|
Volumn 124, Issue , 2014, Pages 165-170
|
On how to understand and present the uncertainties in production assurance analyses, with a case study related to a subsea production system
|
Author keywords
Production assurance; Subsea system; Uncertainties
|
Indexed keywords
MONTE CARLO METHODS;
PROBABILITY DISTRIBUTIONS;
PRODUCTION ENGINEERING;
RESTORATION;
STOCHASTIC MODELS;
CONCEPTUAL FRAMEWORKS;
EPISTEMIC UNCERTAINTIES;
PRODUCTION ASSURANCE;
STOCHASTIC VARIATION;
SUBSEA PRODUCTION SYSTEMS;
SUBSEA SYSTEMS;
UNCERTAINTIES;
UNCERTAINTY DISTRIBUTIONS;
UNCERTAINTY ANALYSIS;
|
EID: 84891858316
PISSN: 09518320
EISSN: None
Source Type: Journal
DOI: 10.1016/j.ress.2013.12.003 Document Type: Article |
Times cited : (29)
|
References (11)
|