메뉴 건너뛰기




Volumn 5, Issue 2, 2013, Pages 115-130

A framework for the integration and coordination of the construction supply chain

Author keywords

4D 5D planning; Construction supply chain; Schedules coordination

Indexed keywords


EID: 85014648544     PISSN: 17589401     EISSN: 1758941X     Source Type: Journal    
DOI: 10.1504/IJBPSCM.2013.053489     Document Type: Article
Times cited : (6)

References (18)
  • 3
    • 85027397166 scopus 로고    scopus 로고
    • accessed 10 May
    • Autodesk Navisworks (2010) [online] http://www. synchroltd. com/shop/synchroprofessional- synchropro. htm (accessed 10 May).
    • (2010) Autodesk Navisworks
  • 4
    • 32144456186 scopus 로고    scopus 로고
    • Benefits evaluation for off-site production in construction
    • Blismas, N., Pasquire, C. and Gibb, A. (2006) 'Benefits evaluation for off-site production in construction', Construction Management and Economics, Vol. 24, No. 2, pp. 121-130.
    • (2006) Construction Management and Economics , vol.24 , Issue.2 , pp. 121-130
    • Blismas, N.1    Pasquire, C.2    Gibb, A.3
  • 7
    • 0344062630 scopus 로고    scopus 로고
    • Distributed coordination of project schedule changes using agent-based compensatory negotiation methodology
    • Cambridge University Press
    • Kim, K., et al. (2003) 'Distributed coordination of project schedule changes using agent-based compensatory negotiation methodology', Artificial Intelligence for Engineering Design, Analysis, and Manufacturing, Cambridge University Press, Vol. 17, No. 2, pp. 115-131.
    • (2003) Artificial Intelligence for Engineering Design, Analysis, and Manufacturing , vol.17 , Issue.2 , pp. 115-131
    • Kim, K.1
  • 11
    • 84915754826 scopus 로고    scopus 로고
    • Optimal inventory policies of facilities in a supply chain system under fuzzy stochastic environment
    • Shaw, D. K. and Khan, D. A. (2012) 'Optimal inventory policies of facilities in a supply chain system under fuzzy stochastic environment', Int. J. of Business Performance and Supply Chain Modelling, Vol. 4, No. 2, pp. 111-125.
    • (2012) Int. J. of Business Performance and Supply Chain Modelling , vol.4 , Issue.2 , pp. 111-125
    • Shaw, D.K.1    Khan, D.A.2
  • 13
    • 85027402640 scopus 로고    scopus 로고
    • South East Centre for the Built Environment (accessed on May 22)
    • South East Centre for the Built Environment (2006) A Guide to Best Practice in Construction, [online] http://www. secbe. org. uk/documents/introductory-best-practice-guide. pdf (accessed on May 22).
    • (2006) A Guide to Best Practice in Construction
  • 14
    • 2942750055 scopus 로고    scopus 로고
    • Multi-constraint information management and visualisation for collaborative planning and control in construction
    • Sriprasert, E. and Dawood, N. (2003) 'Multi-constraint information management and visualisation for collaborative planning and control in construction', Journal of Information Technology in Construction, Vol. 8, pp. 341-366.
    • (2003) Journal of Information Technology in Construction , vol.8 , pp. 341-366
    • Sriprasert, E.1    Dawood, N.2
  • 15
    • 85027416384 scopus 로고    scopus 로고
    • Synchro Ltd. (accessed on 10 May)
    • Synchro Ltd. (2010) Synchro Professional, [online] http://www. synchroltd. com/shop/synchroprofessional- synchropro. htm (accessed on 10 May).
    • (2010) Synchro Professional
  • 17
    • 0035298885 scopus 로고    scopus 로고
    • Phenomenological foundations of conceptual product modeling in architecture, engineering, and construction
    • Turk, Z. (2001) 'Phenomenological foundations of conceptual product modeling in architecture, engineering, and construction', Artificial Intelligence in Engineering, Vol. 15, No. 2, pp. 83-92.
    • (2001) Artificial Intelligence in Engineering , vol.15 , Issue.2 , pp. 83-92
    • Turk, Z.1
  • 18
    • 0033077414 scopus 로고    scopus 로고
    • A software industry perspective on AEC information models for distributed collaboration
    • Zamanian, M. K. and Pittman, J. H. (1999) 'A software industry perspective on AEC information models for distributed collaboration', Automation in Construction, Vol. 8, No. 3, pp. 237-248.
    • (1999) Automation in Construction , vol.8 , Issue.3 , pp. 237-248
    • Zamanian, M.K.1    Pittman, J.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.