메뉴 건너뛰기




Volumn 117, Issue , 2016, Pages 29-40

The challenge of introducing sustainability into project management function: Multiple-case studies

Author keywords

Project management; Project success; Sustainability; Sustainability in project management; Triple bottom line

Indexed keywords

HUMAN RESOURCE MANAGEMENT; SURVEYS; SUSTAINABLE DEVELOPMENT;

EID: 84955598919     PISSN: 09596526     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jclepro.2015.12.039     Document Type: Article
Times cited : (106)

References (85)
  • 2
    • 85045115223 scopus 로고    scopus 로고
    • accessed 15.09.13
    • AIPM. Australian Institute of Project Management, 2013. Retrieved from: http://www.aipm.com.au/ (accessed 15.09.13.).
    • (2013)
  • 3
    • 84856611504 scopus 로고    scopus 로고
    • Linking project health to project performance indicators: Multiple case studies of construction projects in Saudi Arabia
    • E.S. Almahmoud, H.K. Doloi, and K. Panuwatwanich Linking project health to project performance indicators: multiple case studies of construction projects in Saudi Arabia Int. J. Proj. Manag. 30 3 2012 296 307
    • (2012) Int. J. Proj. Manag. , vol.30 , Issue.3 , pp. 296-307
    • Almahmoud, E.S.1    Doloi, H.K.2    Panuwatwanich, K.3
  • 4
    • 85045083486 scopus 로고    scopus 로고
    • accessed 15.09.13
    • APM. Association for Project Management, 2013. Retrieved from: http://www.apm.org.uk/BOK6 (accessed 15.09.13.).
    • (2013)
  • 6
    • 0032595622 scopus 로고    scopus 로고
    • Project management: Cost, time and quality, two best guesses and a phenomenon, it is time to accept other success criteria
    • R. Atkinson Project management: cost, time and quality, two best guesses and a phenomenon, it is time to accept other success criteria Int. J. Proj. Manag. 17 6 1999 337 342
    • (1999) Int. J. Proj. Manag. , vol.17 , Issue.6 , pp. 337-342
    • Atkinson, R.1
  • 7
    • 1342264168 scopus 로고    scopus 로고
    • Developing a framework for sustainable development indicators for the mining and minerals industry
    • A. Azapagic Developing a framework for sustainable development indicators for the mining and minerals industry J. Clean. Prod. 12 2004 639 662
    • (2004) J. Clean. Prod. , vol.12 , pp. 639-662
    • Azapagic, A.1
  • 8
    • 77950277757 scopus 로고    scopus 로고
    • Corporate sustainability strategies: Sustainability profiles and maturity levels
    • R.J. Baumgartner, and D. Ebner Corporate sustainability strategies: sustainability profiles and maturity levels Sustain. Dev. 18 2010 76 89
    • (2010) Sustain. Dev. , vol.18 , pp. 76-89
    • Baumgartner, R.J.1    Ebner, D.2
  • 9
    • 0034436588 scopus 로고    scopus 로고
    • Sustainable water management through flexible method management
    • L. Bernhardi, G.E.G. Beroggi, and M.R. Moens Sustainable water management through flexible method management Water Resour. Manag. 14 16 2000 473 495
    • (2000) Water Resour. Manag. , vol.14 , Issue.16 , pp. 473-495
    • Bernhardi, L.1    Beroggi, G.E.G.2    Moens, M.R.3
  • 10
    • 84922653683 scopus 로고    scopus 로고
    • Identification of variables that impact project success in Brazilian companies
    • F.T. Berssaneti, and M.M. Carvalho Identification of variables that impact project success in Brazilian companies Int. J. Proj. Manag. 33 3 2015 638 649
    • (2015) Int. J. Proj. Manag. , vol.33 , Issue.3 , pp. 638-649
    • Berssaneti, F.T.1    Carvalho, M.M.2
  • 11
    • 84905109749 scopus 로고    scopus 로고
    • Ecodesign in project management: A missing link for the integration of sustainability in product development?
    • F.A. Brones, M.M. Carvalho, and E.S. Zancul Ecodesign in project management: a missing link for the integration of sustainability in product development? J. Clean. Prod. 80 1 2014 106 118
    • (2014) J. Clean. Prod. , vol.80 , Issue.1 , pp. 106-118
    • Brones, F.A.1    Carvalho, M.M.2    Zancul, E.S.3
  • 13
    • 84911459251 scopus 로고    scopus 로고
    • Resilience and sustainability of civil infrastructure: Toward a unified approach
    • P. Bocchini, D.M. Frangopol, T. Ummenhofer, and T. Zinke Resilience and sustainability of civil infrastructure: toward a unified approach J. Infrastruct. Syst. 20 2014 1 16
    • (2014) J. Infrastruct. Syst. , vol.20 , pp. 1-16
    • Bocchini, P.1    Frangopol, D.M.2    Ummenhofer, T.3    Zinke, T.4
  • 14
    • 85045114494 scopus 로고    scopus 로고
    • Brasil accessed 27.03.13
    • Brasil, 2013. Rio +20. Retrieved from: http://www.rio20.gov.br/sobre-a-rio-mais-20 (accessed 27.03.13.).
    • (2013) Rio +20
  • 15
    • 84887279738 scopus 로고    scopus 로고
    • Modeling project management performance
    • D.J. Bryde Modeling project management performance Int. J. Qual. Reliab. Manag. 20 2 2003 229 254
    • (2003) Int. J. Qual. Reliab. Manag. , vol.20 , Issue.2 , pp. 229-254
    • Bryde, D.J.1
  • 17
    • 84988449929 scopus 로고    scopus 로고
    • Uma proposta de avaliação da sustentabilidade de projetos na fase de planejamento com base nos princípios lean: Um estudo de caso no segmento de eletrônicos
    • M.A. Buson, R. Laurenti, H. Rozenfeld, and F.A. Forcellini Uma proposta de avaliação da sustentabilidade de projetos na fase de planejamento com base nos princípios lean: um estudo de caso no segmento de eletrônicos 7° CBGDP. São José dos Campos 2009
    • (2009) 7° CBGDP. São José Dos Campos
    • Buson, M.A.1    Laurenti, R.2    Rozenfeld, H.3    Forcellini, F.A.4
  • 18
    • 84890531707 scopus 로고    scopus 로고
    • An investigation of the role of communication in IT projects
    • M.M. Carvalho An investigation of the role of communication in IT projects Int. J. Oper. Prod. Manag. 34 1 2014 36 64
    • (2014) Int. J. Oper. Prod. Manag. , vol.34 , Issue.1 , pp. 36-64
    • Carvalho, M.M.1
  • 20
    • 84911983031 scopus 로고    scopus 로고
    • Impact of risk management on project performance: The importance of soft skills
    • M.M. Carvalho, and R. Rabechini Jr. Impact of risk management on project performance: the importance of soft skills Int. J. Prod. Res. 53 2 2015 321 340
    • (2015) Int. J. Prod. Res. , vol.53 , Issue.2 , pp. 321-340
    • Carvalho, M.M.1    Rabechini, R.2
  • 21
    • 84940440279 scopus 로고    scopus 로고
    • Project management and its effects on project success: Cross-country and cross-industry comparisons
    • M.M. Carvalho, L.A. Patah, and D.S. Bido Project management and its effects on project success: cross-country and cross-industry comparisons Int. J. Proj. Manag. 33 7 2015 1509 1522
    • (2015) Int. J. Proj. Manag. , vol.33 , Issue.7 , pp. 1509-1522
    • Carvalho, M.M.1    Patah, L.A.2    Bido, D.S.3
  • 22
    • 23744452042 scopus 로고    scopus 로고
    • Key performance indicators for measuring construction success
    • A. Chan, and A. Chan Key performance indicators for measuring construction success Benchmarking Int. J. 11 2 2004 203 221
    • (2004) Benchmarking Int. J. , vol.11 , Issue.2 , pp. 203-221
    • Chan, A.1    Chan, A.2
  • 23
    • 25444437737 scopus 로고    scopus 로고
    • Building environmental assessment methods: Redefining intentions and roles
    • R. Cole Building environmental assessment methods: redefining intentions and roles Build. Res. Inf. 33 5 2005 455 467
    • (2005) Build. Res. Inf. , vol.33 , Issue.5 , pp. 455-467
    • Cole, R.1
  • 26
    • 0001073758 scopus 로고
    • Building theories from case study research
    • K.M. Eisenhardt Building theories from case study research Acad. Manag. Rev. 14 4 1989 532 550
    • (1989) Acad. Manag. Rev. , vol.14 , Issue.4 , pp. 532-550
    • Eisenhardt, K.M.1
  • 27
    • 34047207566 scopus 로고    scopus 로고
    • Theory building from cases: Opportunities and challenges
    • K.M. Eisenhardt, and M.E. Graebner Theory building from cases: opportunities and challenges Acad. Manag. J. 50 1 2007 25 32
    • (2007) Acad. Manag. J. , vol.50 , Issue.1 , pp. 25-32
    • Eisenhardt, K.M.1    Graebner, M.E.2
  • 28
    • 70349149757 scopus 로고    scopus 로고
    • Towards developing an improved methodology for evaluating performance and achieving success in construction projects
    • S. Elattar Towards developing an improved methodology for evaluating performance and achieving success in construction projects Sci. Res. Essays 4 6 2009 549 555
    • (2009) Sci. Res. Essays , vol.4 , Issue.6 , pp. 549-555
    • Elattar, S.1
  • 30
    • 85045087432 scopus 로고    scopus 로고
    • accessed 15.05.14
    • ENAA. Engineering Advancement Association of Japan, 2013. Retrieved from: http://www.enaa.or.jp/EN/activities/model.html (accessed 15.05.14.).
    • (2013)
  • 31
    • 57849142478 scopus 로고    scopus 로고
    • Impact of participants' values on construction sustainability
    • R. Fellows, and A. Liu Impact of participants' values on construction sustainability Proc. ICE Eng. Sustain. 161 4 2008 219 227
    • (2008) Proc. ICE Eng. Sustain. , vol.161 , Issue.4 , pp. 219-227
    • Fellows, R.1    Liu, A.2
  • 32
    • 77957885330 scopus 로고    scopus 로고
    • A methodology to identify sustainability indicators in construction project management - Application to infrastructure projects in Spain
    • G. Fernández-Sánchez, and F. Rodríguez-López A methodology to identify sustainability indicators in construction project management - application to infrastructure projects in Spain Ecol. Indic. 10 6 2010 1193 1201
    • (2010) Ecol. Indic. , vol.10 , Issue.6 , pp. 1193-1201
    • Fernández-Sánchez, G.1    Rodríguez-López, F.2
  • 34
    • 84927581479 scopus 로고    scopus 로고
    • Relating sustainable development and project management
    • Retrieved from: (accessed 11.01.13.)
    • R. Gareis, M. Huemann, and A. Martinuzzi Relating sustainable development and project management IRNOP IX, Berlin 2009 1 25 Retrieved from: http://pt.scribd.com/doc/106456206/Gareis-Irnop-2009 (accessed 11.01.13.)
    • (2009) IRNOP IX, Berlin , pp. 1-25
    • Gareis, R.1    Huemann, M.2    Martinuzzi, A.3
  • 36
    • 0002184925 scopus 로고
    • Shifting paradigms for sustainable development: Implications for management theory and research
    • T.N. Gladwin, J.J. Kennelly, T.S. Krause, and J. Kennelly Shifting paradigms for sustainable development: implications for management theory and research Acad. Manag. J. 20 4 1995 874 907
    • (1995) Acad. Manag. J. , vol.20 , Issue.4 , pp. 874-907
    • Gladwin, T.N.1    Kennelly, J.J.2    Krause, T.S.3    Kennelly, J.4
  • 38
    • 9344224062 scopus 로고
    • A natural-resource-based view of the firm
    • S.L. Hart A natural-resource-based view of the firm Acad. Manag. Rev. 20 4 1995 986 1014
    • (1995) Acad. Manag. Rev. , vol.20 , Issue.4 , pp. 986-1014
    • Hart, S.L.1
  • 40
    • 84864455732 scopus 로고    scopus 로고
    • Critical success factors for World Bank projects: An empirical investigation
    • L.A. Ika, A. Diallo, and D. Thuillier Critical success factors for World Bank projects: an empirical investigation Int. J. Proj. Manag. 30 1 2012 105 116
    • (2012) Int. J. Proj. Manag. , vol.30 , Issue.1 , pp. 105-116
    • Ika, L.A.1    Diallo, A.2    Thuillier, D.3
  • 41
    • 85045109871 scopus 로고    scopus 로고
    • IPMA. International Project Management Association accessed 11.08.13
    • IPMA. International Project Management Association, 2013. Retrieved from: http://ipma.ch/resources/ipma-publications/ipma-competence-baseline/ (accessed 11.08.13.).
    • (2013)
  • 42
    • 84873244555 scopus 로고    scopus 로고
    • Proposed framework for sustainability screening of urban transport projects in developing countries: A case study of Accra, Ghana
    • S. Jones, M. Tefe, and S. Appiah-Opoku Proposed framework for sustainability screening of urban transport projects in developing countries: a case study of Accra, Ghana Transp. Res. Part A 49 2013 21 34
    • (2013) Transp. Res. Part A , vol.49 , pp. 21-34
    • Jones, S.1    Tefe, M.2    Appiah-Opoku, S.3
  • 44
    • 84874995285 scopus 로고
    • An evaluation of clients' needs and responsibilities in the construction process
    • S. Kometa, P. Olomolaiye, and F. Harris An evaluation of clients' needs and responsibilities in the construction process Eng. Constr. Archit. Manag. 2 1 1995 57 76
    • (1995) Eng. Constr. Archit. Manag. , vol.2 , Issue.1 , pp. 57-76
    • Kometa, S.1    Olomolaiye, P.2    Harris, F.3
  • 46
    • 0029734237 scopus 로고    scopus 로고
    • Systematizing construction project evaluations
    • M. Kumaraswamy, and A. Thorpe Systematizing construction project evaluations J. Manag. Eng. 12 1 1996 34 39
    • (1996) J. Manag. Eng. , vol.12 , Issue.1 , pp. 34-39
    • Kumaraswamy, M.1    Thorpe, A.2
  • 47
    • 10044296449 scopus 로고    scopus 로고
    • Assessing the sustainability performances of industries
    • C. Labuschagne, A.C. Brent, and R.P.G. Van Erck Assessing the sustainability performances of industries J. Clean. Prod. 13 4 2005 373 385
    • (2005) J. Clean. Prod. , vol.13 , Issue.4 , pp. 373-385
    • Labuschagne, C.1    Brent, A.C.2    Van Erck, R.P.G.3
  • 48
    • 84943458951 scopus 로고
    • Significance of project management structure on development success
    • E.W. Larson, and D.H. Gobeli Significance of project management structure on development success IEEE Trans. Eng. Manag. 36 2 1989 119 125
    • (1989) IEEE Trans. Eng. Manag. , vol.36 , Issue.2 , pp. 119-125
    • Larson, E.W.1    Gobeli, D.H.2
  • 49
    • 58149095847 scopus 로고    scopus 로고
    • Diagnosis of sustainable collaboration in health promotion - A case study
    • Retrieved from: (accessed 20.03.12.)
    • M.T.W. Leurs, I.M. Mur-Veeman, R. Van Der Sar, H.P. Schaalma, and N.K. Vries Diagnosis of sustainable collaboration in health promotion - a case study BMC Public Health 8 2008 Retrieved from: http://www.biomedcentral.com/1471-2458/8/382 (accessed 20.03.12.)
    • (2008) BMC Public Health , vol.8
    • Leurs, M.T.W.1    Mur-Veeman, I.M.2    Van Der Sar, R.3    Schaalma, H.P.4    Vries, N.K.5
  • 50
    • 0033177685 scopus 로고    scopus 로고
    • Criteria of project success: An exploratory re-examination
    • C. Lim, and M. Mohamed Criteria of project success: an exploratory re-examination Int. J. Proj. Manag. 17 4 1999 243 248
    • (1999) Int. J. Proj. Manag. , vol.17 , Issue.4 , pp. 243-248
    • Lim, C.1    Mohamed, M.2
  • 52
    • 84885096802 scopus 로고    scopus 로고
    • Risk-based approaches to sustainability in civil engineering
    • K. Macaskill, and P. Guthrie Risk-based approaches to sustainability in civil engineering Eng. Sustain. 166 ES4 2013 181 190
    • (2013) Eng. Sustain. , vol.166 , Issue.ES4 , pp. 181-190
    • MacAskill, K.1    Guthrie, P.2
  • 53
    • 84929261225 scopus 로고    scopus 로고
    • Using project management as a way to sustainability. from a comprehensive review to a framework definition
    • S. Marcelino-Sádaba, L.F. González-Jaen, and A. Pérez-Ezcurdia Using project management as a way to sustainability. From a comprehensive review to a framework definition J. Clean. Prod. 99 15 2015 1 16
    • (2015) J. Clean. Prod. , vol.99 , Issue.15 , pp. 1-16
    • Marcelino-Sádaba, S.1    González-Jaen, L.F.2    Pérez-Ezcurdia, A.3
  • 55
    • 84890198091 scopus 로고    scopus 로고
    • Exploring the value of project management: Linking project management performance and project success
    • F.A. Mir, and A.H. Pinnington Exploring the value of project management: linking project management performance and project success Int. J. Proj. Manag. 32 2014 202 217
    • (2014) Int. J. Proj. Manag. , vol.32 , pp. 202-217
    • Mir, F.A.1    Pinnington, A.H.2
  • 56
    • 33746527632 scopus 로고    scopus 로고
    • Selection of sustainable rural agriculture projects in South Africa: Case studies in the LandCare programme
    • J. Mulder, and A.C. Brent Selection of sustainable rural agriculture projects in South Africa: case studies in the LandCare programme Eng. Technol. 28 2 2006 55 84
    • (2006) Eng. Technol. , vol.28 , Issue.2 , pp. 55-84
    • Mulder, J.1    Brent, A.C.2
  • 57
    • 0030123663 scopus 로고    scopus 로고
    • The role of project management in achieving project success
    • A.K. Munns, and B.F. Bjeirmi The role of project management in achieving project success Int. J. Proj. Manag. 14 2 1996 81 87
    • (1996) Int. J. Proj. Manag. , vol.14 , Issue.2 , pp. 81-87
    • Munns, A.K.1    Bjeirmi, B.F.2
  • 58
    • 58049139009 scopus 로고    scopus 로고
    • Published by fifth ed. Project Management Institute, Inc. Pennsylvania, USA
    • ® Guide) Published by fifth ed. 2013 Project Management Institute, Inc. Pennsylvania, USA
    • (2013) ® Guide)
    • Project Management Institute, Pmi.1
  • 59
    • 0000259681 scopus 로고
    • Green and competitive: Ending the stalemate
    • M.E. Porter, and C. Linde Green and competitive: ending the stalemate Harvard Bus. Rev. 75 5 - September-October 1995 120 134
    • (1995) Harvard Bus. Rev. , vol.75 , Issue.5 , pp. 120-134
    • Porter, M.E.1    Linde, C.2
  • 60
    • 85045090590 scopus 로고    scopus 로고
    • PRINCE2 accessed 11.08.13
    • ® - Projects in Controlled Environments. Retrieved from: http://www.prince-officialsite.com/home/home.aspx (accessed 11.08.13.)
    • (2013) ® - Projects in Controlled Environments
  • 61
    • 29044435250 scopus 로고    scopus 로고
    • Continuous value enhancement process
    • M.H. Pulaski, and M.J. Horman Continuous value enhancement process J. Constr. Eng. Manag. 131 12 2005 1274 1282
    • (2005) J. Constr. Eng. Manag. , vol.131 , Issue.12 , pp. 1274-1282
    • Pulaski, M.H.1    Horman, M.J.2
  • 64
    • 84928211824 scopus 로고    scopus 로고
    • Integrating sustainability issues into project management
    • M.A. Sánchez Integrating sustainability issues into project management J. Clean. Prod. 96 2015 319 330
    • (2015) J. Clean. Prod. , vol.96 , pp. 319-330
    • Sánchez, M.A.1
  • 65
    • 84858833410 scopus 로고    scopus 로고
    • Incorporating sustainability into contractor evaluation and team formation in the built environment
    • J. Sarkis, L.M. Meade, and A.R. Presley Incorporating sustainability into contractor evaluation and team formation in the built environment J. Clean. Prod. 31 2012 40 53
    • (2012) J. Clean. Prod. , vol.31 , pp. 40-53
    • Sarkis, J.1    Meade, L.M.2    Presley, A.R.3
  • 67
    • 85045122864 scopus 로고    scopus 로고
    • ®, why is project management weak? the art and science of project management
    • ®, why is project management weak? The art and science of project management PMI Global Congress Proceeding 2011
    • (2011) PMI Global Congress Proceeding
    • Shenhar, A.1
  • 69
    • 0035735411 scopus 로고    scopus 로고
    • Project success: A multidimensional strategic concept
    • A. Shenhar, D. Dvir, O. Levy, and A.C. Maltz Project success: a multidimensional strategic concept Long Range Plan. J. 34 2001 699 725
    • (2001) Long Range Plan. J. , vol.34 , pp. 699-725
    • Shenhar, A.1    Dvir, D.2    Levy, O.3    Maltz, A.C.4
  • 70
    • 84970958504 scopus 로고    scopus 로고
    • Sustainability in project management: Reality bites
    • A.J.G. Silvius, R. Schipper, and S. Nedeski Sustainability in project management: reality bites PM World J. 2 2 2013 1 14
    • (2013) PM World J. , vol.2 , Issue.2 , pp. 1-14
    • Silvius, A.J.G.1    Schipper, R.2    Nedeski, S.3
  • 71
    • 81755174151 scopus 로고    scopus 로고
    • An overview of sustainability assessment methodologies
    • R.K. Singh, H.R. Murty, S.K. Gupta, and A.K. Dikshit An overview of sustainability assessment methodologies Ecol. Indic. 15 1 2012 281 299
    • (2012) Ecol. Indic. , vol.15 , Issue.1 , pp. 281-299
    • Singh, R.K.1    Murty, H.R.2    Gupta, S.K.3    Dikshit, A.K.4
  • 72
    • 0142260575 scopus 로고    scopus 로고
    • Towards indicators for institutional sustainability: Lessons from an analysis of Agenda 21
    • J.H. Spangenberg, S. Pfahl, and K. Deller Towards indicators for institutional sustainability: lessons from an analysis of Agenda 21 Ecol. Indic. 2 12 2002 61 77
    • (2002) Ecol. Indic. , vol.2 , Issue.12 , pp. 61-77
    • Spangenberg, J.H.1    Pfahl, S.2    Deller, K.3
  • 74
    • 77949488670 scopus 로고    scopus 로고
    • Feasibility of verbal analysis application to solving the problems of investment in construction
    • L. Ustinovichius, and et al. Feasibility of verbal analysis application to solving the problems of investment in construction Autom. Constr. 19 3 2010 375 384
    • (2010) Autom. Constr. , vol.19 , Issue.3 , pp. 375-384
    • Ustinovichius, L.1
  • 75
    • 84988418951 scopus 로고    scopus 로고
    • Verbal analysis of the investment risk in construction
    • L. Ustinovichius, and D. Kochin Verbal analysis of the investment risk in construction J. Bus. Econ. Manag. 4 4 2003 228 234
    • (2003) J. Bus. Econ. Manag. , vol.4 , Issue.4 , pp. 228-234
    • Ustinovichius, L.1    Kochin, D.2
  • 76
    • 0035546534 scopus 로고    scopus 로고
    • Indicators of sustainable production: Framework and methodology
    • V. Veleva, and M. Ellenbecker Indicators of sustainable production: framework and methodology J. Clean. Prod. 9 2001 519 549
    • (2001) J. Clean. Prod. , vol.9 , pp. 519-549
    • Veleva, V.1    Ellenbecker, M.2
  • 78
    • 84878736855 scopus 로고    scopus 로고
    • Impact of relationship value on project portfolio success: Investigating the moderating effects of portfolio characteristics and external turbulence
    • M. Voss, and A. Kock Impact of relationship value on project portfolio success: investigating the moderating effects of portfolio characteristics and external turbulence Int. J. Proj. Manag. 31 2013 847 861
    • (2013) Int. J. Proj. Manag. , vol.31 , pp. 847-861
    • Voss, M.1    Kock, A.2
  • 80
    • 84894430534 scopus 로고    scopus 로고
    • Whole life project management approach to sustainability
    • N. Wang, K. Wei, and H. Sun Whole life project management approach to sustainability J. Manag. Eng. 30 April 2014 246 255
    • (2014) J. Manag. Eng. , vol.30 , Issue.APRIL , pp. 246-255
    • Wang, N.1    Wei, K.2    Sun, H.3
  • 83
    • 33749569777 scopus 로고
    • Measurement of project success
    • A. Wit Measurement of project success Proj. Manag. 6 3 1988 164 170
    • (1988) Proj. Manag. , vol.6 , Issue.3 , pp. 164-170
    • Wit, A.1
  • 84
    • 67650345730 scopus 로고    scopus 로고
    • A framework model for assessing sustainability impacts of urban development
    • Y. Xing, R.M.W. Horner, M.A. El-Haram, and J. Bebbington A framework model for assessing sustainability impacts of urban development Account. Forum 33 3 2009 209 224
    • (2009) Account. Forum , vol.33 , Issue.3 , pp. 209-224
    • Xing, Y.1    Horner, R.M.W.2    El-Haram, M.A.3    Bebbington, J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.