-
1
-
-
49649119406
-
Cyber physical systems: Design challenges
-
Orlando, FL, May
-
E. A. Lee, "Cyber physical systems: Design challenges, " in Proc. 11th IEEE Int. Symp. Object Oriented Real-Time Distributed Computing, Orlando, FL, May 2008, pp. 363-369.
-
(2008)
Proc 11th IEEE Int. Symp. Object Oriented Real-Time Distributed Computing
, pp. 363-369
-
-
Lee, E.A.1
-
2
-
-
0030410148
-
On task schedulability in real-time control systems
-
Washington, D. C., Dec.
-
D. Seto, J. P. Lehoczky, L. Sha, and K. G. Shin, "On task schedulability in real-time control systems, " in Proc. 17th IEEE Real-Time Syst. Symp., Washington, D. C., Dec. 1996, pp. 13-21.
-
(1996)
Proc 17th IEEE Real-Time Syst. Symp.
, pp. 13-21
-
-
Seto, D.1
Lehoczky, J.P.2
Sha, L.3
Shin, K.G.4
-
3
-
-
84974687699
-
Scheduling algorithms for multiprogramming in a hard-real-time environment
-
C. L. Liu and J. W. Layland, "Scheduling algorithms for multiprogramming in a hard-real-time environment, " J. ACM, vol. 20, no. 1, pp. 46-61, 1973.
-
(1973)
J. ACM
, vol.20
, Issue.1
, pp. 46-61
-
-
Liu, C.L.1
Layland, J.W.2
-
4
-
-
0037701352
-
How does control timing affect performance?
-
A. Cervin, D. Henriksson, B. Lincoln, J. Eker, and K.-E. A? rzeń, "How does control timing affect performance?" IEEE control Syst. Mag., vol. 23, no. 3, pp. 16-30, 2003.
-
(2003)
IEEE Control Syst. Mag.
, vol.23
, Issue.3
, pp. 16-30
-
-
Cervin, A.1
Henriksson, D.2
Lincoln, B.3
Eker, J.4
Rzeń, K.-E.A.5
-
5
-
-
0031675114
-
Stochastic analysis and control of real-time systems with random time delays
-
J. Nilsson, B. Bernhardsson, and B. Wittenmark, "Stochastic analysis and control of real-time systems with random time delays, " Automatica, vol. 34, no. 1, pp. 57-64, 1998.
-
(1998)
Automatica
, vol.34
, Issue.1
, pp. 57-64
-
-
Nilsson, J.1
Bernhardsson, B.2
Wittenmark, B.3
-
6
-
-
0141642191
-
Stochastic optimal control and analysis of stability of networked control systems with long delay
-
H. Shousong and Z. Qixin, "Stochastic optimal control and analysis of stability of networked control systems with long delay, " Automatica, vol. 39, no. 11, pp. 1877-1884, 2003.
-
(2003)
Automatica
, vol.39
, Issue.11
, pp. 1877-1884
-
-
Shousong, H.1
Qixin, Z.2
-
7
-
-
0035683756
-
Jitter compensation for real-time control systems
-
London, UK, Dec.
-
P. Marti, J. M. Fuertes, G. Fohler, and K. Ramamritham, "Jitter compensation for real-time control systems, " in Proc. 22nd IEEE Real-Time Syst. Symp., London, UK, Dec. 2001, pp. 39-48.
-
(2001)
Proc 22nd IEEE Real-Time Syst. Symp.
, pp. 39-48
-
-
Marti, P.1
Fuertes, J.M.2
Fohler, G.3
Ramamritham, K.4
-
8
-
-
33847253080
-
The jitter margin and its application in the design of real-time control systems
-
Gothenburg, Sweden, Aug.
-
A. Cervin, B. Lincoln, J. Eker, K.-E. Arzén, and G. Buttazzo, "The jitter margin and its application in the design of real-time control systems, " in Proc. 10th Int. Conf. Real-Time and Embedded Computing Syst. and Applicat., Gothenburg, Sweden, Aug. 2004, pp. 1-9.
-
(2004)
Proc 10th Int. Conf. Real-Time and Embedded Computing Syst. and Applicat.
, pp. 1-9
-
-
Cervin, A.1
Lincoln, B.2
Eker, J.3
Arzén, K.-E.4
Buttazzo, G.5
-
9
-
-
77949902197
-
Improving task responsiveness with limited preemptions
-
Mallorca, Spain, Sep.
-
Y. Wu and M. Bertogna, "Improving task responsiveness with limited preemptions, " in Proc. 10th Int. Conf. Emerging Technologies & Factory Automation, Mallorca, Spain, Sep. 2009, pp. 1-8.
-
(2009)
Proc 10th Int. Conf. Emerging Technologies & Factory Automation
, pp. 1-8
-
-
Wu, Y.1
Bertogna, M.2
-
10
-
-
47849130306
-
Comparative assessment and evaluation of jitter control methods
-
Nancy, France, Mar.
-
G. Buttazzo and A. Cervin, "Comparative assessment and evaluation of jitter control methods, " in Proc. 15th Int. Conf. Real-Time Network Syst., Nancy, France, Mar. 2007, pp. 137-144.
-
(2007)
Proc 15th Int. Conf. Real-Time Network Syst.
, pp. 137-144
-
-
Buttazzo, G.1
Cervin, A.2
-
11
-
-
84994521790
-
Task scheduling with feedback latency for real-time control systems
-
Hiroshima, Japan, Oct.
-
B. K. Kim, "Task scheduling with feedback latency for real-time control systems, " in Proc. 5th Int. Conf. Real-Time Computing Syst. and Applicat., Hiroshima, Japan, Oct. 1998, pp. 37-41.
-
(1998)
Proc 5th Int. Conf. Real-Time Computing Syst. and Applicat.
, pp. 37-41
-
-
Kim, B.K.1
-
12
-
-
63449113950
-
Period and deadline selection problem for real-time systems
-
Tucson, AZ, Dec.
-
T. Chantem, X. S. Hu, and M. Lemmon, "Period and deadline selection problem for real-time systems, " in Proc. 28th IEEE Real Time Syst. Symp. (work-inprogress track), Tucson, AZ, Dec. 2007.
-
(2007)
Proc 28th IEEE Real Time Syst. Symp. (Work-inprogress Track)
-
-
Chantem, T.1
Hu, X.S.2
Lemmon, M.3
-
13
-
-
52049125432
-
Period and deadline selection for schedulability in real-time systems
-
Prague, Czech, Jul.
-
T. Chantem, X. Wang, M. D. Lemmon, and X. S. Hu, "Period and deadline selection for schedulability in real-time systems, " in Proc. 20th Euromicro Conf. Real-Time Syst., Prague, Czech, Jul. 2008, pp. 168-177.
-
(2008)
Proc 20th Euromicro Conf. Real-Time Syst.
, pp. 168-177
-
-
Chantem, T.1
Wang, X.2
Lemmon, M.D.3
Hu, X.S.4
-
14
-
-
67249145644
-
Delay-aware period assignment in control systems
-
Barcelona, Spain, Dec.
-
E. Bini and A. Cervin, "Delay-aware period assignment in control systems, " in Proc. 29th IEEE Real-Time Syst. Symp., Barcelona, Spain, Dec. 2008, pp. 291-300.
-
(2008)
Proc 29th IEEE Real-Time Syst. Symp.
, pp. 291-300
-
-
Bini, E.1
Cervin, A.2
-
15
-
-
84929833588
-
Response time driven design of control systems
-
Cape Town, South Africa, Aug.
-
Y. Xu, K.-E. A? rzeń, E. Bini, and A. Cervin, "Response time driven design of control systems, " in Proc. 19th World Congress Int. Federation of Automat. Control, Cape Town, South Africa, Aug. 2014, pp. 6098-6104.
-
(2014)
Proc 19th World Congress Int. Federation of Automat. Control
, pp. 6098-6104
-
-
Xu, Y.1
Rzeń, K.-E.A.2
Bini, E.3
Cervin, A.4
-
16
-
-
78149469554
-
Parameter selection for real-time controllers in resource-constrained systems
-
Y. Wu, G. Buttazzo, E. Bini, and A. Cervin, "Parameter selection for real-time controllers in resource-constrained systems, " IEEE Trans. Ind. Informat., vol. 6, no. 4, pp. 610-620, 2010.
-
(2010)
IEEE Trans. Ind. Informat.
, vol.6
, Issue.4
, pp. 610-620
-
-
Wu, Y.1
Buttazzo, G.2
Bini, E.3
Cervin, A.4
-
17
-
-
79960204163
-
A survey of hard real-time scheduling for multiprocessor systems
-
R. I. Davis and A. Burns, "A survey of hard real-time scheduling for multiprocessor systems, " ACM Computing Surveys (CSUR), vol. 43, no. 4, p. 35, 2011.
-
(2011)
ACM Computing Surveys (CSUR)
, vol.43
, Issue.4
, pp. 35
-
-
Davis, R.I.1
Burns, A.2
-
19
-
-
84880861455
-
Preemptively scheduling hard-real-time sporadic tasks on one processor
-
Lake Buena Vista, FL, Dec.
-
S. K. Baruah, A. K. Mok, and L. E. Rosier, "Preemptively scheduling hard-real-time sporadic tasks on one processor, " in Proc. IEEE Real-Time Syst. Symp., Lake Buena Vista, FL, Dec. 1990, pp. 182-190.
-
(1990)
Proc IEEE Real-Time Syst. Symp.
, pp. 182-190
-
-
Baruah, S.K.1
Mok, A.K.2
Rosier, L.E.3
-
20
-
-
67649382530
-
Period sensitivity analysis and d-p domain feasibility region in dynamic priority systems
-
P. Balbastre, I. Ripoll, and A. Crespo, "Period sensitivity analysis and d-p domain feasibility region in dynamic priority systems, " J. Syst. and Software, vol. 82, no. 7, pp. 1098-1111, 2009.
-
(2009)
J. Syst. and Software
, vol.82
, Issue.7
, pp. 1098-1111
-
-
Balbastre, P.1
Ripoll, I.2
Crespo, A.3
-
21
-
-
68949181754
-
Schedulability analysis for real-time systems with edf scheduling
-
F. Zhang and A. Burns, "Schedulability analysis for real-time systems with edf scheduling, " IEEE Trans. Comput., vol. 58, no. 9, pp. 1250-1258, 2009.
-
(2009)
IEEE Trans. Comput.
, vol.58
, Issue.9
, pp. 1250-1258
-
-
Zhang, F.1
Burns, A.2
-
22
-
-
5644261494
-
Biasing effects in schedulability measures
-
Catania, Sicily, Italy, Jul.
-
E. Bini and G. C. Buttazzo, "Biasing effects in schedulability measures, " in Proc. 16th Euromicro Conf. Real-Time Syst., Catania, Sicily, Italy, Jul. 2004, pp. 196-203.
-
(2004)
Proc 16th Euromicro Conf. Real-Time Syst.
, pp. 196-203
-
-
Bini, E.1
Buttazzo, G.C.2
|