Volumn , Issue , 2005, Pages 165-193

ACKNOWLEDGING VARIABILITY AND UNCERTAINTY IN PRODUCT AND PROCESS DEVELOPMENT

Author keywords

4D modeling; AEC; concurrent engineering; design; integrated product and process development; interdependence; lean construction; production planning; set based design; simulation; supply chain management; uncertainty

Indexed keywords


EID: 85019932632     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.1201/9780203971123-11     Document Type: Chapter
Times cited : (5)

References (97)
  • 3
    • 0021466185 scopus 로고
    • Towards a general theory of action and time
    • Allen, J.F. 1984. Towards a general theory of action and time. Artificial Intelligence 23: 123-154.
    • (1984) Artificial Intelligence , vol.23 , pp. 123-154
    • Allen, J.F.1
  • 6
    • 16444369261 scopus 로고
    • Knowledge Systems Laboratory Report Nr. KSL-85-5, Stanford University
    • Clancey, W.J. 1985. Heuristic classification: 68 pp. Knowledge Systems Laboratory Report Nr. KSL-85-5, Stanford University.
    • (1985) Heuristic classification , pp. 68
    • Clancey, W.J.1
  • 9
    • 0040885767 scopus 로고
    • Ph.D. Dissertation, Department of Civil and Environmental Engineering, University of Michigan, Ann Arbor, MI, September, also. UMCEE 95-22
    • Dzeng, R.-J. 1995. CasePlan: a case-based planner and scheduler for construction using product modeling. Ph.D. Dissertation, Department of Civil and Environmental Engineering, University of Michigan, Ann Arbor, MI, September, 300 pp. (also Report No. UMCEE 95-22).
    • (1995) CasePlan: A case-based planner and scheduler for construction using product modeling , pp. 300
    • Dzeng, R.-J.1
  • 12
    • 85160499261 scopus 로고    scopus 로고
    • Integrated product-process development model to support design-build
    • M. Hannus, M. Salonen and A.S. Kazi (eds), CIB Publication 236. Proceedings of the 2nd international conference on concurrent engineering in construction (CEC 99), Espoo, Finland, 25-27 August. Organized by CIB TG33 and VTT Building Technology
    • Gil, N., Tommelein, I.D., Miles, R.S., Ballard, G. and Kirkendall, R.L. 1999. Integrated product-process development model to support design-build. In M. Hannus, M. Salonen and A.S. Kazi (eds), Concurrent engineering in construction: challenges for the new millenium: 367-376. CIB Publication 236. Proceedings of the 2nd international conference on concurrent engineering in construction (CEC 99), Espoo, Finland, 25-27 August. Organized by CIB TG33 and VTT Building Technology.
    • (1999) Concurrent engineering in construction: Challenges for the new millenium , pp. 367-376
    • Gil, N.1    Tommelein, I.D.2    Miles, R.S.3    Ballard, G.4    Kirkendall, R.L.5
  • 13
    • 0027667979 scopus 로고
    • Process-based research to meet the international challenge
    • ASCE
    • Halpin, D.W. 1993. Process-based research to meet the international challenge. Journal of Construction Engineering and Management 119(3): 417-425. ASCE.
    • (1993) Journal of Construction Engineering and Management , vol.119 , Issue.3 , pp. 417-425
    • Halpin, D.W.1
  • 17
    • 0022093837 scopus 로고
    • A blackboard architecture for control
    • Hayes-Roth, B. 1985. A blackboard architecture for control. Artificial Intelligence 26: 251-321.
    • (1985) Artificial Intelligence , vol.26 , pp. 251-321
    • Hayes-Roth, B.1
  • 19
    • 84885624034 scopus 로고    scopus 로고
    • Stanford University, CA, April
    • Knowledge Systems Lab., Computer Science Department, Stanford University, CA, April.
    • Computer Science Department
  • 24
    • 58849153480 scopus 로고    scopus 로고
    • Re-engineering, concurrent engineering, lean production: What is the ideal antidote for the construction industry’s ailments?
    • S. Mohamed (ed.), Gold Coast, Griffith University, QLD, Australia, 14-15 July
    • Koskela, L. 1997. Re-engineering, concurrent engineering, lean production: what is the ideal antidote for the construction industry’s ailments? In S. Mohamed (ed.), Proceedings of the international conference on construction process re-engineering, Gold Coast, Griffith University, QLD, Australia, 14-15 July: 293-301.
    • (1997) Proceedings of the international conference on construction process re-engineering , pp. 293-301
    • Koskela, L.1
  • 25
    • 0002076415 scopus 로고    scopus 로고
    • On foundations of concurrent engineering
    • C. Anumba, and N. Evbuomwan (eds), Paper presented at, London, 3-4 July, London: The Institute of Structural Engineers
    • Koskela, L. and Huovila, P. 1997. On foundations of concurrent engineering. In C. Anumba, and N. Evbuomwan (eds), Paper presented at Concurrent engineering in construction CEC 97; 1st international conference, London, 3-4 July: 22-32. London: The Institute of Structural Engineers.
    • (1997) Concurrent engineering in construction CEC 97; 1st international conference , pp. 22-32
    • Koskela, L.1    Huovila, P.2
  • 28
    • 85160469486 scopus 로고
    • Foreword
    • I.D. Tommelein (ed.), Expert Systems and Artificial Intelligence Committee, Technical Council on Computer Practices. ASCE
    • Levitt, R.E. 1995. Foreword. In I.D. Tommelein (ed.), Expert systems for civil engineers: integration issues: 247 pp. Expert Systems and Artificial Intelligence Committee, Technical Council on Computer Practices. ASCE.
    • (1995) Expert systems for civil engineers: Integration issues , pp. 247
    • Levitt, R.E.1
  • 29
    • 0002068657 scopus 로고
    • Using knowledge of construction and project management for automated schedule updating
    • December
    • Levitt, R.E. and Kunz, J.C. 1985. Using knowledge of construction and project management for automated schedule updating. Project Management Journal 16(5), December.
    • (1985) Project Management Journal , vol.16 , Issue.5
    • Levitt, R.E.1    Kunz, J.C.2
  • 31
    • 0004007948 scopus 로고    scopus 로고
    • Ph.D. Dissertation, Civil and Environmental Engineering, University of Michigan, Ann Arbor, MI
    • Martinez, J.C. 1996. STROBOSCOPE state and resource based simulation of construction processes. Ph.D. Dissertation, Civil and Environmental Engineering, University of Michigan, Ann Arbor, MI, 518 pp., available at http://www.strobos.ce.vt.edu/
    • (1996) STROBOSCOPE state and resource based simulation of construction processes , pp. 518
    • Martinez, J.C.1
  • 32
    • 0002687270 scopus 로고
    • Towards a generic model of configuration tasks
    • August
    • Mittal, S. and Frayman, F. 1989. Towards a generic model of configuration tasks. Proceedings of the 11th IJCAI, August: 1395-1401.
    • (1989) Proceedings of the 11th IJCAI , pp. 1395-1401
    • Mittal, S.1    Frayman, F.2
  • 33
    • 0022735890 scopus 로고
    • Blackboard systems: The blackboard model of problem solving and the evolution of blackboard architectures
    • Nii, H.P. 1986a. Blackboard systems: the blackboard model of problem solving and the evolution of blackboard architectures. AI Magazine 7(2): 38-53.
    • (1986) AI Magazine , vol.7 , Issue.2 , pp. 38-53
    • Nii, H.P.1
  • 34
    • 0022881050 scopus 로고
    • Blackboard systems: Blackboard application systems, blackboard systems from a knowledge engineering perspective
    • Nii, H.P. (1986b). Blackboard systems: blackboard application systems, blackboard systems from a knowledge engineering perspective. AI Magazine 7(3): 82-106.
    • (1986) AI Magazine , vol.7 , Issue.3 , pp. 82-106
    • Nii, H.P.1
  • 36
    • 85160474783 scopus 로고    scopus 로고
    • Revit. 2001. www.revit.com
    • (2001) Revit
  • 37
    • 0031629966 scopus 로고    scopus 로고
    • The LAST DESIGNER’S database-CAD for sourcing, procurement, and planning
    • ASCE
    • Sadonio, M., Tommelein, I.D. and Zabelle, T.R. 1998. The LAST DESIGNER’S database-CAD for sourcing, procurement, and planning. Proceedings of the Computing Congress 98: 364-377. ASCE.
    • (1998) Proceedings of the Computing Congress , vol.98 , pp. 364-377
    • Sadonio, M.1    Tommelein, I.D.2    Zabelle, T.R.3
  • 39
    • 0024640820 scopus 로고
    • AI-based design versus geometry-based design or why design cannot be supported by geometry alone
    • Smithers, T. 1989. AI-based design versus geometry-based design or why design cannot be supported by geometry alone. Computer-Aided Design 21(3): 141-150.
    • (1989) Computer-Aided Design , vol.21 , Issue.3 , pp. 141-150
    • Smithers, T.1
  • 40
    • 0001817489 scopus 로고    scopus 로고
    • Toyota’s principles of set-based concurrent engineering
    • Winter
    • Sobeck, D.K., II, Ward, A.C. and Liker, J.K. 1999. Toyota’s principles of set-based concurrent engineering. Sloan Management Review Winter: 40(2): 67-88.
    • (1999) Sloan Management Review , vol.40 , Issue.2 , pp. 67-88
    • Sobeck, D.K.1    Ward, A.C.2    Liker, J.K.3
  • 44
    • 0342778695 scopus 로고
    • Expert Systems and Artificial Intelligence Committee, Technical Council on Computer Practices, ASCE
    • Tommelein, I.D. (ed.) 1995a. Expert systems for civil engineers: integration issues: 247 pp. Expert Systems and Artificial Intelligence Committee, Technical Council on Computer Practices, ASCE.
    • (1995) Expert systems for civil engineers: Integration issues , pp. 247
    • Tommelein, I.D.1
  • 46
    • 0000012732 scopus 로고    scopus 로고
    • Pull-driven scheduling for pipe-spool installation: Simulation of a lean construction technique
    • ASCE
    • Tommelein, I.D. 1998. Pull-driven scheduling for pipe-spool installation: simulation of a lean construction technique. Journal of Construction Engineering and Management 124(4): 279-288. ASCE.
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.D.1
  • 54
    • 0002533915 scopus 로고
    • The second toyota paradox: How delaying decisions can make better cars faster
    • Ward, A.C., Liker, J.K., Cristiano, J.J. and Sobeck, D.K., II. 1995. The second toyota paradox: how delaying decisions can make better cars faster. Sloan Management Review Spring: 43-61.
    • (1995) Sloan Management Review , vol.Spring , pp. 43-61
    • Ward, A.C.1    Liker, J.K.2    Cristiano, J.J.3    Sobeck, D.K.4
  • 55
    • 0013115080 scopus 로고    scopus 로고
    • Rotterdam: A.A. Balkema
    • Alarcon, L. (ed.) 1997. Lean construction: 497 pp. Rotterdam: A.A. Balkema.
    • (1997) Lean construction , pp. 497
    • Alarcon, L.1
  • 61
    • 0027609612 scopus 로고
    • Placement-oriented design and delivery of concrete reinforcement
    • ASCE
    • Bernold, L.E. and Salim, Md. 1993. Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management 119(2): 323-335. ASCE.
    • (1993) Journal of Construction Engineering and Management , vol.119 , Issue.2 , pp. 323-335
    • Bernold, L.E.1    Salim, M.2
  • 64
    • 3042671955 scopus 로고    scopus 로고
    • Technical Report 99-1, Construction Engineering and Management Program, Civil and Environmental Engineering Department, University of California, Berkeley, September
    • Choo, H.J. and Tommelein, I.D. 1999. Parade of trades: a computer game for understanding variability and dependence. Technical Report 99-1, Construction Engineering and Management Program, Civil and Environmental Engineering Department, University of California, Berkeley, September, available at http://www.ce.berkeley.edu/_tommelein/parade/parade.pdf
    • (1999) Parade of trades: A computer game for understanding variability and dependence
    • Choo, H.J.1    Tommelein, I.D.2
  • 65
    • 85160469931 scopus 로고    scopus 로고
    • Interactive coordination of distributed work plans
    • Orlando, Florida, 20-22 February, in press
    • Choo, H.J. and Tommelein, I.D. 2000. Interactive coordination of distributed work plans. ASCE, Proceedings of the construction congress VI, Orlando, Florida, 20-22 February: 10 pp. (in press).
    • (2000) ASCE, Proceedings of the construction congress VI , pp. 10
    • Choo, H.J.1    Tommelein, I.D.2
  • 66
    • 85160507605 scopus 로고    scopus 로고
    • The Collaborative Process Institute
    • CPI. 1998. Collaboration in the building process. The Collaborative Process Institute, http://www.dprinc.com/collabor.html
    • (1998) Collaboration in the building process
  • 67
    • 85160471012 scopus 로고    scopus 로고
    • Tomorrow’s internet
    • November 13
    • The Economist 1999. Tomorrow’s internet. The Economist November 13: 23-26.
    • (1999) The Economist , pp. 23-26
  • 68
    • 85001874186 scopus 로고    scopus 로고
    • Importance of data exchange standards for process industry. Editorial
    • ASCE
    • Edlinger, P. 1997. Importance of data exchange standards for process industry. Editorial. Journal of Computer and Civil Engineering January: 6-7. ASCE.
    • (1997) Journal of Computer and Civil Engineering , vol.January , pp. 6-7
    • Edlinger, P.1
  • 70
    • 0030196033 scopus 로고    scopus 로고
    • Examples and characteristics of shared project models
    • ASCE
    • Fischer, M. and Froese, T. 1996. Examples and characteristics of shared project models. Journal of Computer and Civil Engineering 10(3): 174-182. ASCE.
    • (1996) Journal of Computer and Civil Engineering , vol.10 , Issue.3 , pp. 174-182
    • Fischer, M.1    Froese, T.2
  • 72
    • 0004244246 scopus 로고
    • Croton-on-Hudson, NY: North River Press
    • Goldratt, E.M. and Cox, J. 1986. The goal. Croton-on-Hudson, NY: North River Press.
    • (1986) The goal
    • Goldratt, E.M.1    Cox, J.2
  • 73
    • 0001167750 scopus 로고
    • Reengineering work: Don’t automate, obliterate
    • Hammer, M. 1990. Reengineering work: don’t automate, obliterate. Harvard Business Review July-August: 104-112.
    • (1990) Harvard Business Review , vol.July-August , pp. 104-112
    • Hammer, M.1
  • 74
    • 0000676522 scopus 로고    scopus 로고
    • The virtual design team: A computational model of project organizations
    • Jin, Y. and Levitt, R.E. 1996. The virtual design team: a computational model of project organizations. Computational and Mathematical Organization Theory 2(3): 171-196.
    • (1996) Computational and Mathematical Organization Theory , vol.2 , Issue.3 , pp. 171-196
    • Jin, Y.1    Levitt, R.E.2
  • 75
    • 0000504207 scopus 로고    scopus 로고
    • An interactive planning environment for critical operations
    • ASCE
    • Lin, K.-L. and Haas, C.T. 1996. An interactive planning environment for critical operations. Journal of Construction Engineering Management 122(3): 212-222. ASCE.
    • (1996) Journal of Construction Engineering Management , vol.122 , Issue.3 , pp. 212-222
    • Lin, K.-L.1    Haas, C.T.2
  • 78
    • 0004197745 scopus 로고
    • 2nd edition. Annandale, VA: Wolverine Software Corp
    • Proof. 1995. Using proof animation, 2nd edition. Annandale, VA: Wolverine Software Corp.
    • (1995) Using proof animation
    • Proof1
  • 79
    • 0005390052 scopus 로고
    • Ph.D. Dissertation, Department of Architectural Engineering, Pennsylvania State University, University Park, PA
    • Riley, D.R. 1994. Modeling the space behavior of construction activities. Ph.D. Dissertation, Department of Architectural Engineering, Pennsylvania State University, University Park, PA, 296 pp.
    • (1994) Modeling the space behavior of construction activities , pp. 296
    • Riley, D.R.1
  • 81
    • 0031362303 scopus 로고    scopus 로고
    • Space planning for mechanical, electrical, plumbing, and fire protection trades in multi-story building construction
    • S. Anderson (ed.), Minneapolis, MN, ASCE
    • Riley, D. and Sanvido, V. 1997. Space planning for mechanical, electrical, plumbing, and fire protection trades in multi-story building construction. In S. Anderson (ed.), Proceedings of the construction congress V, Minneapolis, MN: 102-109. ASCE.
    • (1997) Proceedings of the construction congress V , pp. 102-109
    • Riley, D.1    Sanvido, V.2
  • 85
    • 0001598423 scopus 로고    scopus 로고
    • The real problem with computers
    • Schrage, M. 1997. The real problem with computers. Harvard Business Review September-October: 178-188.
    • (1997) Harvard Business Review , vol.September-October , pp. 178-188
    • Schrage, M.1
  • 87
    • 0030195306 scopus 로고    scopus 로고
    • Object-oriented model for integrating construction product and process information
    • ASCE
    • Stumpf, A.L., Ganeshan, R., Chin, S. and Liu, L. 1996. Object-oriented model for integrating construction product and process information. Journal of Computer and Civil Engineering 10(3): 204-212. ASCE.
    • (1996) Journal of Computer and Civil Engineering , vol.10 , Issue.3 , pp. 204-212
    • Stumpf, A.L.1    Ganeshan, R.2    Chin, S.3    Liu, L.4
  • 89
    • 0006802258 scopus 로고    scopus 로고
    • Technical, Construction Engineering and Management Programme, Civil and Environmental Engineering Department, University of California, Berkeley, CA. Also in Proceedings of the 2nd international seminar on lean construction, Sao Paulo, Brazil, 20-21 October. Organized by A.S.I. Conte, Logical Systems, Sao Paulo, Brazil
    • Tommelein, I.D. and Ballard, G. 1997a. Coordinating specialists. Technical Report No. 97-8, Construction Engineering and Management Programme, Civil and Environmental Engineering Department, University of California, Berkeley, CA. Also in Proceedings of the 2nd international seminar on lean construction, Sao Paulo, Brazil, 20-21 October. Organized by A.S.I. Conte, Logical Systems, Sao Paulo, Brazil.
    • (1997) Coordinating specialists , pp. 97-98
    • Tommelein, I.D.1    Ballard, G.2
  • 90
    • 85160487634 scopus 로고    scopus 로고
    • Technical, Construction Engineering and Management Programme, Civil and Environmental Engineering Department, University of California, Berkeley, CA. Also in Proceedings of the 2nd international seminar on lean construction, Sao Paulo, Brazil, 20-21 October. Organized by A.S.I. Conte, Logical Systems, Sao Paulo, Brazil
    • Tommelein, I.D. and Ballard, G. 1997b. Lookahead planning: screening and pulling. Technical Report No. 97-9, Construction Engineering and Management Programme, Civil and Environmental Engineering Department, University of California, Berkeley, CA. Also in Proceedings of the 2nd international seminar on lean construction, Sao Paulo, Brazil, 20-21 October. Organized by A.S.I. Conte, Logical Systems, Sao Paulo, Brazil.
    • (1997) Lookahead planning: Screening and pulling , pp. 97-99
    • Tommelein, I.D.1    Ballard, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.