-
1
-
-
81855226045
-
A review of solar photovoltaic levelized cost of electricity
-
K. Branker, M. Pathak, and J. M. Pearce, "A review of solar photovoltaic levelized cost of electricity," Renew. Sustain. Energy Rev., vol. 15, no. 9, pp. 4470-4482, 2011.
-
(2011)
Renew. Sustain. Energy Rev
, vol.15
, Issue.9
, pp. 4470-4482
-
-
Branker, K.1
Pathak, M.2
Pearce, J.M.3
-
2
-
-
21744440780
-
Hedging carbon risk: Protecting customers and shareholders from the financial risk associated with carbon dioxide emissions
-
K. Bokenkamp, H. LaFlash, V. Singh, and D. Bachrach Wang, "Hedging carbon risk: Protecting customers and shareholders from the financial risk associated with carbon dioxide emissions," Elect. J., vol. 18, no. 6, pp. 11-24, 2005.
-
(2005)
Elect. J
, vol.18
, Issue.6
, pp. 11-24
-
-
Bokenkamp, K.1
LaFlash, H.2
Singh, V.3
Bachrach Wang, D.4
-
3
-
-
60049097632
-
Renewables portfolio standards in the United States
-
Berkeley, CA, USA, Tech. Rep. LBLN-154E
-
R. Wiser and G. Barbose, "Renewables portfolio standards in the United States," LBNL, Berkeley, CA, USA, Tech. Rep. LBLN-154E, 2008 [Online]. Available: http://eetd.lbl.gov/ea/ems/reports/lbnl-154e.pdf
-
(2008)
LBNL
-
-
Wiser, R.1
Barbose, G.2
-
4
-
-
79957648103
-
Supporting solar power in renewables portfolio standards: Experience from the United States
-
R.Wiser, G. Barbose, and E. Holt, "Supporting solar power in renewables portfolio standards: Experience from the United States," Energy Policy, vol. 39, no. 7, pp. 3894-3905, 2011.
-
(2011)
Energy Policy
, vol.39
, Issue.7
, pp. 3894-3905
-
-
Wiser, R.1
Barbose, G.2
Holt, E.3
-
5
-
-
74949123752
-
Tracking the Sun VII: An historical summary of the installed cost of photovoltaics in the United States from 1998 to 2013
-
Berkeley, CA, USA, Tech. Rep. LBNL-6858e
-
G. Barbose, N. Darghouth, and S. Weaver, "Tracking the Sun VII: An historical summary of the installed cost of photovoltaics in the United States from 1998 to 2013," LBNL, Berkeley, CA, USA, Tech. Rep. LBNL-6858e, 2014 [Online]. Available: http://emp.lbl.gov/sites/all/files/LBNL-6808e-0.pdf
-
(2014)
LBNL
-
-
Barbose, G.1
Darghouth, N.2
Weaver, S.3
-
6
-
-
84875797891
-
Photovoltaic system pricing trends: Historical, recent, and near-Term projections 2014 edition
-
Golden, CO, USA, Tech. Rep. NREL/PR-6A20-62558
-
D. Feldman et al., "Photovoltaic system pricing trends: Historical, recent, and near-Term projections 2014 edition," NREL, Golden, CO, USA, Tech. Rep. NREL/PR-6A20-62558, 2014 [Online]. Available: http://www.nrel. gov/docs/fy14osti/62558.pdf
-
(2014)
NREL
-
-
Feldman, D.1
-
7
-
-
84960245004
-
-
Solar market insight report 2014 Q2, SEIA, Washington, DC, USA, Tech. Rep
-
Solar Energy Industries Association (SEIA), "Solar market insight report 2014 Q2," SEIA, Washington, DC, USA, Tech. Rep., 2014 [Online]. Available: http://www.seia.org/research-resources/solar-market-insightreport-2014-q2
-
(2014)
Solar Energy Industries Association (SEIA
-
-
-
8
-
-
84886910449
-
An evaluation of solar valuation methods used in utility planning and procurement processes
-
Berkeley, CA, USA, Tech. Rep. LBNL-5933e
-
A. Mills and R. Wiser, "An evaluation of solar valuation methods used in utility planning and procurement processes," LBNL, Berkeley, CA, USA, Tech. Rep. LBNL-5933e, 2012 [Online]. Available: http://emp.lbl.gov/sites/all/files/lbnl-5933e-0.pdf
-
(2012)
LBNL
-
-
Mills, A.1
Wiser, R.2
-
9
-
-
0003776432
-
-
New York, NY, USA, Plenum
-
R. Billinton, R. N. Allan, and R. N. Allan, Reliability Evaluation of Power Systems. New York, NY, USA: Plenum, 1984, vol. 2.
-
(1984)
Reliability Evaluation of Power Systems
, vol.2
-
-
Billinton, R.1
Allan, R.N.2
Allan, R.N.3
-
10
-
-
84870583283
-
Methods to model and calculate capacity contributions of variable generation for resource adequacy planning
-
Swindon, U.K., Tech. Rep. NREL/PR-5500-51485
-
Michael Milligan, "Methods to model and calculate capacity contributions of variable generation for resource adequacy planning," NERC, Swindon, U.K., Tech. Rep. NREL/PR-5500-51485, 2011 [Online]. Available: http://www.nerc.com/files/ivgtf1-2.pdf
-
(2011)
NERC
-
-
Milligan, M.1
-
11
-
-
84871766924
-
Comparing capacity value estimation techniques for photovoltaic solar power
-
Jan
-
S. H. Madaeni, R. Sioshansi, and P. Denholm, "Comparing capacity value estimation techniques for photovoltaic solar power," IEEE J. Photovoltaics, vol. 3, no. 1, pp. 407-415, Jan. 2013.
-
(2013)
IEEE J. Photovoltaics
, vol.3
, Issue.1
, pp. 407-415
-
-
Madaeni, S.H.1
Sioshansi, R.2
Denholm, P.3
-
12
-
-
84868614082
-
Effective load carrying capability of generating units
-
Aug
-
L. L. Garver, "Effective load carrying capability of generating units," IEEE Trans. Power App. Syst., vol. 85, no. 8, pp. 910-919, Aug. 1966.
-
(1966)
IEEE Trans. Power App. Syst
, vol.85
, Issue.8
, pp. 910-919
-
-
Garver, L.L.1
-
13
-
-
44349111315
-
Noniterative method to approximate the effective load carrying capability of a wind plant
-
Jun
-
C. D'Annunzio and S. Santoso, "Noniterative method to approximate the effective load carrying capability of a wind plant," IEEE Trans. Energy Convers., vol. 23, no. 2, pp. 544-550, Jun. 2008.
-
(2008)
IEEE Trans. Energy Convers
, vol.23
, Issue.2
, pp. 544-550
-
-
D'Annunzio, C.1
Santoso, S.2
-
14
-
-
33646348455
-
Z-method for power system resource adequacy a applications
-
May
-
K. Dragoon and V. Dvortsov, "Z-method for power system resource adequacy a applications," IEEE Trans. Power Syst., vol. 21, no. 2, pp. 982-988, May 2006.
-
(2006)
IEEE Trans. Power Syst
, vol.21
, Issue.2
, pp. 982-988
-
-
Dragoon, K.1
Dvortsov, V.2
-
15
-
-
33747612036
-
A comparison and case study of capacity credit algorithms for intermittent generators
-
M. R. Milligan and B. K. Parsons, "A comparison and case study of capacity credit algorithms for intermittent generators," NREL, Golden, CO, USA, Tech. Rep. NREL/CP-440-22591, 1997 [Online]. Available: www.nrel.gov/docs/legosti/fy97/22591.pdf
-
(1997)
NREL, Golden, CO, USA, Tech. Rep. NREL/CP
, pp. 440-22591
-
-
Milligan, M.R.1
Parsons, B.K.2
-
16
-
-
32944472008
-
The capacity value of wind in the United States: Methods and implementation
-
M. Milligan and K. Porter, "The capacity value of wind in the United States: Methods and implementation," Elect. J., vol. 19, no. 2, pp. 91-99, 2006.
-
(2006)
Elect. J
, vol.19
, Issue.2
, pp. 91-99
-
-
Milligan, M.1
Porter, K.2
-
17
-
-
67650240595
-
Determining the capacity value of wind: An updated survey of methods and implementation
-
M. Milligan and K. Porter, "Determining the capacity value of wind: An updated survey of methods and implementation," in Proc. Wind Power, Houston, TX, 2008, pp. 1-27.
-
(2008)
Proc. Wind Power, Houston, TX
, pp. 1-27
-
-
Milligan, M.1
Porter, K.2
-
18
-
-
79151476838
-
Capacity value of wind power, calculation, and data requirements: The Irish power system case
-
Feb
-
B. Hasche, A. Keane, and M. O'Malley, "Capacity value of wind power, calculation, and data requirements: The Irish power system case," IEEE Trans. Power Syst., vol. 26, no. 1, pp. 420-430, Feb. 2011.
-
(2011)
IEEE Trans. Power Syst
, vol.26
, Issue.1
, pp. 420-430
-
-
Hasche, B.1
Keane, A.2
O'Malley, M.3
-
19
-
-
79955547624
-
Capacity value of wind power
-
May
-
A. Keane et al., "Capacity value of wind power," IEEE Trans. Power Syst., vol. 26, no. 2, pp. 564-572, May 2011.
-
(2011)
IEEE Trans. Power Syst
, vol.26
, Issue.2
, pp. 564-572
-
-
Keane, A.1
-
20
-
-
0020543409
-
Solving an electricity generating capacity expansion planning problem by generalized Benders' decomposition
-
J. A. Bloom, "Solving an electricity generating capacity expansion planning problem by generalized Benders' decomposition," Oper. Res., vol. 31, no. 1, pp. 84-100, 1983.
-
(1983)
Oper. Res
, vol.31
, Issue.1
, pp. 84-100
-
-
Bloom, J.A.1
-
21
-
-
0021389714
-
Long-range generation planning using generalized Benders' decomposition: Implementation and experience
-
J. A. Bloom, M. Caramanis, and L. Charny, "Long-range generation planning using generalized Benders' decomposition: Implementation and experience," Oper. Res., vol. 32, no. 2, pp. 290-313, 1984.
-
(1984)
Oper. Res
, vol.32
, Issue.2
, pp. 290-313
-
-
Bloom, J.A.1
Caramanis, M.2
Charny, L.3
-
22
-
-
84960304944
-
-
Electric Power Research Institute (EPRI) , version 10.0 EPRI, Palo Alto, CA, USA
-
Electric Power Research Institute (EPRI), "Electric generation expansion analysis system (EGEAS), version 10.0," EPRI, Palo Alto, CA, USA, 2014 [Online]. Available: http://www.epri.com/abstracts/Pages/ProductAbstract.aspx?ProductId=000000000001016192
-
(2014)
Electric Generation Expansion Analysis System (EGEAS)
-
-
-
23
-
-
43849088797
-
Reliability constrained multi-Area adequacy planning using stochastic programming with sample-Average approximations
-
May
-
P. Jirutitijaroen and C. Singh, "Reliability constrained multi-Area adequacy planning using stochastic programming with sample-Average approximations," IEEE Trans. Power Syst., vol. 23, no. 2, pp. 504-513, May 2008.
-
(2008)
IEEE Trans. Power Syst
, vol.23
, Issue.2
, pp. 504-513
-
-
Jirutitijaroen, P.1
Singh, C.2
-
24
-
-
77956341790
-
Multi-period multi-objective electricity generation expansion planning problem with Monte-Carlo simulation
-
H. Tekiner, D. W. Coit, and F. A. Felder, "Multi-period multi-objective electricity generation expansion planning problem with Monte-Carlo simulation," Elect. Power Syst. Res., vol. 80, no. 12, pp. 1394-1405, 2010.
-
(2010)
Elect. Power Syst. Res
, vol.80
, Issue.12
, pp. 1394-1405
-
-
Tekiner, H.1
Coit, D.W.2
Felder, F.A.3
-
25
-
-
0020781508
-
Analysis of non-dispatchable options in the generation expansion plan
-
Jul
-
M. Caramanis, "Analysis of non-dispatchable options in the generation expansion plan," IEEE Trans. Power App. Syst., vol. 102, no. 7, pp. 2098-2103, Jul. 1983.
-
(1983)
IEEE Trans. Power App. Syst
, vol.102
, Issue.7
, pp. 2098-2103
-
-
Caramanis, M.1
-
26
-
-
0022104851
-
Probabilistic production costing with dependent generating sources
-
Aug
-
J. A. Bloom, "Probabilistic production costing with dependent generating sources," IEEE Trans. Power App. Syst., vol. 5, no. 8, pp. 2064-2071, Aug. 1985.
-
(1985)
IEEE Trans. Power App. Syst
, vol.5
, Issue.8
, pp. 2064-2071
-
-
Bloom, J.A.1
-
27
-
-
84876451528
-
Approximations in power transmission planning: Implications for the cost and performance of renewable portfolio standards
-
F. D. Munoz, E. E. Sauma, and B. F. Hobbs, "Approximations in power transmission planning: Implications for the cost and performance of renewable portfolio standards," J. Regul. Econ., vol. 43, no. 3, pp. 305-338, 2013.
-
(2013)
J. Regul. Econ
, vol.43
, Issue.3
, pp. 305-338
-
-
Munoz, F.D.1
Sauma, E.E.2
Hobbs, B.F.3
-
28
-
-
84929001332
-
Economic analysis of transmission expansion planning with price-responsive demand and quadratic losses by successive LP
-
to be published
-
O. Ozdemir, F. D. Munoz, J. H. Ho, and B. F. Hobbs, "Economic analysis of transmission expansion planning with price-responsive demand and quadratic losses by successive LP," IEEE Trans. Power Syst., 2015, to be published.
-
IEEE Trans. Power Syst 2015
-
-
Ozdemir, O.1
Munoz, F.D.2
Ho, J.H.3
Hobbs, B.F.4
-
29
-
-
82855177769
-
Impact of unit commitment constraints on generation expansion planning with renewables
-
B. Palmintier and M. Webster, "Impact of unit commitment constraints on generation expansion planning with renewables," in Proc. IEEE Power Energy Soc. Gen. Meeting, 2011, pp. 1-7.
-
(2011)
Proc IEEE Power Energy Soc. Gen. Meeting
, pp. 1-7
-
-
Palmintier, B.1
Webster, M.2
-
30
-
-
84873281992
-
Benefits of chronological optimization in capacity planning for electricity markets," in
-
C. I. Nweke, F. Leanez, G. R. Drayton, and M. Kolhe, "Benefits of chronological optimization in capacity planning for electricity markets," in Proc. IEEE Int. Conf. Power Syst. Technol. (POWERCON), 2012, pp. 1-6.
-
(2012)
Proc IEEE Int. Conf. Power Syst. Technol. (POWERCON
, pp. 1-6
-
-
Nweke, C.I.1
Leanez, F.2
Drayton, G.R.3
Kolhe, M.4
-
31
-
-
84872854951
-
Accommodating variability in generation planning
-
Feb
-
A. Shortt, J. Kiviluoma, and M. O'Malley, "Accommodating variability in generation planning," IEEE Trans. Power Syst., vol. 28, no. 1, pp. 158-169, Feb. 2013.
-
(2013)
IEEE Trans. Power Syst
, vol.28
, Issue.1
, pp. 158-169
-
-
Shortt, A.1
Kiviluoma, J.2
O'Malley, M.3
-
32
-
-
79951518184
-
Determining optimal electricity technology mix with high level of wind power penetration
-
C. De Jonghe, E. Delarue, R. Belmans, andW. Dhaeseleer, "Determining optimal electricity technology mix with high level of wind power penetration," Appl. Energy, vol. 88, no. 6, pp. 2231-2238, 2011.
-
(2011)
Appl. Energy
, vol.88
, Issue.6
, pp. 2231-2238
-
-
De Jonghe, C.1
Delarue, E.2
Belmans, W.3
Dhaeseleer, R.4
-
33
-
-
84906497552
-
Temporal versus stochastic granularity in thermal generation capacity planning with wind power
-
Sep
-
S. Jin, A. Botterud, and S. M. Ryan, "Temporal versus stochastic granularity in thermal generation capacity planning with wind power," IEEE Trans. Power Syst., vol. 29, no. 5, pp. 2033-2041, Sep. 2014.
-
(2014)
IEEE Trans. Power Syst
, vol.29
, Issue.5
, pp. 2033-2041
-
-
Jin, S.1
Botterud, A.2
Ryan, S.M.3
-
34
-
-
84988222702
-
Flexibility in generation planning: Identifying key operating constraints
-
Aug
-
B. Palmintier, "Flexibility in generation planning: Identifying key operating constraints," in Proc. Power Syst. Comput. Conf. (PSCC), Aug. 2014, pp. 1-7.
-
(2014)
Proc. Power Syst. Comput. Conf. (PSCC
, pp. 1-7
-
-
Palmintier, B.1
-
35
-
-
84960306415
-
-
CAISO, Final 2014 flexible capacity needs assessment
-
CAISO, "Final 2014 flexible capacity needs assessment," CAISO, Folsom, CA, USA, Tech. Rep., 2014 [Online]. Available: http://www. caiso.com/Documents/Final-2014-FlexCapacityNeedsAssessment.pdf
-
(2014)
CAISO, Folsom, CA, USA, Tech. Rep
-
-
-
36
-
-
0001168877
-
Simulation de l'exploitation d'un parc de machines thermiques de production d'electricite couple a des stations de pompage
-
H. Baleriaux, E. Jamoulle, and F. L. de Guertechin, "Simulation de l'exploitation d'un parc de machines thermiques de production d'electricite couple a des stations de pompage," Revue E, vol. 5, no. 7, pp. 225-245, 1967.
-
(1967)
Revue e
, vol.5
, Issue.7
, pp. 225-245
-
-
Baleriaux, H.1
Jamoulle, E.2
De Guertechin, F.L.3
-
37
-
-
0015281960
-
Power system simulation model based on probability analysis
-
Jan
-
R. R. Booth, "Power system simulation model based on probability analysis," IEEE Trans. Power App. Syst., vol. 91, no. 1, pp. 62-69, Jan. 1972.
-
(1972)
IEEE Trans. Power App. Syst
, vol.91
, Issue.1
, pp. 62-69
-
-
Booth, R.R.1
-
38
-
-
0026822131
-
Combining analytical models and Monte-Carlo techniques in probabilistic power system analysis
-
Feb
-
M. Pereira, M. Maceira, G. Oliveira, and L. Pinto, "Combining analytical models and Monte-Carlo techniques in probabilistic power system analysis," IEEE Trans. Power Syst., vol. 7, no. 1, pp. 265-272, Feb. 1992.
-
(1992)
IEEE Trans. Power Syst
, vol.7
, Issue.1
, pp. 265-272
-
-
Pereira, M.1
Maceira, M.2
Oliveira, G.3
Pinto, L.4
-
39
-
-
0033340486
-
Stochastic programming-based bounding of expected production costs for multiarea electric power systems
-
B. F. Hobbs and Y. D. Ji, "Stochastic programming-based bounding of expected production costs for multiarea electric power systems," Oper. Res., vol. 47, no. 6, pp. 836-848, 1999.
-
(1999)
Oper. Res
, vol.47
, Issue.6
, pp. 836-848
-
-
Hobbs, B.F.1
Ji, Y.D.2
-
40
-
-
0024767252
-
Comparison of probabilistic production cost simulation methods
-
Nov
-
M. Lin, A. Breipohl, and F. Lee, "Comparison of probabilistic production cost simulation methods," IEEE Trans. Power Syst., vol. 4, no. 4, pp. 1326-1334, Nov. 1989.
-
(1989)
IEEE Trans. Power Syst
, vol.4
, Issue.4
, pp. 1326-1334
-
-
Lin, M.1
Breipohl, A.2
Lee, F.3
-
41
-
-
0034186748
-
Multi-period probabilistic production cost model including dispatch constraints
-
May
-
J. Pérez-Ruiz and A. J. Conejo, "Multi-period probabilistic production cost model including dispatch constraints," IEEE Trans. Power Syst., vol. 15, no. 2, pp. 502-507, May 2000.
-
(2000)
IEEE Trans. Power Syst
, vol.15
, Issue.2
, pp. 502-507
-
-
Pérez-Ruiz, J.1
Conejo, A.J.2
-
42
-
-
0026204750
-
A concise method for calculating expected unserved energy in generating system reliability analysis
-
Aug
-
S. Fockens, A. van Wijk, W. Turkenburg, and C. Singh, "A concise method for calculating expected unserved energy in generating system reliability analysis," IEEE Trans. Power Syst., vol. 6, no. 3, pp. 1085-1091, Aug. 1991.
-
(1991)
IEEE Trans. Power Syst
, vol.6
, Issue.3
, pp. 1085-1091
-
-
Fockens, S.1
Van Wijk, A.2
Turkenburg, W.3
Singh, C.4
-
43
-
-
0001281946
-
Optimization methods for electric utility resource planning
-
B. F. Hobbs, "Optimization methods for electric utility resource planning," Eur. J. Oper. Res., vol. 83, no. 1, pp. 1-20, 1995.
-
(1995)
Eur. J. Oper. Res
, vol.83
, Issue.1
, pp. 1-20
-
-
Hobbs, B.F.1
-
44
-
-
84869440562
-
Regional energy deployment system (ReEDS)
-
Golden, CO, USA, NREL/TP-6A2-46534
-
W. Short et al., "Regional energy deployment system (ReEDS)," Nat. Renew. Energy Lab., Golden, CO, USA, NREL/TP-6A2-46534, 2011.
-
(2011)
Nat. Renew. Energy Lab
-
-
Short, W.1
-
46
-
-
84945449020
-
-
ICF
-
ICF. (2013). Integrated Planning Model Brochure [Online]. Available: http://www.icfi.com/insights/products-And-Tools/ipm
-
(2013)
Integrated Planning Model Brochure
-
-
-
47
-
-
84945478233
-
-
EIA
-
EIA. (2013). MARKAL Technology Database and Model [Online]. Available: http://www.epa.gov/nrmrl/appcd/climate-change/markal.htm
-
(2013)
MARKAL Technology Database and Model
-
-
-
48
-
-
84891561294
-
An engineeringeconomic approach to transmission planning under market and regulatory uncertainties:WECC case study
-
Jan
-
F. D. Munoz, B. F. Hobbs, J. Ho, and S. Kasina, "An engineeringeconomic approach to transmission planning under market and regulatory uncertainties:WECC case study," IEEE Trans. Power Syst., vol. 29, no. 1, pp. 307-317, Jan. 2014.
-
(2014)
IEEE Trans. Power Syst
, vol.29
, Issue.1
, pp. 307-317
-
-
Munoz, F.D.1
Hobbs, B.F.2
Ho, J.3
Kasina, S.4
-
50
-
-
84973560452
-
New bounding and decomposition methods forMILP investment problems: Multi-Area transmission and generation planning under policy constraints
-
Albuquerque, NM, USA, No. SAND2014-4398J
-
F. D. Munoz, B. F. Hobbs, and J. P. Watson, "New bounding and decomposition methods forMILP investment problems: Multi-Area transmission and generation planning under policy constraints," Sandia Nat. Lab. (SNL-NM), Albuquerque, NM, USA, No. SAND2014-4398J, 2014.
-
(2014)
Sandia Nat. Lab. (SNL-NM)
-
-
Munoz, F.D.1
Hobbs, B.F.2
Watson, J.P.3
-
51
-
-
84946499591
-
A scalable solution framework for stochastic transmission and generation planning problems
-
F. D. Munoz and J.-P. Watson, "A scalable solution framework for stochastic transmission and generation planning problems," Comput. Manage. Sci., pp. 1-28, doi: 10.1007/s10287-015-0229-y.
-
Comput. Manage. Sci
, pp. 1-28
-
-
Munoz, F.D.1
Watson, J.-P.2
-
52
-
-
84931570501
-
Optimizing your options: Extracting the full economic value of transmission when planning under uncertainty
-
F. D. Munoz, J.-P. Watson, and B. F. Hobbs, "Optimizing your options: Extracting the full economic value of transmission when planning under uncertainty," Elect. J., vol. 28, no. 5, pp. 26-38, 2015.
-
(2015)
Elect. J
, vol.28
, Issue.5
, pp. 26-38
-
-
Munoz, F.D.1
Watson, J.-P.2
Hobbs, B.F.3
-
53
-
-
79959569428
-
Reaching consensus in the definition of photovoltaics capacity credit in the USA: A practical application of satellite-derived solar resource data
-
Mar
-
R. Perez, M. Taylor, T. Hoff, and J. Ross, "Reaching consensus in the definition of photovoltaics capacity credit in the USA: A practical application of satellite-derived solar resource data," IEEE J. Sel. Topics Appl. Earth Observ. Remote Sens., vol. 1, no. 1, pp. 28-33, Mar. 2008.
-
(2008)
IEEE J. Sel. Topics Appl. Earth Observ. Remote Sens
, vol.1
, Issue.1
, pp. 28-33
-
-
Perez, R.1
Taylor, M.2
Hoff, T.3
Ross, J.4
-
54
-
-
56749164300
-
Comparing photovoltaic capacity value metrics: A case study for the city of Toronto
-
S. Pelland and I. Abboud, "Comparing photovoltaic capacity value metrics: A case study for the city of Toronto," Prog. Photovoltaics Res. Appl., vol. 16, no. 8, pp. 715-724, 2008.
-
(2008)
Prog. Photovoltaics Res. Appl
, vol.16
, Issue.8
, pp. 715-724
-
-
Pelland, S.1
Abboud, I.2
-
55
-
-
84884594759
-
Changes in the economic value of photovoltaic generation at high penetration levels: A pilot case study of California
-
Oct
-
A. Mills and R. Wiser, "Changes in the economic value of photovoltaic generation at high penetration levels: A pilot case study of California," IEEE J. Photovoltaics, vol. 3, no. 4, pp. 1394-1402, Oct. 2013.
-
(2013)
IEEE J. Photovoltaics
, vol.3
, Issue.4
, pp. 1394-1402
-
-
Mills, A.1
Wiser, R.2
-
56
-
-
84924905416
-
Advanced methods for incorporating solar energy technologies into electric sector capacity-expansion models: Literature review and analysis
-
Golden, CO, USA, Tech. Rep. NREL/TP-6A20-61185
-
P. Sullivan, K. Eurek, and R. Margolis, Advanced methods for incorporating solar energy technologies into electric sector capacity-expansion models: Literature review and analysis, NREL, Golden, CO, USA, Tech. Rep. NREL/TP-6A20-61185, 2014 [Online]. Available: http://www.nrel. gov/docs/fy14osti/61185.pdf
-
(2014)
NREL
-
-
Sullivan, P.1
Eurek, K.2
Margolis, R.3
-
57
-
-
84915741476
-
Summary of time period-based and other approximation methods for determining the capacity value of wind and solar in the United States: September 2010-February 2012
-
Golden, CO, USA, Tech. Rep. NREL/SR-5500-54338
-
J. Rogers and K. Porter, "Summary of time period-based and other approximation methods for determining the capacity value of wind and solar in the United States: September 2010-February 2012," Nat. Renew. Energy Lab., Golden, CO, USA, Tech. Rep. NREL/SR-5500-54338, 2012 [Online]. Available: http://www.nrel.gov/docs/fy12osti/54338.pdf
-
(2012)
Nat. Renew. Energy Lab
-
-
Rogers, J.1
Porter, K.2
-
58
-
-
84960220000
-
-
PNNL, Richland, WA, USA, Tech. Rep. PNNL-20823
-
S. J. Smith, A. H. Mizrahi, J. F. Karas, and M. Nathan, "US renewable futures in the GCAM," PNNL, Richland, WA, USA, Tech. Rep. PNNL-20823, 2011 [Online]. Available: http://www.pnnl.gov/main/publications/external/technical-reports/PNNL-20823.pdf
-
(2011)
US Renewable Futures in the GCAM
-
-
Smith, S.J.1
Mizrahi, A.H.2
Karas, J.F.3
Nathan, M.4
-
59
-
-
84912142349
-
Representation of the solar capacity value in the ReEDS capacity expansion model
-
B. Sigrin, P. Sullivan, E. Ibanez, and R. Margolis, "Representation of the solar capacity value in the ReEDS capacity expansion model," in Proc. 40th IEEE Photovoltaic Spec. Conf. (PVSC), 2014, pp. 1480-1485.
-
(2014)
Proc. 40th IEEE Photovoltaic Spec. Conf. (PVSC)
, pp. 1480-1485
-
-
Sigrin, B.1
Sullivan, P.2
Ibanez, E.3
Margolis, R.4
-
60
-
-
84857064679
-
High-resolution modeling of the western North American power system demonstrates low-cost and low-carbon futures
-
J. Nelson et al., "High-resolution modeling of the western North American power system demonstrates low-cost and low-carbon futures," Energy Policy, vol. 43, pp. 436-447, 2012.
-
(2012)
Energy Policy
, vol.43
, pp. 436-447
-
-
Nelson, J.1
-
62
-
-
77951129083
-
-
NREL
-
NREL. (2015). National Solar Radiation Data Base [Online]. Available: http://rredc.nrel.gov/solar/old-data/nsrdb/
-
(2015)
National Solar Radiation Data Base
-
-
-
63
-
-
84960297828
-
-
NREL
-
NREL. (2015). PVWatts Calculator [Online]. Available: http://pvwatts. nrel.gov/
-
(2015)
PVWatts Calculator
-
-
-
64
-
-
84924272004
-
Integrating solar PV in utility system operations
-
Argonne, IL, USA, Tech. Rep. ANL/DIS-13/18 Oct
-
A. Mills, A. Botterud, J. Wu, Z. Zhou, B. M. Hodge, and M. Heaney, "Integrating solar PV in utility system operations," Argonne Nat. Lab., Argonne, IL, USA, Tech. Rep. ANL/DIS-13/18, Oct. 2013. [Online]. Available: http://www.osti.gov/scitech/biblio/1107495
-
(2013)
Argonne Nat. Lab
-
-
Mills, A.1
Botterud, A.2
Wu, J.3
Zhou, Z.4
Hodge, B.M.5
Heaney, M.6
-
65
-
-
67650089726
-
Creating the dataset for the western wind and solar integration study (U.S.A.)
-
Jun
-
C. Potter, D. Lew, J. McCaa, S. Cheng, S. Eichelberger, and E. Grimit, "Creating the dataset for the western wind and solar integration study (U.S.A.)," Wind Eng., vol. 32, no. 4, pp. 325-338, Jun. 2008.
-
(2008)
Wind Eng
, vol.32
, Issue.4
, pp. 325-338
-
-
Potter, C.1
Lew, D.2
McCaa, J.3
Cheng, S.4
Eichelberger, S.5
Grimit, E.6
-
66
-
-
84867723903
-
The economics of planning electricity transmission to accommodate renewables: Using two-stage optimisation to evaluate flexibility and the cost of disregarding uncertainty
-
A. H. van der Weijde and B. F. Hobbs, "The economics of planning electricity transmission to accommodate renewables: Using two-stage optimisation to evaluate flexibility and the cost of disregarding uncertainty," Energy Econ., vol. 34, no. 6, pp. 2089-2101, 2012.
-
(2012)
Energy Econ
, vol.34
, Issue.6
, pp. 2089-2101
-
-
Weijde Der Van, A.H.1
Hobbs, B.F.2
-
67
-
-
84869873450
-
Correlated wind-power production and electric load scenarios for investment decisions
-
L. Baringo and A. Conejo, "Correlated wind-power production and electric load scenarios for investment decisions," Appl. Energy, vol. 101, pp. 475-482, 2013.
-
(2013)
Appl. Energy
, vol.101
, pp. 475-482
-
-
Baringo, L.1
Conejo, A.2
-
68
-
-
84906504333
-
A new approach to model load levels in electric power systems with high renewable penetration
-
Sep
-
S. Wogrin, P. Duenas, A. Delgadillo, and J. Reneses, "A new approach to model load levels in electric power systems with high renewable penetration," IEEE Trans. Power Syst., vol. 29, no. 5, pp. 2210-2218, Sep. 2014.
-
(2014)
IEEE Trans. Power Syst
, vol.29
, Issue.5
, pp. 2210-2218
-
-
Wogrin, S.1
Duenas, P.2
Delgadillo, A.3
Reneses, J.4
-
69
-
-
84860504837
-
Integration of renewable energy into present and future energy systems
-
O. Edenhofer et al., Eds. Cambridge, U.K.: Cambridge Univ. Press
-
R. Sims et al., "Integration of renewable energy into present and future energy systems," in IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation, O. Edenhofer et al., Eds. Cambridge, U.K.: Cambridge Univ. Press., 2011.
-
(2011)
IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation
-
-
Sims, R.1
-
70
-
-
84864518789
-
-
New York, NY, USA, Springer
-
W. E. Hart, C. Laird, J.-P. Watson, and D. L. Woodruff, Pyomo: Optimization Modeling in Python. New York, NY, USA: Springer, 2012.
-
(2012)
Pyomo: Optimization Modeling in Python
-
-
Hart, W.E.1
Laird, C.2
Watson, J.-P.3
Woodruff, D.L.4
|