-
1
-
-
84871258510
-
A continuous-time MILP model for short-term scheduling of make-and-pack production processes
-
Baumann, P., & Trautmann, N. (2013). A continuous-time MILP model for short-term scheduling of make-and-pack production processes. International Journal of Production Research, 51(6), 1707–1727.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.6
, pp. 1707-1727
-
-
Baumann, P.1
Trautmann, N.2
-
2
-
-
84880507064
-
Applied column generation-based approach to solve supply chain scheduling problems
-
Chang, Y.-C., Chang, K.-H., & Chang, T.-K. (2013). Applied column generation-based approach to solve supply chain scheduling problems. International Journal of Production Research, 51(13), 4070–4086.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.13
, pp. 4070-4086
-
-
Chang, Y.-C.1
Chang, K.-H.2
Chang, T.-K.3
-
3
-
-
0032661559
-
Integrated production/distribution planning in supply chains: An invited review
-
Erengüç, Ş., Simpson, N. C., & Vakharia, A. J. (1999). Integrated production/distribution planning in supply chains: An invited review. European Journal of Operational Research, 115(2), 219–236.
-
(1999)
European Journal of Operational Research
, vol.115
, Issue.2
, pp. 219-236
-
-
Erengüç, Ş.1
Simpson, N.C.2
Vakharia, A.J.3
-
4
-
-
2442583184
-
Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
-
Floudas, C. A., & Lin, X. (2004). Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review. Computers and Chemical Engineering, 28, 2109–2129.
-
(2004)
Computers and Chemical Engineering
, vol.28
, pp. 2109-2129
-
-
Floudas, C.A.1
Lin, X.2
-
5
-
-
85018158108
-
-
Washington, DC: GAMS Development Corporation
-
GAMS. (2015). GAMS documentation 24.5. Washington, DC: GAMS Development Corporation. http://www.gams.com/help/index.jsp.
-
(2015)
GAMS documentation 24.5
-
-
-
6
-
-
84884906236
-
Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: A mathematical programming approach
-
Gomes, M. C., Barbosa-Póvoa, A., & Novais, A. Q. (2013). Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: A mathematical programming approach. International Journal of Production Research, 51(17), 5120–5141.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.17
, pp. 5120-5141
-
-
Gomes, M.C.1
Barbosa-Póvoa, A.2
Novais, A.Q.3
-
7
-
-
30344444492
-
Simultaneous optimization of process operations and financial decisions to enhance the integrated planning/scheduling of chemical supply chains
-
Guillén-Gosálbez, G., Badell, M., Espuña, A., & Puigjaner, L. (2006). Simultaneous optimization of process operations and financial decisions to enhance the integrated planning/scheduling of chemical supply chains. Computers & Chemical Engineering, 30, 421–436.
-
(2006)
Computers & Chemical Engineering
, vol.30
, pp. 421-436
-
-
Guillén-Gosálbez, G.1
Badell, M.2
Espuña, A.3
Puigjaner, L.4
-
8
-
-
85012283629
-
The block planning approach for continuous time-based dynamic lot sizing and scheduling
-
Günther, H. O. (2014). The block planning approach for continuous time-based dynamic lot sizing and scheduling. Business Research, 7(1), 51–76.
-
(2014)
Business Research
, vol.7
, Issue.1
, pp. 51-76
-
-
Günther, H.O.1
-
9
-
-
84863213543
-
Value-based performance and risk management in supply chains: A robust optimization approach
-
Hahn, G. J., & Kuhn, H. (2011). Value-based performance and risk management in supply chains: A robust optimization approach. International Journal of Production Economics, 139(1), 135–144.
-
(2011)
International Journal of Production Economics
, vol.139
, Issue.1
, pp. 135-144
-
-
Hahn, G.J.1
Kuhn, H.2
-
10
-
-
0034976636
-
Planning and coordination of production and distribution facilities for multiple commodities
-
Jayaraman, V., & Pirkul, H. (2001). Planning and coordination of production and distribution facilities for multiple commodities. European Journal of Operational Research, 133(2), 394–408.
-
(2001)
European Journal of Operational Research
, vol.133
, Issue.2
, pp. 394-408
-
-
Jayaraman, V.1
Pirkul, H.2
-
11
-
-
36348991493
-
Enhancing corporate value in the optimal design of chemical supply chains
-
Laínez, J. M., Guillén-Gosálbez, G., Badell, M., Espuña, A., & Puigjaner, L. (2007). Enhancing corporate value in the optimal design of chemical supply chains. Industrial & Engineering Chemistry Research, 46, 7739–7757.
-
(2007)
Industrial & Engineering Chemistry Research
, vol.46
, pp. 7739-7757
-
-
Laínez, J.M.1
Guillén-Gosálbez, G.2
Badell, M.3
Espuña, A.4
Puigjaner, L.5
-
12
-
-
0036642937
-
Production–distribution planning in supply chain considering capacity constraints
-
Lee, Y. H., & Kim, S. H. (2002). Production–distribution planning in supply chain considering capacity constraints. Computers & Industrial Engineering, 43(1–2), 169–190.
-
(2002)
Computers & Industrial Engineering
, vol.43
, Issue.1-2
, pp. 169-190
-
-
Lee, Y.H.1
Kim, S.H.2
-
13
-
-
67649756833
-
Integrated production planning and scheduling using a decomposition framework
-
Li, Z., & Ierapetritou, M. G. (2009). Integrated production planning and scheduling using a decomposition framework. Chemical Engineering Science, 64(16), 3585–3597.
-
(2009)
Chemical Engineering Science
, vol.64
, Issue.16
, pp. 3585-3597
-
-
Li, Z.1
Ierapetritou, M.G.2
-
14
-
-
84871187974
-
Integrated scheduling of production and delivery with time windows
-
Low, C., Li, R.-K., & Chang, C.-M. (2013). Integrated scheduling of production and delivery with time windows. International Journal of Production Research, 51(3), 897–909.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.3
, pp. 897-909
-
-
Low, C.1
Li, R.-K.2
Chang, C.-M.3
-
16
-
-
0033037070
-
Continuous time representation approach to batch and continuous process scheduling. 1. MINLP formulation
-
Mockus, L., & Reklaitis, G. V. (1999). Continuous time representation approach to batch and continuous process scheduling. 1. MINLP formulation. Industrial & Engineering Chemistry Research, 38, 197–203.
-
(1999)
Industrial & Engineering Chemistry Research
, vol.38
, pp. 197-203
-
-
Mockus, L.1
Reklaitis, G.V.2
-
17
-
-
84867089231
-
A multi-objective optimisation model to integrating flexible process planning and scheduling based on hybrid multi-objective simulated annealing
-
Mohammadi, G., Karampourhaghghi, A., & Samaei, F. (2012). A multi-objective optimisation model to integrating flexible process planning and scheduling based on hybrid multi-objective simulated annealing. International Journal of Production Research, 50(18), 5063–5076.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.18
, pp. 5063-5076
-
-
Mohammadi, G.1
Karampourhaghghi, A.2
Samaei, F.3
-
18
-
-
84926149311
-
-
Woodhead Publishing, Cambridge
-
Moir, L. (1997). Managing liquidity (2nd ed.). Cambridge: Woodhead Publishing.
-
(1997)
Managing liquidity
-
-
Moir, L.1
-
19
-
-
84867072505
-
Production scheduling with outsourcing scenarios: A mixed integer programming and efficient solution procedure
-
Mokhtari, H., Abadi, I. N. K., & Amin-Naseri, M. R. (2012). Production scheduling with outsourcing scenarios: A mixed integer programming and efficient solution procedure. International Journal of Production Research, 50(19), 5372–5395.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.19
, pp. 5372-5395
-
-
Mokhtari, H.1
Abadi, I.N.K.2
Amin-Naseri, M.R.3
-
20
-
-
27744470759
-
An integrated approach for production and distribution planning in supply chain management
-
Park, Y. B. (2005). An integrated approach for production and distribution planning in supply chain management. International Journal of Production Research, 43(6), 1205–1224.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.6
, pp. 1205-1224
-
-
Park, Y.B.1
-
21
-
-
84855939615
-
Integrated production planning and scheduling optimization of multisite, multiproduct process industry
-
Shah, N. K., & Ierapetritou, M. G. (2012). Integrated production planning and scheduling optimization of multisite, multiproduct process industry. Computers and Chemical Engineering, 37, 214–226.
-
(2012)
Computers and Chemical Engineering
, vol.37
, pp. 214-226
-
-
Shah, N.K.1
Ierapetritou, M.G.2
-
22
-
-
80053009723
-
An approach to integrate production–transportation planning and scheduling in an aluminium supply chain network
-
Steinrücke, M. (2011). An approach to integrate production–transportation planning and scheduling in an aluminium supply chain network. International Journal of Production Research, 49(21), 6559–6583.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.21
, pp. 6559-6583
-
-
Steinrücke, M.1
-
23
-
-
84938983159
-
Integrated production, distribution and scheduling in the aluminium industry: A continuous-time MILP model and decomposition method
-
Steinrücke, M. (2015). Integrated production, distribution and scheduling in the aluminium industry: A continuous-time MILP model and decomposition method. International Journal of Production Research, 53(19), 5912–5930.
-
(2015)
International Journal of Production Research
, vol.53
, Issue.19
, pp. 5912-5930
-
-
Steinrücke, M.1
-
24
-
-
84872961323
-
Integrated machine scheduling and vehicle routing with time windows
-
Ullrich, C. A. (2013). Integrated machine scheduling and vehicle routing with time windows. European Journal of Operational Research, 227(1), 152–165.
-
(2013)
European Journal of Operational Research
, vol.227
, Issue.1
, pp. 152-165
-
-
Ullrich, C.A.1
|