-
1
-
-
13544262325
-
Genetic local search for multi-objective flow shop scheduling problems
-
Arroyo, J.E.C. and Armentano, V.A., 2005. Genetic local search for multi-objective flow shop scheduling problems. European Journal of Operational Research, 167 (3), 717-738.
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.3
, pp. 717-738
-
-
Arroyo, J.E.C.1
Armentano, V.A.2
-
3
-
-
67349094635
-
A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic
-
Behnamian, J., Fatemi Ghomi, S.M.T., and Zandieh, M., 2009. A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic. Expert Systems with Applications, 36 (8), 11057-11069.
-
(2009)
Expert Systems with Applications
, vol.36
, Issue.8
, pp. 11057-11069
-
-
Behnamian, J.1
Fatemi Ghomi, S.M.T.2
Zandieh, M.3
-
4
-
-
56349119327
-
A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness
-
Braglia, M. and Grassi, A., 2009. A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness. International Journal of Production Research, 47 (1), 273-288.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.1
, pp. 273-288
-
-
Braglia, M.1
Grassi, A.2
-
5
-
-
24144460572
-
Two-phase sub population genetic algorithm for parallel machine-scheduling problem
-
Chang, P.-C., Chen, S.H., and Lin, K.L., 2005. Two-phase sub population genetic algorithm for parallel machine-scheduling problem. Expert Systems with Applications, 29 (3), 705-712.
-
(2005)
Expert Systems with Applications
, vol.29
, Issue.3
, pp. 705-712
-
-
Chang, P.-C.1
Chen, S.H.2
Lin, K.L.3
-
6
-
-
33750351559
-
A global archive sub-population genetic algorithm with adaptive strategy in multi-objective parallel-machine scheduling problem
-
Berlin: Springer, [Proceedings of the second international conference on advances in natural computation, ICNC 2006 part I, 24-28 September Xi’an, China]
-
Chang, P.-C., Chen, S.-H. and Hsieh, J.-C., 2006. A global archive sub-population genetic algorithm with adaptive strategy in multi-objective parallel-machine scheduling problem. In: Advances in natural computation (LNCS) 4221/2006. Berlin: Springer, 730-739. [Proceedings of the second international conference on advances in natural computation, ICNC 2006 part I, 24-28 September Xi’an, China].
-
(2006)
Advances in Natural Computation (LNCS) 4221/2006
, pp. 730-739
-
-
Chang, P.-C.1
Chen, S.-H.2
Hsieh, J.-C.3
-
7
-
-
0037410718
-
A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines
-
Cochran, J.K., Horng, S., and Fowler, J.W., 2003. A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Computers and Operations Research, 30 (7), 1087-1102.
-
(2003)
Computers and Operations Research
, vol.30
, Issue.7
, pp. 1087-1102
-
-
Cochran, J.K.1
Horng, S.2
Fowler, J.W.3
-
8
-
-
84947923627
-
The Pareto envelope based selection algorithm for multi-objective optimization
-
Corne, D.W., Knowles, J.D. and Oates, M.J., 2000. The Pareto envelope based selection algorithm for multi-objective optimization. In: Proceedings of the parallel problem solving from nature VI conference, Springer Lecture Notes in Computer Science, Volume 1917/2000, 839-848.
-
(2000)
Proceedings of the Parallel Problem Solving from Nature VI Conference, Springer Lecture Notes in Computer Science
, vol.1917-2000
, pp. 839-848
-
-
Corne, D.W.1
Knowles, J.D.2
Oates, M.J.3
-
9
-
-
0005871804
-
PESA-II: Region-based selection in evolutionary multiobjective optimization
-
San Francisco, CA: Morgan Kaufmann
-
Corne, D.W., et al., 2001. PESA-II: region-based selection in evolutionary multiobjective optimization. In: Proceedings of the genetic and evolutionary computation conference, (GECCO-2001). San Francisco, CA: Morgan Kaufmann, 283-290.
-
(2001)
Proceedings of the Genetic and Evolutionary Computation Conference, (GECCO-2001)
, pp. 283-290
-
-
Corne, D.W.1
-
10
-
-
0036530772
-
A fast and elitist multi-objective genetic algorithm: NSGA II
-
Deb, K., et al., 2002. A fast and elitist multi-objective genetic algorithm: NSGA II. IEEE Transaction on Evolutionary Computation, 6 (2), 182-197.
-
(2002)
IEEE Transaction on Evolutionary Computation
, vol.6
, Issue.2
, pp. 182-197
-
-
Deb, K.1
-
11
-
-
0017240964
-
A dual algorithm for the one-machine scheduling problem
-
Fisher, M.L., 1976. A dual algorithm for the one-machine scheduling problem. Mathematical Programming, 11 (1), 229-251.
-
(1976)
Mathematical Programming
, vol.11
, Issue.1
, pp. 229-251
-
-
Fisher, M.L.1
-
12
-
-
0001953837
-
Genetic algorithms for multi-objective optimization: Formulation, discussion and generalization
-
July 1993. San Mateo, CA: Morgan Kaufmann
-
Fonseca, C.M. and Fleming, P.J., 1993. Genetic algorithms for multi-objective optimization: formulation, discussion and generalization. In: Proceedings of the fifth international conference on genetic algorithms, July 1993. San Mateo, CA: Morgan Kaufmann, 416-423.
-
(1993)
Proceedings of the Fifth International Conference on Genetic Algorithms
, pp. 416-423
-
-
Fonseca, C.M.1
Fleming, P.J.2
-
15
-
-
0028585530
-
A niched Pareto genetic algorithm for multi-objective optimization
-
Computational Computation, 27-29 June 1994, Orlando, FL
-
Horn, J., Nafpliotis, N. and Goldberg, D.E., 1994. A niched Pareto genetic algorithm for multi-objective optimization. In: Proceedings of the 1st IEEE-ICEC conference, Computational Computation, 27-29 June 1994, Orlando, FL, Volume 1, 82-87.
-
(1994)
Proceedings of the 1St IEEE-ICEC Conference
, vol.1
, pp. 82-87
-
-
Horn, J.1
Nafpliotis, N.2
Goldberg, D.E.3
-
16
-
-
33750285102
-
Development of grid-partitioned objective space algorithm for flowshop scheduling with multiple objectives
-
4-7 December 2005, Manilla, Philippines
-
Hsieh, J.C., 2005. Development of grid-partitioned objective space algorithm for flowshop scheduling with multiple objectives. In: Proceedings of the 6th Asia Pacific industrial engineering and management systems conference 2005, 4-7 December 2005, Manilla, Philippines.
-
(2005)
Proceedings of the 6Th Asia Pacific Industrial Engineering and Management Systems Conference 2005
-
-
Hsieh, J.C.1
-
18
-
-
0032120699
-
A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines
-
Hyun, C.J., Kim, Y., and Kim, Y.K., 1998. A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. Computers and Operations Research, 25 (7-8), 675-690.
-
(1998)
Computers and Operations Research
, vol.25
, Issue.7-8
, pp. 675-690
-
-
Hyun, C.J.1
Kim, Y.2
Kim, Y.K.3
-
19
-
-
0032141635
-
A multi-objective genetic local search algorithm and its application to flowshop scheduling
-
Ishibuchi, H. and Murata, T., 1998. A multi-objective genetic local search algorithm and its application to flowshop scheduling. IEEE Transaction on Systems and Manufacturing Cybernetics, 28 (3), 392-403.
-
(1998)
IEEE Transaction on Systems and Manufacturing Cybernetics
, vol.28
, Issue.3
, pp. 392-403
-
-
Ishibuchi, H.1
Murata, T.2
-
20
-
-
42449153783
-
Algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria
-
Jungwattanakit, J., et al., 2007. Algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria. International Journal of Advanced Manufacturing Technology, 37 (3-4), 354-370.
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.37
, Issue.3-4
, pp. 354-370
-
-
Jungwattanakit, J.1
-
21
-
-
84901404865
-
The Pareto archived evolution strategy: A new baseline algorithm for multiobjective optimization
-
6-9 July, Washington, DC. Washington, DC: IEEE Service Center
-
Knowles, J.D. and Corne, D.W., 1999. The Pareto archived evolution strategy: a new baseline algorithm for multiobjective optimization. In: Proceedings of the 1999 congress on evolutionary computation, 6-9 July, Washington, DC. Washington, DC: IEEE Service Center, 98-105.
-
(1999)
Proceedings of the 1999 Congress on Evolutionary Computation
, pp. 98-105
-
-
Knowles, J.D.1
Corne, D.W.2
-
22
-
-
0035841877
-
Heuristic scheduling of parallel machines with sequence-dependent set-up times
-
Kurz, M.E. and Askin, R.G., 2001. Heuristic scheduling of parallel machines with sequence-dependent set-up times. International Journal of Production Research, 39 (16), 3747-3769.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.16
, pp. 3747-3769
-
-
Kurz, M.E.1
Askin, R.G.2
-
23
-
-
0030241820
-
Multi-objective genetic algorithm and its applications to flowshop scheduling
-
Murata, T., Ishibuchi, H., and Tanaka, H., 1996. Multi-objective genetic algorithm and its applications to flowshop scheduling. Computers and Industrial Engineering, 30 (4), 957-968.
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 957-968
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
24
-
-
63449107983
-
Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness
-
Naderi, B., Zandieh, M., and Roshanaei, V., 2008. Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness. International Journal of Advanced Manufacturing Technology, 41 (11-12), 1186-1198.
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.41
, Issue.11-12
, pp. 1186-1198
-
-
Naderi, B.1
Zandieh, M.2
Roshanaei, V.3
-
25
-
-
70449561153
-
Scheduling job shop problems with sequence-dependent setup times
-
Naderi, B., Zandieh, M., and Fatemi Ghomi, S.M.T., 2009. Scheduling job shop problems with sequence-dependent setup times. International Journal of Production Research, 47 (21), 5959-5976.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.21
, pp. 5959-5976
-
-
Naderi, B.1
Zandieh, M.2
Fatemi Ghomi, S.M.T.3
-
26
-
-
0002470532
-
A study of permutation crossover operators on the traveling salesman problem
-
28-31 July, MIT, Cambridge, MA. Hillsdale, NJ: L. Erlbaum Associates
-
Oliver, I.M., Smith, D.J. and Holland, J.R.C., 1987. A study of permutation crossover operators on the traveling salesman problem. In: Proceedings of the second international conference on genetic algorithms and their application (ICGA 1987), 28-31 July, MIT, Cambridge, MA. Hillsdale, NJ: L. Erlbaum Associates, 224-230.
-
(1987)
Proceedings of the Second International Conference on Genetic Algorithms and Their Application (ICGA 1987)
, pp. 224-230
-
-
Oliver, I.M.1
Smith, D.J.2
Holland, J.R.C.3
-
27
-
-
29344433807
-
A multi-objective genetic algorithm for scheduling in flowshops to minimize the makespan and total flow time of jobs
-
Pasupathy, T., Rajendran, C., and Suresh, R.K., 2007. A multi-objective genetic algorithm for scheduling in flowshops to minimize the makespan and total flow time of jobs. Intentional Journal of Advanced Manufacturing Technology, 27 (7-8), 804-815.
-
(2007)
Intentional Journal of Advanced Manufacturing Technology
, vol.27
, Issue.7-8
, pp. 804-815
-
-
Pasupathy, T.1
Rajendran, C.2
Suresh, R.K.3
-
28
-
-
33846799315
-
A multi-objective scatter search for a mixed-model assembly line sequencing problem
-
Rahimi-Vahed, A.R., et al., 2007. A multi-objective scatter search for a mixed-model assembly line sequencing problem. Advanced Engineering Informatics, 21 (1), 85-99.
-
(2007)
Advanced Engineering Informatics
, vol.21
, Issue.1
, pp. 85-99
-
-
Rahimi-Vahed, A.R.1
-
29
-
-
27144540137
-
A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
-
Ruiz, R. and Marato, C., 2006. A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility. European Journal of Operational Research, 169 (3), 781-800.
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.3
, pp. 781-800
-
-
Ruiz, R.1
Marato, C.2
-
30
-
-
6344219984
-
Using the FDH formulation of DEA to evaluate a multi-criteria problem in parallel machine scheduling
-
Ruiz-Torres, A.J. and Lopez, F.J., 2004. Using the FDH formulation of DEA to evaluate a multi-criteria problem in parallel machine scheduling. Computers & Industrial Engineering, 47 (2-3), 107-121.
-
(2004)
Computers & Industrial Engineering
, vol.47
, Issue.2-3
, pp. 107-121
-
-
Ruiz-Torres, A.J.1
Lopez, F.J.2
-
31
-
-
0000599395
-
Multi-objective optimization with vector evaluated genetic algorithms
-
J. Grefenstette, ed., Hillsdale, New Jersey: Lawrence Erlbaum
-
Schaffer, J.D., 1985. Multi-objective optimization with vector evaluated genetic algorithms. In: J. Grefenstette, ed. Proceedings of the international conference on genetic algorithms and their applications, Hillsdale, New Jersey: Lawrence Erlbaum, 93-100.
-
(1985)
Proceedings of the International Conference on Genetic Algorithms and Their Applications
, pp. 93-100
-
-
Schaffer, J.D.1
-
32
-
-
0000852513
-
Multi-objective function optimization using non-dominated sorting genetic algorithms
-
Srinivas, N. and Deb, K., 1995. Multi-objective function optimization using non-dominated sorting genetic algorithms. IEEE Transactions on Evolutionary Computation, 2 (3), 221-248.
-
(1995)
IEEE Transactions on Evolutionary Computation
, vol.2
, Issue.3
, pp. 221-248
-
-
Srinivas, N.1
Deb, K.2
-
33
-
-
0002755938
-
Schedule optimization using genetic algorithms
-
L. Davis, ed., New York: Van Nostrand Reinhold
-
Syswerda, G., 1990. Schedule optimization using genetic algorithms. In: L. Davis, ed. Handbook of genetic algorithms. New York: Van Nostrand Reinhold, 332-349.
-
(1990)
Handbook of Genetic Algorithms
, pp. 332-349
-
-
Syswerda, G.1
-
34
-
-
0004068664
-
Genetic algorithm with a Pareto partitioning method for multiobjective flowshop scheduling
-
14-17 September1998, Crans-Montana, Switzerland
-
Tagami, T. and Kawabe, T., 1998. Genetic algorithm with a Pareto partitioning method for multiobjective flowshop scheduling. In: Proceedings of the 1998 international symposium of nonlinear theory and its applications (NOLTA), 14-17 September 1998, Crans-Montana, Switzerland, 1069-1072.
-
(1998)
Proceedings of the 1998 International Symposium of Nonlinear Theory and Its Applications (NOLTA)
, pp. 1069-1072
-
-
Tagami, T.1
Kawabe, T.2
-
35
-
-
34548722622
-
Solving a bi-criteria permutation flowshop problem using immune algorithm
-
1-5 April, Honolulu, Hawaii
-
Tavakkoli-Moghaddam, R., Rahimi-Vahed, A.R. and Mirzaei, A.H., 2007a. Solving a bi-criteria permutation flowshop problem using immune algorithm. In: Proceedings of the first IEEE symposium on computational intelligence, vol. 1, 1-5 April, Honolulu, Hawaii, 49-56.
-
(2007)
Proceedings of the First IEEE Symposium on Computational Intelligence
, vol.1
, pp. 49-56
-
-
Tavakkoli-Moghaddam, R.1
Rahimi-Vahed, A.R.2
Mirzaei, A.H.3
-
36
-
-
34548237317
-
A hybrid multi-objective immune algorithm for a flowshop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness
-
Tavakkoli-Moghaddam, R., Rahimi-Vahed, A.R., and Mirzaei, A.H., 2007b. A hybrid multi-objective immune algorithm for a flowshop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness. Information Sciences, 177 (22), 5072-5090.
-
(2007)
Information Sciences
, vol.177
, Issue.22
, pp. 5072-5090
-
-
Tavakkoli-Moghaddam, R.1
Rahimi-Vahed, A.R.2
Mirzaei, A.H.3
-
37
-
-
41149105271
-
Solving a multi-objective no-wait flowshop scheduling problem with an immune algorithm
-
Tavakkoli-Moghaddam, R., Rahimi-Vahed, A.R., and Mirzaei, A.H., 2008. Solving a multi-objective no-wait flowshop scheduling problem with an immune algorithm. International Journal of Advanced Manufacturing Technology, 36 (9-10), 969-981.
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.36
, Issue.9-10
, pp. 969-981
-
-
Tavakkoli-Moghaddam, R.1
Rahimi-Vahed, A.R.2
Mirzaei, A.H.3
-
38
-
-
67349221528
-
Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints
-
Tavakkoli-Moghaddam, R., et al., 2009. Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints. Computers & Operations Research, 36 (12), 3224-3230.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.12
, pp. 3224-3230
-
-
Tavakkoli-Moghaddam, R.1
-
39
-
-
33748321077
-
An immune algorithm approach to hybrid flowshops scheduling with sequence-dependent setup times
-
Zandieh, M., Fatemi Ghomi, S.M.T., and Moattar Husseini, S.M., 2006. An immune algorithm approach to hybrid flowshops scheduling with sequence-dependent setup times. Applied Mathematics and Computation, 180 (1), 111-127.
-
(2006)
Applied Mathematics and Computation
, vol.180
, Issue.1
, pp. 111-127
-
-
Zandieh, M.1
Fatemi Ghomi, S.M.T.2
Moattar Husseini, S.M.3
-
40
-
-
0033318858
-
Multi-objective evolutionary algorithm: A comparative case study and the strength Pareto approach
-
Zitzler, E. and Thiele, L., 1999. Multi-objective evolutionary algorithm: a comparative case study and the strength Pareto approach. IEEE Transactions on Evolutionary Computation, 3 (4), 251-257.
-
(1999)
IEEE Transactions on Evolutionary Computation
, vol.3
, Issue.4
, pp. 251-257
-
-
Zitzler, E.1
Thiele, L.2
-
41
-
-
0004140075
-
-
Report 103.Computer Engineering and Networks Laboratory (TIK), Zurich
-
Zitzler, E., Laumanns, M. and Thiele, L., 2001. SPEA2: improving the strength Pareto evolutionary algorithm. Report 103. Computer Engineering and Networks Laboratory (TIK), Zurich.
-
(2001)
SPEA2: Improving the Strength Pareto Evolutionary Algorithm.
-
-
Zitzler, E.1
Laumanns, M.2
Thiele, L.3
|