. Econ. 150 (2014), 140–154.
-
(2014)
Int. J. Prod. Econ.
, vol.150
, pp. 140-154
-
-
Sazvar, Z.1
Mirzapour Al-e-hashem, S.M.J.2
Baboli, A.3
Akbari-Jokar, M.R.4
-
48
-
-
84975221150
-
A novel mathematical model for a multi-period, multi-product optimal ordering problem considering expiry dates in a FEFO system
-
Sazvar, Z., Mirzapour Al-e-hashem, S.M.J., Govindan, K., Bahli, B., A novel mathematical model for a multi-period, multi-product optimal ordering problem considering expiry dates in a FEFO system. Trans. Res. Part E: Logist. Trans. Rev. 93 (2016), 232–261.
-
(2016)
Trans. Res. Part E: Logist. Trans. Rev.
, vol.93
, pp. 232-261
-
-
Sazvar, Z.1
Mirzapour Al-e-hashem, S.M.J.2
Govindan, K.3
Bahli, B.4
-
49
-
-
0000279922
-
A theory of rolling horizon decision making
-
Sethi, S., Sorger, G., A theory of rolling horizon decision making. Ann. Oper. Res. 29:1 (1991), 387–415.
-
(1991)
Ann. Oper. Res.
, vol.29
, Issue.1
, pp. 387-415
-
-
Sethi, S.1
Sorger, G.2
-
50
-
-
80051474274
-
A Lagrangian relaxation approach for a multi-mode inventory routing problem with transshipment in crude oil transportation
-
Shen, Q., Chu, F., Chen, H., A Lagrangian relaxation approach for a multi-mode inventory routing problem with transshipment in crude oil transportation. Comput. Chem. Eng. 35 (2011), 2113–2123.
-
(2011)
Comput. Chem. Eng.
, vol.35
, pp. 2113-2123
-
-
Shen, Q.1
Chu, F.2
Chen, H.3
-
51
-
-
84870297386
-
Genetic-algorithms-based algorithm portfolio for inventory routing problem with stochastic demand
-
Shukla, N., Tiwari, M.K., Ceglarek, D., Genetic-algorithms-based algorithm portfolio for inventory routing problem with stochastic demand. Int. J. Prod. Res. 51:1 (2013), 118–137.
-
(2013)
Int. J. Prod. Res.
, vol.51
, Issue.1
, pp. 118-137
-
-
Shukla, N.1
Tiwari, M.K.2
Ceglarek, D.3
-
52
-
-
21844457118
-
An integrated inventory-routing system for multi-item joint replenishment with limited vehicle capacity
-
Sindhuchao, S., Romeijn, H.E., Akcali, E., Boondiskulchok, R., An integrated inventory-routing system for multi-item joint replenishment with limited vehicle capacity. J. Glob. Optim. 32 (2005), 93–118.
-
(2005)
J. Glob. Optim.
, vol.32
, pp. 93-118
-
-
Sindhuchao, S.1
Romeijn, H.E.2
Akcali, E.3
Boondiskulchok, R.4
-
53
-
-
84866371094
-
Robust inventory routing under demand uncertainty
-
Solyalı, O., Cordeau, J.F., Laporte, G., Robust inventory routing under demand uncertainty. Transp. Sci. 46:3 (2012), 327–340.
-
(2012)
Transp. Sci.
, vol.46
, Issue.3
, pp. 327-340
-
-
Solyalı, O.1
Cordeau, J.F.2
Laporte, G.3
-
54
-
-
84980383363
-
Closed-loop inventory routing problem for returnable transport items
-
Soysal, M., Closed-loop inventory routing problem for returnable transport items. Transp. Res. Part D Transp. Environ. 48 (2016), 31–45.
-
(2016)
Transp. Res. Part D Transp. Environ.
, vol.48
, pp. 31-45
-
-
Soysal, M.1
-
55
-
-
84927933256
-
Modeling an Inventory Routing Problem for perishable products with environmental considerations and demand uncertainty
-
Soysal, M., Bloemhof-Ruwaard, J.M., Haijema, R., van der Vorst, J.G.A.J., Modeling an Inventory Routing Problem for perishable products with environmental considerations and demand uncertainty. Int. J. Prod. Econ. 164 (2015), 118–133.
-
(2015)
Int. J. Prod. Econ.
, vol.164
, pp. 118-133
-
-
Soysal, M.1
Bloemhof-Ruwaard, J.M.2
Haijema, R.3
van der Vorst, J.G.A.J.4
-
56
-
-
85030552965
-
Modeling a green inventory routing problem for perishable products with horizontal collaboration
-
(in press)
-
Soysal, M., Bloemhof-Ruwaard, J.M., Haijema, R., van der Vorst, J.G., Modeling a green inventory routing problem for perishable products with horizontal collaboration. Comput. Oper. Res., 2016 (in press).
-
(2016)
Comput. Oper. Res.
-
-
Soysal, M.1
Bloemhof-Ruwaard, J.M.2
Haijema, R.3
van der Vorst, J.G.4
-
57
-
-
0028512269
-
Minimizing transportation and inventory costs for several products on a single link
-
Speranza, M.G., Ukovich, W., Minimizing transportation and inventory costs for several products on a single link. Oper. Res. 42:5 (1994), 879–894.
-
(1994)
Oper. Res.
, vol.42
, Issue.5
, pp. 879-894
-
-
Speranza, M.G.1
Ukovich, W.2
-
58
-
-
40849140755
-
A new model and hybrid approach for large scale inventory routing problems
-
Yu, Y., Chen, H., Chu, F., A new model and hybrid approach for large scale inventory routing problems. Eur. J. Oper. Res. 189:3 (2008), 1022–1040.
-
(2008)
Eur. J. Oper. Res.
, vol.189
, Issue.3
, pp. 1022-1040
-
-
Yu, Y.1
Chen, H.2
Chu, F.3
|