메뉴 건너뛰기




Volumn 20, Issue 3, 2017, Pages 219-237

Continuous-time production, distribution and financial planning with periodic liquidity balancing

Author keywords

Continuous time modeling; Financing; Liquidity balancing; Short term planning and scheduling; Supply chain networks

Indexed keywords

FINANCE; INTEGER PROGRAMMING; NONLINEAR PROGRAMMING; PLANNING; SCHEDULING; SUPPLY CHAINS;

EID: 84978173382     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-016-0488-7     Document Type: Article
Times cited : (20)

References (24)
  • 1
    • 84871258510 scopus 로고    scopus 로고
    • A continuous-time MILP model for short-term scheduling of make-and-pack production processes
    • Baumann, P., & Trautmann, N. (2013). A continuous-time MILP model for short-term scheduling of make-and-pack production processes. International Journal of Production Research, 51(6), 1707–1727.
    • (2013) International Journal of Production Research , vol.51 , Issue.6 , pp. 1707-1727
    • Baumann, P.1    Trautmann, N.2
  • 2
    • 84880507064 scopus 로고    scopus 로고
    • Applied column generation-based approach to solve supply chain scheduling problems
    • Chang, Y.-C., Chang, K.-H., & Chang, T.-K. (2013). Applied column generation-based approach to solve supply chain scheduling problems. International Journal of Production Research, 51(13), 4070–4086.
    • (2013) International Journal of Production Research , vol.51 , Issue.13 , pp. 4070-4086
    • Chang, Y.-C.1    Chang, K.-H.2    Chang, T.-K.3
  • 3
    • 0032661559 scopus 로고    scopus 로고
    • Integrated production/distribution planning in supply chains: An invited review
    • Erengüç, Ş., Simpson, N. C., & Vakharia, A. J. (1999). Integrated production/distribution planning in supply chains: An invited review. European Journal of Operational Research, 115(2), 219–236.
    • (1999) European Journal of Operational Research , vol.115 , Issue.2 , pp. 219-236
    • Erengüç, Ş.1    Simpson, N.C.2    Vakharia, A.J.3
  • 4
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
    • Floudas, C. A., & Lin, X. (2004). Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review. Computers and Chemical Engineering, 28, 2109–2129.
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 5
    • 85018158108 scopus 로고    scopus 로고
    • Washington, DC: GAMS Development Corporation
    • GAMS. (2015). GAMS documentation 24.5. Washington, DC: GAMS Development Corporation. http://www.gams.com/help/index.jsp.
    • (2015) GAMS documentation 24.5
  • 6
    • 84884906236 scopus 로고    scopus 로고
    • Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: A mathematical programming approach
    • Gomes, M. C., Barbosa-Póvoa, A., & Novais, A. Q. (2013). Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: A mathematical programming approach. International Journal of Production Research, 51(17), 5120–5141.
    • (2013) International Journal of Production Research , vol.51 , Issue.17 , pp. 5120-5141
    • Gomes, M.C.1    Barbosa-Póvoa, A.2    Novais, A.Q.3
  • 7
    • 30344444492 scopus 로고    scopus 로고
    • Simultaneous optimization of process operations and financial decisions to enhance the integrated planning/scheduling of chemical supply chains
    • Guillén-Gosálbez, G., Badell, M., Espuña, A., & Puigjaner, L. (2006). Simultaneous optimization of process operations and financial decisions to enhance the integrated planning/scheduling of chemical supply chains. Computers & Chemical Engineering, 30, 421–436.
    • (2006) Computers & Chemical Engineering , vol.30 , pp. 421-436
    • Guillén-Gosálbez, G.1    Badell, M.2    Espuña, A.3    Puigjaner, L.4
  • 8
    • 85012283629 scopus 로고    scopus 로고
    • The block planning approach for continuous time-based dynamic lot sizing and scheduling
    • Günther, H. O. (2014). The block planning approach for continuous time-based dynamic lot sizing and scheduling. Business Research, 7(1), 51–76.
    • (2014) Business Research , vol.7 , Issue.1 , pp. 51-76
    • Günther, H.O.1
  • 9
    • 84863213543 scopus 로고    scopus 로고
    • Value-based performance and risk management in supply chains: A robust optimization approach
    • Hahn, G. J., & Kuhn, H. (2011). Value-based performance and risk management in supply chains: A robust optimization approach. International Journal of Production Economics, 139(1), 135–144.
    • (2011) International Journal of Production Economics , vol.139 , Issue.1 , pp. 135-144
    • Hahn, G.J.1    Kuhn, H.2
  • 10
    • 0034976636 scopus 로고    scopus 로고
    • Planning and coordination of production and distribution facilities for multiple commodities
    • Jayaraman, V., & Pirkul, H. (2001). Planning and coordination of production and distribution facilities for multiple commodities. European Journal of Operational Research, 133(2), 394–408.
    • (2001) European Journal of Operational Research , vol.133 , Issue.2 , pp. 394-408
    • Jayaraman, V.1    Pirkul, H.2
  • 12
    • 0036642937 scopus 로고    scopus 로고
    • Production–distribution planning in supply chain considering capacity constraints
    • Lee, Y. H., & Kim, S. H. (2002). Production–distribution planning in supply chain considering capacity constraints. Computers & Industrial Engineering, 43(1–2), 169–190.
    • (2002) Computers & Industrial Engineering , vol.43 , Issue.1-2 , pp. 169-190
    • Lee, Y.H.1    Kim, S.H.2
  • 13
    • 67649756833 scopus 로고    scopus 로고
    • Integrated production planning and scheduling using a decomposition framework
    • Li, Z., & Ierapetritou, M. G. (2009). Integrated production planning and scheduling using a decomposition framework. Chemical Engineering Science, 64(16), 3585–3597.
    • (2009) Chemical Engineering Science , vol.64 , Issue.16 , pp. 3585-3597
    • Li, Z.1    Ierapetritou, M.G.2
  • 14
    • 84871187974 scopus 로고    scopus 로고
    • Integrated scheduling of production and delivery with time windows
    • Low, C., Li, R.-K., & Chang, C.-M. (2013). Integrated scheduling of production and delivery with time windows. International Journal of Production Research, 51(3), 897–909.
    • (2013) International Journal of Production Research , vol.51 , Issue.3 , pp. 897-909
    • Low, C.1    Li, R.-K.2    Chang, C.-M.3
  • 15
    • 84954365034 scopus 로고    scopus 로고
    • Workforce planning and financing on a production/capital discrete-time model
    • Martins, P., & Quelhas, A. P. (2016). Workforce planning and financing on a production/capital discrete-time model. International Transactions in Operational Research, 23, 507–538.
    • (2016) International Transactions in Operational Research , vol.23 , pp. 507-538
    • Martins, P.1    Quelhas, A.P.2
  • 16
    • 0033037070 scopus 로고    scopus 로고
    • Continuous time representation approach to batch and continuous process scheduling. 1. MINLP formulation
    • Mockus, L., & Reklaitis, G. V. (1999). Continuous time representation approach to batch and continuous process scheduling. 1. MINLP formulation. Industrial & Engineering Chemistry Research, 38, 197–203.
    • (1999) Industrial & Engineering Chemistry Research , vol.38 , pp. 197-203
    • Mockus, L.1    Reklaitis, G.V.2
  • 17
    • 84867089231 scopus 로고    scopus 로고
    • A multi-objective optimisation model to integrating flexible process planning and scheduling based on hybrid multi-objective simulated annealing
    • Mohammadi, G., Karampourhaghghi, A., & Samaei, F. (2012). A multi-objective optimisation model to integrating flexible process planning and scheduling based on hybrid multi-objective simulated annealing. International Journal of Production Research, 50(18), 5063–5076.
    • (2012) International Journal of Production Research , vol.50 , Issue.18 , pp. 5063-5076
    • Mohammadi, G.1    Karampourhaghghi, A.2    Samaei, F.3
  • 18
    • 84926149311 scopus 로고    scopus 로고
    • Woodhead Publishing, Cambridge
    • Moir, L. (1997). Managing liquidity (2nd ed.). Cambridge: Woodhead Publishing.
    • (1997) Managing liquidity
    • Moir, L.1
  • 19
    • 84867072505 scopus 로고    scopus 로고
    • Production scheduling with outsourcing scenarios: A mixed integer programming and efficient solution procedure
    • Mokhtari, H., Abadi, I. N. K., & Amin-Naseri, M. R. (2012). Production scheduling with outsourcing scenarios: A mixed integer programming and efficient solution procedure. International Journal of Production Research, 50(19), 5372–5395.
    • (2012) International Journal of Production Research , vol.50 , Issue.19 , pp. 5372-5395
    • Mokhtari, H.1    Abadi, I.N.K.2    Amin-Naseri, M.R.3
  • 20
    • 27744470759 scopus 로고    scopus 로고
    • An integrated approach for production and distribution planning in supply chain management
    • Park, Y. B. (2005). An integrated approach for production and distribution planning in supply chain management. International Journal of Production Research, 43(6), 1205–1224.
    • (2005) International Journal of Production Research , vol.43 , Issue.6 , pp. 1205-1224
    • Park, Y.B.1
  • 21
    • 84855939615 scopus 로고    scopus 로고
    • Integrated production planning and scheduling optimization of multisite, multiproduct process industry
    • Shah, N. K., & Ierapetritou, M. G. (2012). Integrated production planning and scheduling optimization of multisite, multiproduct process industry. Computers and Chemical Engineering, 37, 214–226.
    • (2012) Computers and Chemical Engineering , vol.37 , pp. 214-226
    • Shah, N.K.1    Ierapetritou, M.G.2
  • 22
    • 80053009723 scopus 로고    scopus 로고
    • An approach to integrate production–transportation planning and scheduling in an aluminium supply chain network
    • Steinrücke, M. (2011). An approach to integrate production–transportation planning and scheduling in an aluminium supply chain network. International Journal of Production Research, 49(21), 6559–6583.
    • (2011) International Journal of Production Research , vol.49 , Issue.21 , pp. 6559-6583
    • Steinrücke, M.1
  • 23
    • 84938983159 scopus 로고    scopus 로고
    • Integrated production, distribution and scheduling in the aluminium industry: A continuous-time MILP model and decomposition method
    • Steinrücke, M. (2015). Integrated production, distribution and scheduling in the aluminium industry: A continuous-time MILP model and decomposition method. International Journal of Production Research, 53(19), 5912–5930.
    • (2015) International Journal of Production Research , vol.53 , Issue.19 , pp. 5912-5930
    • Steinrücke, M.1
  • 24
    • 84872961323 scopus 로고    scopus 로고
    • Integrated machine scheduling and vehicle routing with time windows
    • Ullrich, C. A. (2013). Integrated machine scheduling and vehicle routing with time windows. European Journal of Operational Research, 227(1), 152–165.
    • (2013) European Journal of Operational Research , vol.227 , Issue.1 , pp. 152-165
    • Ullrich, C.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.