메뉴 건너뛰기




Volumn 22, Issue 5, 2004, Pages 251-258

The standardisation of construction snagging

Author keywords

Construction industry; Quality; Standardization

Indexed keywords


EID: 84993017537     PISSN: 0263080X     EISSN: 17586844     Source Type: Journal    
DOI: 10.1108/02630800410571562     Document Type: Article
Times cited : (25)

References (13)
  • 1
    • 29144451417 scopus 로고    scopus 로고
    • Mobile communication in construction – trends and prospects
    • Loughborough University, Millpress, 25-26 June
    • Anumba, C.J., Aziz, Z. and Obonyo, E.A. (2003), “Mobile communication in construction – trends and prospects”, in Ed. Anumba, C.J. (Ed.), Innovative developments in Architecture, Engineering and Construction, Loughborough University, Millpress, 25-26 June, pp. 159-168.
    • (2003) Innovative developments in Architecture, Engineering and Construction , pp. 159-168
    • Anumba, C.J.1    Aziz, Z.2    Obonyo, E.A.3
  • 2
    • 84993012791 scopus 로고    scopus 로고
    • The pathology of building defects; a human error approach
    • Atkinson, A.R. (2002), “The pathology of building defects; a human error approach”, Engineering, Construction & Architectural Management, Vol. 9 No. 1, pp. 53-61.
    • (2002) Engineering, Construction & Architectural Management , vol.9 , Issue.1 , pp. 53-61
    • Atkinson, A.R.1
  • 3
    • 84993015263 scopus 로고    scopus 로고
    • The impact of electronic document management on construction information management
    • paper presented at the CIB W78 Conference, International Council for Research and Innovation in Building and Construction
    • Bjork, B. (2002), “The impact of electronic document management on construction information management”, paper presented at the CIB W78 Conference, International Council for Research and Innovation in Building and Construction.
    • (2002)
    • Bjork, B.1
  • 4
    • 2942739546 scopus 로고    scopus 로고
    • Mobile communications for on-site collaboration
    • Proceedings of ICE, Institution of Civil Engineers, London, November
    • Bowden, S. and Thorpe, T. (2002), “Mobile communications for on-site collaboration”, Proceedings of ICE, Institution of Civil Engineers, London, November, pp. 38-44.
    • (2002) , pp. 38-44
    • Bowden, S.1    Thorpe, T.2
  • 5
    • 84992931177 scopus 로고    scopus 로고
    • EDMS as a tool for organisational learning and knowledge management within construction supply chains
    • paper presented at the 1st Annual PROBE Conference, Post Graduate Researchers of the Built Environment, Glasgow Caledonian University, 18-19 November
    • Craig, N., Tong, M.K.L. and Vines, M.P. (2003), “EDMS as a tool for organisational learning and knowledge management within construction supply chains”, paper presented at the 1st Annual PROBE Conference, Post Graduate Researchers of the Built Environment, Glasgow Caledonian University, 18-19 November, pp. 225-234.
    • (2003) , pp. 225-234
    • Craig, N.1    Tong, M.K.L.2    Vines, M.P.3
  • 6
    • 0032073196 scopus 로고    scopus 로고
    • Wireless communication and computing at the construction jobsite
    • De la Garza, J.M. and Howitt, I. (1998), “Wireless communication and computing at the construction jobsite”, Automation in Construction, Vol. 7, pp. 327-347.
    • (1998) Automation in Construction , vol.7 , pp. 327-347
    • De la Garza, J.M.1    Howitt, I.2
  • 7
    • 84986104505 scopus 로고    scopus 로고
    • Auditing the indirect consequences of rework in construction: a case based approach
    • Love, P.E.D. (2002), “Auditing the indirect consequences of rework in construction: a case based approach”, Managerial Auditing Journal, Vol. 17 No. 3, pp. 138-146.
    • (2002) Managerial Auditing Journal , vol.17 , Issue.3 , pp. 138-146
    • Love, P.E.D.1
  • 8
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • Love, P.E.D. and Li, H. (2000), “Quantifying the causes and costs of rework in construction”, Construction Management and Economics, Vol. 18, pp. 479-490.
    • (2000) Construction Management and Economics , vol.18 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 9
    • 84986169775 scopus 로고    scopus 로고
    • Capturing rework costs in projects
    • Love, P.E.D. and Sohal, A.S. (2003), “Capturing rework costs in projects”, Managerial Auditing Journal, Vol. 18 No. 4, pp. 329-339.
    • (2003) Managerial Auditing Journal , vol.18 , Issue.4 , pp. 329-339
    • Love, P.E.D.1    Sohal, A.S.2
  • 10
    • 0001187120 scopus 로고    scopus 로고
    • Determining the casual structure of rework influences in construction
    • Love, P.E.D., Mandal, P. and Li, H. (1999), “Determining the casual structure of rework influences in construction”, Construction Management and Economics, Vol. 17, pp. 505-517.
    • (1999) Construction Management and Economics , vol.17 , pp. 505-517
    • Love, P.E.D.1    Mandal, P.2    Li, H.3
  • 11
    • 84993083658 scopus 로고    scopus 로고
    • Measuring the benefits of information technology in construction
    • Marsh, L. and Flanagan, R. (2000), “Measuring the benefits of information technology in construction”, Engineering, Construction & Architectural Management, Vol. 7 No. 4, pp. 423-435.
    • (2000) Engineering, Construction & Architectural Management , vol.7 , Issue.4 , pp. 423-435
    • Marsh, L.1    Flanagan, R.2
  • 12
    • 84992981228 scopus 로고    scopus 로고
    • Information processing using a digital pen and paper
    • paper presented at the International Conference on Construction Information Technology World IT for Design and Construction, Langkawi, Malaysia, 18-21 February, available at: www.inspectorhome.co.uk
    • Sommerville, J. and Craig, N. (2004), “Information processing using a digital pen and paper”, paper presented at the International Conference on Construction Information Technology World IT for Design and Construction, Langkawi, Malaysia, 18-21 February, available at: www.inspectorhome.co.uk
    • (2004)
    • Sommerville, J.1    Craig, N.2
  • 13
    • 35649006751 scopus 로고    scopus 로고
    • Handwriting recognition: improving the effectiveness of electronic construction project information
    • paper presented at the 4th Post Graduate Research Conference, University of Salford, 21-22 April
    • Sommerville, J., Craig, N. and Ohlstenius, O. (2004), “Handwriting recognition: improving the effectiveness of electronic construction project information”, paper presented at the 4th Post Graduate Research Conference, University of Salford, 21-22 April, Vol. 1, pp. 274-283.
    • (2004) , vol.1 , pp. 274-283
    • Sommerville, J.1    Craig, N.2    Ohlstenius, O.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.