메뉴 건너뛰기




Volumn 45, Issue , 2017, Pages 147-159

A fuzzy risk matrix method and its application to the installation operation of subsea collet connector

Author keywords

Fuzzy risk matrix method; Installation; Risk rating; Subsea collet connector

Indexed keywords

CHUCKS; OFFSHORE OIL WELL PRODUCTION; RISK ANALYSIS; RISK ASSESSMENT;

EID: 85008185394     PISSN: 09504230     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jlp.2016.11.014     Document Type: Article
Times cited : (43)

References (26)
  • 1
    • 84891858316 scopus 로고    scopus 로고
    • On how to understand and present the uncertainties in production assurance analyses, with a case study related to a subsea production system
    • Aven, T., Pedersen, L.M., On how to understand and present the uncertainties in production assurance analyses, with a case study related to a subsea production system. Reliab. Eng. Syst. Saf. 124 (2014), 165–170.
    • (2014) Reliab. Eng. Syst. Saf. , vol.124 , pp. 165-170
    • Aven, T.1    Pedersen, L.M.2
  • 2
    • 1642562907 scopus 로고    scopus 로고
    • The accident of P-36 FPS
    • In: Offshore Technology Conference.
    • Barusco, P., 2002. The accident of P-36 FPS. In: Offshore Technology Conference.
    • (2002)
    • Barusco, P.1
  • 4
    • 0003745647 scopus 로고
    • Fuzzy Multiple Attribute Decision Making Methods: Methods and Applications
    • Springer Berlin Heidelberg
    • Chen, S.J., Hwang, C.L., Fuzzy Multiple Attribute Decision Making Methods: Methods and Applications. 1992, Springer Berlin Heidelberg.
    • (1992)
    • Chen, S.J.1    Hwang, C.L.2
  • 5
    • 84862848002 scopus 로고    scopus 로고
    • Risk assessment for structural design criteria of FPSO systems. Part I: generic models and acceptance criteria
    • Faber, M.H., Straub, D., Heredia-Zavoni, E., Montes-Iturrizaga, R., Risk assessment for structural design criteria of FPSO systems. Part I: generic models and acceptance criteria. Mar. Struct. 28:1 (2012), 120–133.
    • (2012) Mar. Struct. , vol.28 , Issue.1 , pp. 120-133
    • Faber, M.H.1    Straub, D.2    Heredia-Zavoni, E.3    Montes-Iturrizaga, R.4
  • 6
    • 84940379071 scopus 로고    scopus 로고
    • Compensating victims of a european deepwater Horizon accident: OPOL revisited
    • Faure, M., Wang, H., Compensating victims of a european deepwater Horizon accident: OPOL revisited. Mar. Policy 62 (2015), 25–36.
    • (2015) Mar. Policy , vol.62 , pp. 25-36
    • Faure, M.1    Wang, H.2
  • 7
    • 0002953875 scopus 로고    scopus 로고
    • Risk matrix: an approach for identifying, assessing, and ranking program risks
    • Garvey, P.R., Lansdowne, Z.F., Risk matrix: an approach for identifying, assessing, and ranking program risks. Air Force J. Logist. 22:1 (1998), 18–21.
    • (1998) Air Force J. Logist. , vol.22 , Issue.1 , pp. 18-21
    • Garvey, P.R.1    Lansdowne, Z.F.2
  • 8
    • 0034873147 scopus 로고    scopus 로고
    • Safety of offshore installations–making ALARP principle more practicable
    • International Society of Offshore and Polar Engineers
    • Kuo, C., Safety of offshore installations–making ALARP principle more practicable. The Eleventh International Offshore and Polar Engineering Conference, 2001, International Society of Offshore and Polar Engineers.
    • (2001) The Eleventh International Offshore and Polar Engineering Conference
    • Kuo, C.1
  • 9
    • 84942114522 scopus 로고    scopus 로고
    • Utilisation of Fuzzy Fault Tree Analysis (FFTA) for quantified risk analysis of leakage in abandoned oil and natural-gas wells
    • Lavasani, S.M., Ramzali, N., Sabzalipour, F., Akyuz, E., Utilisation of Fuzzy Fault Tree Analysis (FFTA) for quantified risk analysis of leakage in abandoned oil and natural-gas wells. Ocean. Eng. 108 (2015), 729–737.
    • (2015) Ocean. Eng. , vol.108 , pp. 729-737
    • Lavasani, S.M.1    Ramzali, N.2    Sabzalipour, F.3    Akyuz, E.4
  • 10
    • 0031382208 scopus 로고    scopus 로고
    • Hybrid fault tree analysis using fuzzy sets
    • Lin, C.T., Wang, M.J.J., Hybrid fault tree analysis using fuzzy sets. Reliab. Eng. Syst. Saf. 58:3 (1997), 205–213.
    • (1997) Reliab. Eng. Syst. Saf. , vol.58 , Issue.3 , pp. 205-213
    • Lin, C.T.1    Wang, M.J.J.2
  • 12
    • 79151484001 scopus 로고    scopus 로고
    • An application of fuzzy fault tree analysis for spread mooring systems
    • Mentes, A., Helvacioglu, I.H., An application of fuzzy fault tree analysis for spread mooring systems. Ocean. Eng. 38:2 (2011), 285–294.
    • (2011) Ocean. Eng. , vol.38 , Issue.2 , pp. 285-294
    • Mentes, A.1    Helvacioglu, I.H.2
  • 13
    • 84891636847 scopus 로고    scopus 로고
    • Application of fuzzy fault tree analysis on oil and gas offshore pipelines
    • Miri Lavasani, M.R., Wang, J., Yang, Z., Finlay, J., Application of fuzzy fault tree analysis on oil and gas offshore pipelines. Int. J. Mar. Sci. Eng. 1:1 (2011), 29–42.
    • (2011) Int. J. Mar. Sci. Eng. , vol.1 , Issue.1 , pp. 29-42
    • Miri Lavasani, M.R.1    Wang, J.2    Yang, Z.3    Finlay, J.4
  • 14
    • 0024067211 scopus 로고
    • An approach to human reliability in man-machine systems using error possibility
    • Onisawa, T., An approach to human reliability in man-machine systems using error possibility. Fuzzy Sets Syst. 27:2 (1988), 87–103.
    • (1988) Fuzzy Sets Syst. , vol.27 , Issue.2 , pp. 87-103
    • Onisawa, T.1
  • 15
    • 79957661315 scopus 로고    scopus 로고
    • Quantitative assessment of hydrocarbon explosion and fire risks in offshore installations
    • Paik, J.K., Czujko, J., Kim, B.J., et al. Quantitative assessment of hydrocarbon explosion and fire risks in offshore installations. Mar. Struct. 24:2 (2011), 73–96.
    • (2011) Mar. Struct. , vol.24 , Issue.2 , pp. 73-96
    • Paik, J.K.1    Czujko, J.2    Kim, B.J.3
  • 17
    • 0000632133 scopus 로고
    • Quantitative risk assessment applied to offshore process installations. challenges after the piper alpha disaster
    • Ramsay, C.G., Bolsover, A.J., Jones, R.H., Medland, W.G., Quantitative risk assessment applied to offshore process installations. challenges after the piper alpha disaster. J. loss Prev. process industries 7:4 (1994), 317–330.
    • (1994) J. loss Prev. process industries , vol.7 , Issue.4 , pp. 317-330
    • Ramsay, C.G.1    Bolsover, A.J.2    Jones, R.H.3    Medland, W.G.4
  • 19
    • 0037868886 scopus 로고    scopus 로고
    • The allocation of intangible resources: the analytic hierarchy process and linear programming
    • Saaty, T.L., Vargas, L.G., Dellmann, K., The allocation of intangible resources: the analytic hierarchy process and linear programming. Socio-Economic Plan. Sci. 37:3 (2003), 169–184.
    • (2003) Socio-Economic Plan. Sci. , vol.37 , Issue.3 , pp. 169-184
    • Saaty, T.L.1    Vargas, L.G.2    Dellmann, K.3
  • 20
    • 84939954581 scopus 로고    scopus 로고
    • Fault Tree Analysis of chemical cargo contamination by using fuzzy approach
    • Senol, Y.E., Aydogdu, Y.V., Sahin, B., Kilic, I., Fault Tree Analysis of chemical cargo contamination by using fuzzy approach. Expert Syst. Appl. 42:12 (2015), 5232–5244.
    • (2015) Expert Syst. Appl. , vol.42 , Issue.12 , pp. 5232-5244
    • Senol, Y.E.1    Aydogdu, Y.V.2    Sahin, B.3    Kilic, I.4
  • 21
    • 84903884239 scopus 로고    scopus 로고
    • Fuzzy fault tree assessment based on improved AHP for fire and explosion accidents for steel oil storage tanks
    • Shi, L., Shuai, J., Xu, K., Fuzzy fault tree assessment based on improved AHP for fire and explosion accidents for steel oil storage tanks. J. Hazard. Mater. 278 (2014), 529–538.
    • (2014) J. Hazard. Mater. , vol.278 , pp. 529-538
    • Shi, L.1    Shuai, J.2    Xu, K.3
  • 22
    • 84855878176 scopus 로고    scopus 로고
    • Quantitative risk analysis of oil and gas drilling, using Deepwater Horizon as case study
    • Skogdalen, J.E., Vinnem, J.E., Quantitative risk analysis of oil and gas drilling, using Deepwater Horizon as case study. Reliab. Eng. Syst. Saf. 100 (2012), 58–66.
    • (2012) Reliab. Eng. Syst. Saf. , vol.100 , pp. 58-66
    • Skogdalen, J.E.1    Vinnem, J.E.2
  • 23
    • 0035545744 scopus 로고    scopus 로고
    • Risk assessment in maritime transportation
    • Soares, C.G., Teixeira, A.P., Risk assessment in maritime transportation. Reliab. Eng. Syst. Saf. 74:3 (2001), 299–309.
    • (2001) Reliab. Eng. Syst. Saf. , vol.74 , Issue.3 , pp. 299-309
    • Soares, C.G.1    Teixeira, A.P.2
  • 24
    • 84891648565 scopus 로고    scopus 로고
    • Fuzzy fault tree analysis for fire and explosion of crude oil tanks
    • Wang, D., Zhang, P., Chen, L., Fuzzy fault tree analysis for fire and explosion of crude oil tanks. J. Loss Prev. Process Industries 26:6 (2013), 1390–1398.
    • (2013) J. Loss Prev. Process Industries , vol.26 , Issue.6 , pp. 1390-1398
    • Wang, D.1    Zhang, P.2    Chen, L.3
  • 26
    • 16244418130 scopus 로고    scopus 로고
    • Estimation of failure probability of oil and gas transmission pipelines by fuzzy fault tree analysis
    • Yuhua, D., Datao, Y., Estimation of failure probability of oil and gas transmission pipelines by fuzzy fault tree analysis. J. loss Prev. process industries 18:2 (2005), 83–88.
    • (2005) J. loss Prev. process industries , vol.18 , Issue.2 , pp. 83-88
    • Yuhua, D.1    Datao, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.