메뉴 건너뛰기




Volumn , Issue , 2015, Pages

Control-performance-driven period and deadline selection for cyber-physical systems

Author keywords

parameter selection; performance optimization; real time control; scheduling analysis

Indexed keywords


EID: 84957706120     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ASCC.2015.7244832     Document Type: Conference Paper
Times cited : (5)

References (22)
  • 3
    • 84974687699 scopus 로고
    • Scheduling algorithms for multiprogramming in a hard-real-time environment
    • C. L. Liu and J. W. Layland, "Scheduling algorithms for multiprogramming in a hard-real-time environment, " J. ACM, vol. 20, no. 1, pp. 46-61, 1973.
    • (1973) J. ACM , vol.20 , Issue.1 , pp. 46-61
    • Liu, C.L.1    Layland, J.W.2
  • 5
    • 0031675114 scopus 로고    scopus 로고
    • Stochastic analysis and control of real-time systems with random time delays
    • J. Nilsson, B. Bernhardsson, and B. Wittenmark, "Stochastic analysis and control of real-time systems with random time delays, " Automatica, vol. 34, no. 1, pp. 57-64, 1998.
    • (1998) Automatica , vol.34 , Issue.1 , pp. 57-64
    • Nilsson, J.1    Bernhardsson, B.2    Wittenmark, B.3
  • 6
    • 0141642191 scopus 로고    scopus 로고
    • Stochastic optimal control and analysis of stability of networked control systems with long delay
    • H. Shousong and Z. Qixin, "Stochastic optimal control and analysis of stability of networked control systems with long delay, " Automatica, vol. 39, no. 11, pp. 1877-1884, 2003.
    • (2003) Automatica , vol.39 , Issue.11 , pp. 1877-1884
    • Shousong, H.1    Qixin, Z.2
  • 10
    • 47849130306 scopus 로고    scopus 로고
    • Comparative assessment and evaluation of jitter control methods
    • Nancy, France, Mar.
    • G. Buttazzo and A. Cervin, "Comparative assessment and evaluation of jitter control methods, " in Proc. 15th Int. Conf. Real-Time Network Syst., Nancy, France, Mar. 2007, pp. 137-144.
    • (2007) Proc 15th Int. Conf. Real-Time Network Syst. , pp. 137-144
    • Buttazzo, G.1    Cervin, A.2
  • 11
    • 84994521790 scopus 로고    scopus 로고
    • Task scheduling with feedback latency for real-time control systems
    • Hiroshima, Japan, Oct.
    • B. K. Kim, "Task scheduling with feedback latency for real-time control systems, " in Proc. 5th Int. Conf. Real-Time Computing Syst. and Applicat., Hiroshima, Japan, Oct. 1998, pp. 37-41.
    • (1998) Proc 5th Int. Conf. Real-Time Computing Syst. and Applicat. , pp. 37-41
    • Kim, B.K.1
  • 13
    • 52049125432 scopus 로고    scopus 로고
    • Period and deadline selection for schedulability in real-time systems
    • Prague, Czech, Jul.
    • T. Chantem, X. Wang, M. D. Lemmon, and X. S. Hu, "Period and deadline selection for schedulability in real-time systems, " in Proc. 20th Euromicro Conf. Real-Time Syst., Prague, Czech, Jul. 2008, pp. 168-177.
    • (2008) Proc 20th Euromicro Conf. Real-Time Syst. , pp. 168-177
    • Chantem, T.1    Wang, X.2    Lemmon, M.D.3    Hu, X.S.4
  • 14
    • 67249145644 scopus 로고    scopus 로고
    • Delay-aware period assignment in control systems
    • Barcelona, Spain, Dec.
    • E. Bini and A. Cervin, "Delay-aware period assignment in control systems, " in Proc. 29th IEEE Real-Time Syst. Symp., Barcelona, Spain, Dec. 2008, pp. 291-300.
    • (2008) Proc 29th IEEE Real-Time Syst. Symp. , pp. 291-300
    • Bini, E.1    Cervin, A.2
  • 16
    • 78149469554 scopus 로고    scopus 로고
    • Parameter selection for real-time controllers in resource-constrained systems
    • Y. Wu, G. Buttazzo, E. Bini, and A. Cervin, "Parameter selection for real-time controllers in resource-constrained systems, " IEEE Trans. Ind. Informat., vol. 6, no. 4, pp. 610-620, 2010.
    • (2010) IEEE Trans. Ind. Informat. , vol.6 , Issue.4 , pp. 610-620
    • Wu, Y.1    Buttazzo, G.2    Bini, E.3    Cervin, A.4
  • 17
    • 79960204163 scopus 로고    scopus 로고
    • A survey of hard real-time scheduling for multiprocessor systems
    • R. I. Davis and A. Burns, "A survey of hard real-time scheduling for multiprocessor systems, " ACM Computing Surveys (CSUR), vol. 43, no. 4, p. 35, 2011.
    • (2011) ACM Computing Surveys (CSUR) , vol.43 , Issue.4 , pp. 35
    • Davis, R.I.1    Burns, A.2
  • 19
    • 84880861455 scopus 로고
    • Preemptively scheduling hard-real-time sporadic tasks on one processor
    • Lake Buena Vista, FL, Dec.
    • S. K. Baruah, A. K. Mok, and L. E. Rosier, "Preemptively scheduling hard-real-time sporadic tasks on one processor, " in Proc. IEEE Real-Time Syst. Symp., Lake Buena Vista, FL, Dec. 1990, pp. 182-190.
    • (1990) Proc IEEE Real-Time Syst. Symp. , pp. 182-190
    • Baruah, S.K.1    Mok, A.K.2    Rosier, L.E.3
  • 20
    • 67649382530 scopus 로고    scopus 로고
    • Period sensitivity analysis and d-p domain feasibility region in dynamic priority systems
    • P. Balbastre, I. Ripoll, and A. Crespo, "Period sensitivity analysis and d-p domain feasibility region in dynamic priority systems, " J. Syst. and Software, vol. 82, no. 7, pp. 1098-1111, 2009.
    • (2009) J. Syst. and Software , vol.82 , Issue.7 , pp. 1098-1111
    • Balbastre, P.1    Ripoll, I.2    Crespo, A.3
  • 21
    • 68949181754 scopus 로고    scopus 로고
    • Schedulability analysis for real-time systems with edf scheduling
    • F. Zhang and A. Burns, "Schedulability analysis for real-time systems with edf scheduling, " IEEE Trans. Comput., vol. 58, no. 9, pp. 1250-1258, 2009.
    • (2009) IEEE Trans. Comput. , vol.58 , Issue.9 , pp. 1250-1258
    • Zhang, F.1    Burns, A.2
  • 22
    • 5644261494 scopus 로고    scopus 로고
    • Biasing effects in schedulability measures
    • Catania, Sicily, Italy, Jul.
    • E. Bini and G. C. Buttazzo, "Biasing effects in schedulability measures, " in Proc. 16th Euromicro Conf. Real-Time Syst., Catania, Sicily, Italy, Jul. 2004, pp. 196-203.
    • (2004) Proc 16th Euromicro Conf. Real-Time Syst. , pp. 196-203
    • Bini, E.1    Buttazzo, G.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.