메뉴 건너뛰기




Volumn 54, Issue 13, 2016, Pages 3837-3851

Designing a supply chain network for deteriorating inventory under preservation effort and trade credits

Author keywords

inventory; piecewise nonlinear optimisation; preservation effort; supply chain network design; trade credit

Indexed keywords

DETERIORATION; NONLINEAR PROGRAMMING; PROFITABILITY; RETAIL STORES; SUPPLY CHAINS;

EID: 84961205547     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2016.1157272     Document Type: Article
Times cited : (40)

References (38)
  • 1
    • 21844488130 scopus 로고
    • Ordering Policies of Deteriorating Items under Permissible Delay in Payments
    • S.P.Aggarwal,, and C.K.Jaggi. 1995. “Ordering Policies of Deteriorating Items under Permissible Delay in Payments.” Journal of the Operational Research Society 46: 658–662.10.1057/jors.1995.90
    • (1995) Journal of the Operational Research Society , vol.46 , pp. 658-662
    • Aggarwal, S.P.1    Jaggi, C.K.2
  • 2
    • 0035296729 scopus 로고    scopus 로고
    • An Inventory Model for Deteriorating Items with Partial Backlogging and Permissible Delay in Payments
    • H.J.Chang,, and C.Y.Dye. 2001. “An Inventory Model for Deteriorating Items with Partial Backlogging and Permissible Delay in Payments.” International Journal of Systems Science 32: 345–352.10.1080/002077201300029700
    • (2001) International Journal of Systems Science , vol.32 , pp. 345-352
    • Chang, H.J.1    Dye, C.Y.2
  • 3
    • 77955470503 scopus 로고    scopus 로고
    • Optimal Manufacturer’s Replenishment Policies for Deteriorating Items in a Supply Chain with Up-stream and Down-stream Trade Credits
    • C.T.Chang,, J.T.Teng, and M.S.Chern. 2010. “Optimal Manufacturer’s Replenishment Policies for Deteriorating Items in a Supply Chain with Up-stream and Down-stream Trade Credits.” International Journal of Production Economics 127: 197–202.10.1016/j.ijpe.2010.05.014
    • (2010) International Journal of Production Economics , vol.127 , pp. 197-202
    • Chang, C.T.1    Teng, J.T.2    Chern, M.S.3
  • 4
    • 84955743681 scopus 로고    scopus 로고
    • Optimal Pricing and Ordering Policies for Non-instantaneously Deteriorating Items under Order-size-dependent Delay in Payments
    • C.T.Chang,, M.C.Cheng, and L.Y.Ouyang. 2015. “Optimal Pricing and Ordering Policies for Non-instantaneously Deteriorating Items under Order-size-dependent Delay in Payments.” Applied Mathematical Modelling 39: 747–763.10.1016/j.apm.2014.07.002
    • (2015) Applied Mathematical Modelling , vol.39 , pp. 747-763
    • Chang, C.T.1    Cheng, M.C.2    Ouyang, L.Y.3
  • 5
    • 0031634279 scopus 로고    scopus 로고
    • A Theorem on the Determination of Economic Order Quantity under Conditions of Permissible Delay in Payments
    • K.J.Chung, 1998. “A Theorem on the Determination of Economic Order Quantity under Conditions of Permissible Delay in Payments.” Computers and Operations Research 25: 49–52.10.1016/S0305-0548(98)80007-5
    • (1998) Computers and Operations Research , vol.25 , pp. 49-52
    • Chung, K.J.1
  • 6
    • 0141642563 scopus 로고    scopus 로고
    • The Optimal Cycle Time for Exponentially Deteriorating Products under Trade Credit Financing
    • K.J.Chung,, S.L.Chang, and W.D.Yang. 2001. “The Optimal Cycle Time for Exponentially Deteriorating Products under Trade Credit Financing.” The Engineering Economist 46: 232–242.10.1080/00137910108967575
    • (2001) The Engineering Economist , vol.46 , pp. 232-242
    • Chung, K.J.1    Chang, S.L.2    Yang, W.D.3
  • 8
    • 0035284147 scopus 로고    scopus 로고
    • A Continuous Model for Production-distribution System Design
    • A.Dasci,, and V.Verter. 2001. “A Continuous Model for Production-distribution System Design.” European Journal of Operational Research 129: 287–298.10.1016/S0377-2217(00)00226-5
    • (2001) European Journal of Operational Research , vol.129 , pp. 287-298
    • Dasci, A.1    Verter, V.2
  • 9
    • 84861152683 scopus 로고    scopus 로고
    • Two Level Supply Chain Coordination with Delay in Payments for Fixed Lifetime Products
    • Y.Duan,, J.Huo, Y.Zhang, and J.Zhang. 2012. “Two Level Supply Chain Coordination with Delay in Payments for Fixed Lifetime Products.” Computers and Industrial Engineering 63: 456–463.
    • (2012) Computers and Industrial Engineering , vol.63 , pp. 456-463
    • Duan, Y.1    Huo, J.2    Zhang, Y.3    Zhang, J.4
  • 10
    • 84871732659 scopus 로고    scopus 로고
    • The Effect of Preservation Technology Investment on a Non-instantaneous Deteriorating Inventory Model
    • C.Y.Dye, 2013. “The Effect of Preservation Technology Investment on a Non-instantaneous Deteriorating Inventory Model.” Omega 41: 872–880.10.1016/j.omega.2012.11.002
    • (2013) Omega , vol.41 , pp. 872-880
    • Dye, C.Y.1
  • 11
    • 83955162262 scopus 로고    scopus 로고
    • An Optimal Replenishment Policy for Deteriorating Items with Effective Investment in Preservation Technology
    • C.Y.Dye,, and T.P.Hsieh. 2012. “An Optimal Replenishment Policy for Deteriorating Items with Effective Investment in Preservation Technology.” European Journal of Operational Research 218: 106–112.10.1016/j.ejor.2011.10.016
    • (2012) European Journal of Operational Research , vol.218 , pp. 106-112
    • Dye, C.Y.1    Hsieh, T.P.2
  • 12
    • 84878516128 scopus 로고    scopus 로고
    • A Particle Swarm Optimization for Solving Lot-sizing Problem with Fluctuating Demand and Preservation Technology Cost under Trade Credit
    • C.Y.Dye,, and T.P.Hsieh. 2013. “A Particle Swarm Optimization for Solving Lot-sizing Problem with Fluctuating Demand and Preservation Technology Cost under Trade Credit.” Journal of Global Optimization 55: 655–679.10.1007/s10898-012-9950-z
    • (2013) Journal of Global Optimization , vol.55 , pp. 655-679
    • Dye, C.Y.1    Hsieh, T.P.2
  • 13
    • 34249964510 scopus 로고
    • The General Optimal Market Area Model
    • D.Erlenkotter, 1989. “The General Optimal Market Area Model.” Annals of Operations Research 18: 45–70.
    • (1989) Annals of Operations Research , vol.18 , pp. 45-70
    • Erlenkotter, D.1
  • 14
    • 0003879857 scopus 로고
    • The Purpose of Mathematical Programming is Insight, Not Numbers
    • A.M.Geoffrion, 1976. “The Purpose of Mathematical Programming is Insight, Not Numbers.” Interfaces 7: 81–92.10.1287/inte.7.1.81
    • (1976) Interfaces , vol.7 , pp. 81-92
    • Geoffrion, A.M.1
  • 15
    • 0022045262 scopus 로고
    • Economic Order Quantity under Conditions of Permissible Delay in Payments
    • S.K.Goyal, 1985. “Economic Order Quantity under Conditions of Permissible Delay in Payments.” Journal of the Operational Research Society 36: 335–338.10.1057/jors.1985.56
    • (1985) Journal of the Operational Research Society , vol.36 , pp. 335-338
    • Goyal, S.K.1
  • 16
    • 76349122665 scopus 로고    scopus 로고
    • Preservation Technology Investment for Deteriorating Inventory
    • P.Hsu,, H.Wee, and H.Teng. 2010. “Preservation Technology Investment for Deteriorating Inventory.” International Journal of Production Economics 124: 388–394.10.1016/j.ijpe.2009.11.034
    • (2010) International Journal of Production Economics , vol.124 , pp. 388-394
    • Hsu, P.1    Wee, H.2    Teng, H.3
  • 17
    • 0031170331 scopus 로고    scopus 로고
    • Retailer’s Pricing and Lot Sizing Policy for Exponentially Deteriorating Products under the Condition of Permissible Delay in Payments
    • H.Hwang,, and S.W.Shinn. 1997. “Retailer’s Pricing and Lot Sizing Policy for Exponentially Deteriorating Products under the Condition of Permissible Delay in Payments.” Computers and Operations Research 24: 539–547.10.1016/S0305-0548(96)00069-X
    • (1997) Computers and Operations Research , vol.24 , pp. 539-547
    • Hwang, H.1    Shinn, S.W.2
  • 18
    • 0031200313 scopus 로고    scopus 로고
    • An Ordering Policy for Deteriorating Items with Allowable Shortage and Permissible Delay in Payment
    • A.M.M.Jamal,, B.R.Sarker, and S.Wang. 1997. “An Ordering Policy for Deteriorating Items with Allowable Shortage and Permissible Delay in Payment.” Journal of the Operational Research Society 48: 826–833.10.1057/palgrave.jors.2600428
    • (1997) Journal of the Operational Research Society , vol.48 , pp. 826-833
    • Jamal, A.M.M.1    Sarker, B.R.2    Wang, S.3
  • 20
    • 77549084109 scopus 로고    scopus 로고
    • A Continuum Approximation Approach to Reliable Facility Location Design under Correlated Probabilistic Disruptions
    • X.Li,, and Y.Ouyang. 2010. “A Continuum Approximation Approach to Reliable Facility Location Design under Correlated Probabilistic Disruptions.” Transportation Research Part B: Methodological 44: 535–548.10.1016/j.trb.2009.09.004
    • (2010) Transportation Research Part B: Methodological , vol.44 , pp. 535-548
    • Li, X.1    Ouyang, Y.2
  • 21
    • 84858069450 scopus 로고    scopus 로고
    • Lot-sizing Decisions for Deteriorating Items with Two Warehouses under an Order-size-dependent Trade Credit
    • J.J.Liao,, K.N.Huang, and K.J.Chung. 2012. “Lot-sizing Decisions for Deteriorating Items with Two Warehouses under an Order-size-dependent Trade Credit.” International Journal of Production Economics 137: 102–115.10.1016/j.ijpe.2012.01.020
    • (2012) International Journal of Production Economics , vol.137 , pp. 102-115
    • Liao, J.J.1    Huang, K.N.2    Chung, K.J.3
  • 22
    • 68249115966 scopus 로고    scopus 로고
    • A Continuous Analysis Framework for the Solution of Location-allocation Problems with Dense Demand
    • A.Murat,, V.Verter, and G.Laporte. 2010. “A Continuous Analysis Framework for the Solution of Location-allocation Problems with Dense Demand.” Computers and Operations Research 37: 123–136.10.1016/j.cor.2009.04.001
    • (2010) Computers and Operations Research , vol.37 , pp. 123-136
    • Murat, A.1    Verter, V.2    Laporte, G.3
  • 23
    • 77956415941 scopus 로고    scopus 로고
    • A Multi-dimensional Shooting Algorithm for the Two-facility Location-allocation Problem with Dense Demand
    • A.Murat,, V.Verter, and G.Laporte. 2011. “A Multi-dimensional Shooting Algorithm for the Two-facility Location-allocation Problem with Dense Demand.” Computers and Operations Research 38: 450–463.10.1016/j.cor.2010.07.003
    • (2011) Computers and Operations Research , vol.38 , pp. 450-463
    • Murat, A.1    Verter, V.2    Laporte, G.3
  • 24
    • 0041353057 scopus 로고
    • Scheduling, Location, Transportation and Continuum Mechanics: Some Simple Approximations to Optimization Problems
    • G.F.Newell, 1973. “Scheduling, Location, Transportation and Continuum Mechanics: Some Simple Approximations to Optimization Problems.” SIAM Journal of Applied Mathematics 25 (3): 346–360.
    • (1973) SIAM Journal of Applied Mathematics , vol.25 , Issue.3 , pp. 346-360
    • Newell, G.F.1
  • 25
    • 33144481147 scopus 로고    scopus 로고
    • Optimal Ordering Policy for Deteriorating Items with Partial Backlogging under Permissible Delay in Payments
    • L.Y.Ouyang,, J.T.Teng, and L.H.Chen. 2006. “Optimal Ordering Policy for Deteriorating Items with Partial Backlogging under Permissible Delay in Payments.” Journal of Global Optimization 34: 245–271.10.1007/s10898-005-2604-7
    • (2006) Journal of Global Optimization , vol.34 , pp. 245-271
    • Ouyang, L.Y.1    Teng, J.T.2    Chen, L.H.3
  • 26
    • 54449091616 scopus 로고    scopus 로고
    • An Economic Order Quantity Model for Deteriorating Items with Partially Permissible Delay in Payments Linked to Order Quantity
    • L.Y.Ouyang,, J.T.Teng, S.K.Goyal, and C.T.Yang. 2009. “An Economic Order Quantity Model for Deteriorating Items with Partially Permissible Delay in Payments Linked to Order Quantity.” European Journal of Operational Research 194: 418–431.10.1016/j.ejor.2007.12.018
    • (2009) European Journal of Operational Research , vol.194 , pp. 418-431
    • Ouyang, L.Y.1    Teng, J.T.2    Goyal, S.K.3    Yang, C.T.4
  • 27
    • 35349018369 scopus 로고    scopus 로고
    • A Continuous Approximation Procedure for Determining Inventory Distribution Schemas within Supply Chains
    • N.Pujari,, T.S.Hale, and F.Huq. 2008. “A Continuous Approximation Procedure for Determining Inventory Distribution Schemas within Supply Chains.” European Journal of Operational Research 186: 405–422.10.1016/j.ejor.2007.01.030
    • (2008) European Journal of Operational Research , vol.186 , pp. 405-422
    • Pujari, N.1    Hale, T.S.2    Huq, F.3
  • 28
    • 84880572147 scopus 로고    scopus 로고
    • A Review of Trade Credit Literature: Opportunities for Research in Operations
    • D.Seifert,, R.W.Seifert, and M.Protopappa-Sieke. 2013. “A Review of Trade Credit Literature: Opportunities for Research in Operations.” European Journal of Operational Research 231: 245–256.10.1016/j.ejor.2013.03.016
    • (2013) European Journal of Operational Research , vol.231 , pp. 245-256
    • Seifert, D.1    Seifert, R.W.2    Protopappa-Sieke, M.3
  • 29
    • 84866976436 scopus 로고    scopus 로고
    • An EOQ Model with Partial Delayed Payment and Partial Backordering
    • A.A.Taleizadeh,, D.W.Pentico, M.S.Jabalameli, and M.Aryanezhad. 2013. “An EOQ Model with Partial Delayed Payment and Partial Backordering.” Omega 41: 354–368.10.1016/j.omega.2012.03.008
    • (2013) Omega , vol.41 , pp. 354-368
    • Taleizadeh, A.A.1    Pentico, D.W.2    Jabalameli, M.S.3    Aryanezhad, M.4
  • 30
    • 0036682157 scopus 로고    scopus 로고
    • On the Economic Order Quantity under Conditions of Permissible Delay in Payments
    • J.T.Teng, 2002. “On the Economic Order Quantity under Conditions of Permissible Delay in Payments.” Journal of the Operational Research Society 53: 915–918.10.1057/palgrave.jors.2601410
    • (2002) Journal of the Operational Research Society , vol.53 , pp. 915-918
    • Teng, J.T.1
  • 31
    • 85027934014 scopus 로고    scopus 로고
    • Seller’s Optimal Credit Period and Replenishment Time in a Supply Chain with Up-stream and Down-stream Trade Credits
    • J.T.Teng,, and K.R.Lou. 2012. “Seller’s Optimal Credit Period and Replenishment Time in a Supply Chain with Up-stream and Down-stream Trade Credits.” Journal of Global Optimization 53: 417–430.10.1007/s10898-011-9720-3
    • (2012) Journal of Global Optimization , vol.53 , pp. 417-430
    • Teng, J.T.1    Lou, K.R.2
  • 32
    • 80052543129 scopus 로고    scopus 로고
    • Economic Order Quantity Model with Trade Credit Financing for Non-decreasing Demand
    • J.T.Teng,, J.Min, and Q.Pan. 2012. “Economic Order Quantity Model with Trade Credit Financing for Non-decreasing Demand.” Omega 40: 328–335.10.1016/j.omega.2011.08.001
    • (2012) Omega , vol.40 , pp. 328-335
    • Teng, J.T.1    Min, J.2    Pan, Q.3
  • 34
    • 41149087870 scopus 로고    scopus 로고
    • Dynamic Pricing, Promotion and Replenishment Policies for a Deteriorating Item under Permissible Delay in Payments
    • Y.C.Tsao,, and G.J.Sheen. 2008. “Dynamic Pricing, Promotion and Replenishment Policies for a Deteriorating Item under Permissible Delay in Payments.” Computers and Operations Research 35: 3562–3580.10.1016/j.cor.2007.01.024
    • (2008) Computers and Operations Research , vol.35 , pp. 3562-3580
    • Tsao, Y.C.1    Sheen, G.J.2
  • 35
    • 80055030659 scopus 로고    scopus 로고
    • A Multi-item Supply Chain with Credit Periods and Weight Freight Cost Discounts
    • Y.C.Tsao,, and G.J.Sheen. 2012. “A Multi-item Supply Chain with Credit Periods and Weight Freight Cost Discounts.” International Journal of Production Economics 135: 106–115.10.1016/j.ijpe.2010.11.013
    • (2012) International Journal of Production Economics , vol.135 , pp. 106-115
    • Tsao, Y.C.1    Sheen, G.J.2
  • 36
    • 84871232766 scopus 로고    scopus 로고
    • Heuristics for the Joint Multi-item Replenishment Problem under Trade Credits
    • Y.C.Tsao,, and W.G.Teng. 2013. “Heuristics for the Joint Multi-item Replenishment Problem under Trade Credits.” IMA Journal of Management Mathematics 24: 63–77.10.1093/imaman/dps004
    • (2013) IMA Journal of Management Mathematics , vol.24 , pp. 63-77
    • Tsao, Y.C.1    Teng, W.G.2
  • 37
    • 84862270483 scopus 로고    scopus 로고
    • A Continuous Approximation Approach for the Integrated Facility-inventory Allocation Problem
    • Y.C.Tsao,, D.Mangotra, J.C.Lu, and M.Dong. 2012. “A Continuous Approximation Approach for the Integrated Facility-inventory Allocation Problem.” European Journal of Operational Research 222: 216–228.10.1016/j.ejor.2012.04.033
    • (2012) European Journal of Operational Research , vol.222 , pp. 216-228
    • Tsao, Y.C.1    Mangotra, D.2    Lu, J.C.3    Dong, M.4
  • 38
    • 84871251052 scopus 로고    scopus 로고
    • Effects of Maintenance Policy on an Imperfect Production System under Trade Credit
    • Y.C.Tsao,, T.H.Chen, and Q.H.Zhang. 2013. “Effects of Maintenance Policy on an Imperfect Production System under Trade Credit.” International Journal of Production Research 51: 1549–1562.10.1080/00207543.2012.714001
    • (2013) International Journal of Production Research , vol.51 , pp. 1549-1562
    • Tsao, Y.C.1    Chen, T.H.2    Zhang, Q.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.