메뉴 건너뛰기




Volumn 142, Issue 1, 2016, Pages

Biogeography-Based Optimization Algorithm for Optimal Operation of Reservoir Systems

Author keywords

Biogeography based optimization; Genetic algorithm; Nonlinear programming; Optimization; Reservoirs

Indexed keywords

ALGORITHMS; ECOLOGY; FUNCTIONS; GENETIC ALGORITHMS; HEURISTIC ALGORITHMS; NONLINEAR PROGRAMMING; OPTIMAL SYSTEMS; PETROLEUM RESERVOIRS; PROBLEM SOLVING; RESERVOIRS (WATER);

EID: 84951037293     PISSN: 07339496     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)WR.1943-5452.0000558     Document Type: Article
Times cited : (87)

References (51)
  • 1
    • 34248577020 scopus 로고    scopus 로고
    • Honey-bee mating optimization (HBMO) algorithm for optimal reservoir operation.
    • Afshar, A., Bozorg Haddad, O., Mariño, M. A., and Adams, B. J. (2007). "Honey-bee mating optimization (HBMO) algorithm for optimal reservoir operation." J. Franklin Inst., 344(5), 452-462.
    • (2007) J. Franklin Inst. , vol.344 , Issue.5 , pp. 452-462
    • Afshar, A.1    Bozorg Haddad, O.2    Mariño, M.A.3    Adams, B.J.4
  • 2
    • 0036718426 scopus 로고    scopus 로고
    • Climate change and water resources in Lebanon and the Middle East
    • Bou-Zeid, E., and El-Fadel, M. (2002). "Climate change and water resources in Lebanon and the Middle East." J. Water Resour. Plann. Manage., 10.1061/(ASCE)0733-9496(2002)128:5(343), 343-355.
    • (2002) J. Water Resour. Plann. Manage. , vol.5 , Issue.343 , pp. 343-355
    • Bou-Zeid, E.1    El-Fadel, M.2
  • 3
    • 48649084544 scopus 로고    scopus 로고
    • Optimum rehabilitation strategy of water distribution systems using the HBMO algorithm.
    • Haddad O, Adams B.J., Mariño M.A.(2008a). "Optimum rehabilitation strategy of water distribution systems using the HBMO algorithm.". J. Water Supply: Res. Technol.-AQUA 57(5) 327-350.
    • (2008) J. Water Supply: Res. Technol.-AQUA , vol.57 , Issue.5 , pp. 327-350
    • Bozorg Haddad, O.1    Adams, B.J.2    Mariño, M.A.3
  • 4
    • 55549127591 scopus 로고    scopus 로고
    • Designoperation of multi-hydropower reservoirs: HBMO approach.
    • Bozorg Haddad, O., Afshar, A., and Mariño, M. A. (2008b). "Designoperation of multi-hydropower reservoirs: HBMO approach." Water Resour. Manage., 22(12), 1709-1722.
    • (2008) Water Resour Manage. , vol.22 , Issue.12 , pp. 1709-1722
    • Bozorg Haddad, O.1    Afshar, A.2    Mariño, M.A.3
  • 7
    • 76749154555 scopus 로고    scopus 로고
    • Optimal design of stepped spillways using the HBMO algorithm.
    • Bozorg Haddad, O., Mirmomeni, M., and Mariño, M. A. (2010a). "Optimal design of stepped spillways using the HBMO algorithm." Civ. Eng. Environ. Syst., 27(1), 81-94.
    • (2010) Civ. Eng. Environ. Syst. , vol.27 , Issue.1 , pp. 81-94
    • Bozorg Haddad, O.1    Mirmomeni, M.2    Mariño, M.A.3
  • 8
    • 77956717086 scopus 로고    scopus 로고
    • Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/ unconstrained resources.
    • Bozorg Haddad, O., Mirmomeni, M., Zarezadeh Mehrizi, M., and Mariño, M. A. (2010b). "Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/ unconstrained resources." Comput. Optim. Appl., 47(1), 97-128.
    • (2010) Comput. Optim. Appl. , vol.47 , Issue.1 , pp. 97-128
    • Bozorg Haddad, O.1    Mirmomeni, M.2    Zarezadeh Mehrizi, M.3    Mariño, M.A.4
  • 12
    • 84927699773 scopus 로고    scopus 로고
    • Application of the water cycle algorithm to the optimal operation of reservoir systems.
    • Bozorg-Haddad, O. B., Moravej, M., and Loáiciga, H. A. (2014b). "Application of the water cycle algorithm to the optimal operation of reservoir systems." J. Irrig. Drain. Eng., 10.1061/(ASCE)IR.1943-4774.0000832, 04014064.
    • (2014) J. Irrig. Drain. Eng.
    • Bozorg-Haddad, O.B.1    Moravej, M.2    Loáiciga, H.A.3
  • 13
    • 70349275877 scopus 로고    scopus 로고
    • Multi-objective evolutionary algorithm for operating parallel reservoir system.
    • Chang, L. C., and Chang, F. J. (2009). "Multi-objective evolutionary algorithm for operating parallel reservoir system." J. Hydrol., 377(1), 12-20.
    • (2009) J. Hydrol. , vol.377 , Issue.1 , pp. 12-20
    • Chang, L.C.1    Chang, F.J.2
  • 14
    • 84894084328 scopus 로고    scopus 로고
    • Application of multimodal optimization for uncertainty estimation of computationally expensive hydrologic models
    • Cho, H., and Olivera, F. (2012). "Application of multimodal optimization for uncertainty estimation of computationally expensive hydrologic models." J. Water Resour. Plann. Manage., 10.1061/(ASCE)WR .1943-5452.0000330, 313-321.
    • (2012) J. Water Resour. Plann. Manage. , pp. 313-321
    • Cho, H.1    Olivera, F.2
  • 15
    • 84875722852 scopus 로고
    • Application of DDDP in water resources planning
    • Dept. of Civil Engineering, Univ. of Illinois at Urbana-Champaign, Champaign, IL
    • Chow, V. T., and Cortes-Rivera, G. (1974). "Application of DDDP in water resources planning." Research Rep., Dept. of Civil Engineering, Univ. of Illinois at Urbana-Champaign, Champaign, IL.
    • (1974) Research Rep.
    • Chow, V.T.1    Cortes-Rivera, G.2
  • 16
    • 79960107256 scopus 로고    scopus 로고
    • Effect of utility function curvature of Young's bargaining method on the design of WDNs.
    • Fallah-Mehdipour, E., Bozorg Haddad, O., Beygi, S., and Mariño, M. A. (2011a). "Effect of utility function curvature of Young's bargaining method on the design of WDNs." Water Resour. Manage., 25(9), 2197-2218.
    • (2011) Water Resour. Manage. , vol.25 , Issue.9 , pp. 2197-2218
    • Fallah-Mehdipour, E.1    Bozorg Haddad, O.2    Beygi, S.3    Mariño, M.A.4
  • 17
    • 80055013141 scopus 로고    scopus 로고
    • MOPSO algorithm and its application in multipurpose multireservoir operations.
    • Fallah-Mehdipour, E., Bozorg Haddad, O., and Mariño, M. A. (2011b). "MOPSO algorithm and its application in multipurpose multireservoir operations." J. Hydroinf., 13(4), 794-811.
    • (2011) J. Hydroinf. , vol.13 , Issue.4 , pp. 794-811
    • Fallah-Mehdipour, E.1    Bozorg Haddad, O.2    Mariño, M.A.3
  • 18
    • 84867464144 scopus 로고    scopus 로고
    • Real-time operation of reservoir system by genetic programming.
    • Fallah-Mehdipour, E., Bozorg Haddad, O., and Mariño, M. A. (2012a). "Real-time operation of reservoir system by genetic programming." Water Resour. Manage., 26(14), 4091-4103.
    • (2012) Water Resour. Manage. , vol.26 , Issue.14 , pp. 4091-4103
    • Fallah-Mehdipour, E.1    Bozorg Haddad, O.2    Mariño, M.A.3
  • 19
    • 84873587242 scopus 로고    scopus 로고
    • Developing reservoir operational decision rule by genetic programming.
    • Fallah-Mehdipour, E., Bozorg Haddad, O., and Mariño, M. A. (2013a). "Developing reservoir operational decision rule by genetic programming." J. Hydroinf., 15(1), 103-119.
    • (2013) J. Hydroinf. , vol.15 , Issue.1 , pp. 103-119
    • Fallah-Mehdipour, E.1    Bozorg Haddad, O.2    Mariño, M.A.3
  • 20
    • 84879123761 scopus 로고    scopus 로고
    • Extraction of multicrop planning rules in a reservoir system: Application of evolutionary algorithms.
    • Fallah-Mehdipour, E., Bozorg Haddad, O., and Mariño, M. A. (2013b). "Extraction of multicrop planning rules in a reservoir system: Application of evolutionary algorithms." J. Irrig. Drain. Eng., 10.1061/(ASCE) IR.1943-4774.0000572, 490-498.
    • (2013) J. Irrig. Drain. Eng. , pp. 490-498
    • Fallah-Mehdipour, E.1    Bozorg Haddad, O.2    Mariño, M.A.3
  • 21
    • 80255123850 scopus 로고    scopus 로고
    • Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO.
    • Fallah-Mehdipour, E., Bozorg Haddad, O., Rezapour Tabari, M. M., and Mariño, M. A. (2012b). "Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO." Expert Syst. Appl., 39(3), 2794-2803.
    • (2012) Expert Syst. Appl. , vol.39 , Issue.3 , pp. 2794-2803
    • Fallah-Mehdipour, E.1    Bozorg Haddad, O.2    Rezapour Tabari, M.M.3    Mariño, M.A.4
  • 22
    • 84941614466 scopus 로고    scopus 로고
    • Unintended consequences of involving stakeholders too late: Case study in multi-objective management
    • Farmer, M., Benson, A., McMahon, G., Principe, J., and Middleton, M. (2015). "Unintended consequences of involving stakeholders too late: Case study in multi-objective management." J. Water Resour. Plann. Manage., 10.1061/(ASCE)WR.1943-5452.0000512, 05015003.
    • (2015) J. Water Resour. Plann. Manage.
    • Farmer, M.1    Benson, A.2    McMahon, G.3    Principe, J.4    Middleton, M.5
  • 23
    • 84896309162 scopus 로고    scopus 로고
    • Optimal real-time operation of multipurpose urban reservoirs: Case study in Singapore
    • Galelli, S., Goedbloed, A., Schwanenberg, D., and van Overloop, P. J. (2014). "Optimal real-time operation of multipurpose urban reservoirs: Case study in Singapore." J. Water Resour. Plann. Manage., 10.1061/ (ASCE)WR.1943-5452.0000342, 511-523.
    • (2014) J. Water Resour. Plann. Manage. , pp. 511-523
    • Galelli, S.1    Goedbloed, A.2    Schwanenberg, D.3    van Overloop, P.J.4
  • 24
    • 84872112924 scopus 로고    scopus 로고
    • Design and economic optimization of shell-and-tube heat exchangers using biogeography-based (BBO) algorithm.
    • Hadidi, A., and Nazari, A. (2013). "Design and economic optimization of shell-and-tube heat exchangers using biogeography-based (BBO) algorithm." Appl. Therm. Eng., 51(1-2), 1263-1272.
    • (2013) Appl. Therm. Eng. , vol.51 , Issue.1-2 , pp. 1263-1272
    • Hadidi, A.1    Nazari, A.2
  • 25
    • 84867703998 scopus 로고    scopus 로고
    • Biogeography based optimization for optimal meter placement for security constrained state estimation.
    • Jamuna, K., and Swarup, K. S. (2011). "Biogeography based optimization for optimal meter placement for security constrained state estimation." Swarm Evol. Comput., 1(2), 89-96.
    • (2011) Swarm Evol. Comput. , vol.1 , Issue.2 , pp. 89-96
    • Jamuna, K.1    Swarup, K.S.2
  • 26
    • 33750412415 scopus 로고    scopus 로고
    • Single reservoir operating policies using genetic algorithm.
    • Jothiprakash, V., and Shanthi, G. (2006). "Single reservoir operating policies using genetic algorithm." Water Resour. Manage., 20(6), 917-929.
    • (2006) Water esour. Manage. , vol.20 , Issue.6 , pp. 917-929
    • Jothiprakash, V.1    Shanthi, G.2
  • 27
    • 0023293440 scopus 로고
    • Comparison of stochastic and deterministic dynamic programming for reservoir operating rule generation 1
    • Karamouz, M., and Houck, M. H. (1987). "Comparison of stochastic and deterministic dynamic programming for reservoir operating rule generation 1." JAWRA, 23(1), 1-9.
    • (1987) JAWRA , vol.23 , Issue.1 , pp. 1-9
    • Karamouz, M.1    Houck, M.H.2
  • 29
    • 33750384790 scopus 로고    scopus 로고
    • Ant colony optimization for multipurpose reservoir operation.
    • Kumar, D. N., and Reddy,M. J. (2006). "Ant colony optimization for multipurpose reservoir operation." Water Resour. Manage., 20(6), 879-898.
    • (2006) Water Resour. Manage. , vol.20 , Issue.6 , pp. 879-898
    • Kumar, D.N.1    Reddy, M.J.2
  • 30
    • 84951203988 scopus 로고    scopus 로고
    • Lingo 11.0 [Computer software]. Chicago Lindo.
    • Lingo 11.0 [Computer software]. Chicago, Lindo.
  • 31
    • 84941652975 scopus 로고    scopus 로고
    • Impact of waterquality conditions in source reservoirs on the optimal operation of a regional multiquality water-distribution system
    • Mala-Jetmarova, H., Barton, A., and Bagirov, A. (2015). "Impact of waterquality conditions in source reservoirs on the optimal operation of a regional multiquality water-distribution system." J. Water Resour. Plann. Manage., 10.1061/(ASCE)WR.1943-5452.0000523, 04015013.
    • (2015) J. Water Resour. Plann. Manage.
    • Mala-Jetmarova, H.1    Barton, A.2    Bagirov, A.3
  • 32
    • 84950999185 scopus 로고    scopus 로고
    • MATLAB 7.11.0 [Computer software]. Natick MA MathWorks.
    • MATLAB 7.11.0 [Computer software]. Natick, MA, MathWorks.
  • 33
    • 10344261518 scopus 로고    scopus 로고
    • Multiobjective optimization for sustainable groundwater management in semiarid regions
    • McPhee, J., and Yeh, W. W. G. (2004). "Multiobjective optimization for sustainable groundwater management in semiarid regions." J. Water Resour. Plann.Manage., 10.1061/(ASCE)0733-9496(2004)130:6(490), 490-497.
    • (2004) J. Water Resour. Plann.Manage. , pp. 490-497
    • McPhee, J.1    Yeh, W.W.G.2
  • 34
    • 84941654703 scopus 로고    scopus 로고
    • Trade-off analysis among multiple water uses in a hydropower system: Case of São Francisco River basin, Brazil
    • Mendes, L., de Barros, M., Zambon, R., and Yeh, W. (2015). "Trade-off analysis among multiple water uses in a hydropower system: Case of São Francisco River basin, Brazil." J. Water Resour. Plann. Manage., 10.1061/(ASCE)WR.1943-5452.0000527, 04015014.
    • (2015) J. Water Resour. Plann. Manage.
    • Mendes, L.1    de Barros, M.2    Zambon, R.3    Yeh, W.4
  • 35
    • 27744601623 scopus 로고    scopus 로고
    • Reservoir operation using a dynamic programming fuzzy rule-based approach.
    • Mousavi, S. J., Ponnambalam, K., and Karray, F. (2005). "Reservoir operation using a dynamic programming fuzzy rule-based approach." Water Resour. Manage., 19(5), 655-672.
    • (2005) Water Resour. Manage. , vol.19 , Issue.5 , pp. 655-672
    • Mousavi, S.J.1    Ponnambalam, K.2    Karray, F.3
  • 36
    • 0018656420 scopus 로고
    • Constrained differential dynamic programming and its application to multireservoir control.
    • Murray, D. M., and Yakowitz, S. J. (1979). "Constrained differential dynamic programming and its application to multireservoir control." Water Resour. Res., 15(5), 1017-1027.
    • (1979) Water Resour. Res. , vol.15 , Issue.5 , pp. 1017-1027
    • Murray, D.M.1    Yakowitz, S.J.2
  • 37
    • 84860897920 scopus 로고    scopus 로고
    • Optimizing irrigation water allocation and multicrop planning using discrete PSO algorithm
    • Noory, H., Liaghat, A. M., Parsinejad, M., and Bozorg Haddad, O. (2012). "Optimizing irrigation water allocation and multicrop planning using discrete PSO algorithm." J. Irrig. Drain. Eng., 10.1061/(ASCE)IR .1943-4774.0000426, 437-444.
    • (2012) J. Irrig. Drain. Eng. , pp. 437-444
    • Noory, H.1    Liaghat, A.M.2    Parsinejad, M.3    Bozorg Haddad, O.4
  • 38
    • 84939129417 scopus 로고    scopus 로고
    • Real-time multiobjective optimization of operation of water supply systems
    • Odan, F., Ribeiro Reis, L., and Kapelan, Z. (2015). "Real-time multiobjective optimization of operation of water supply systems." J. Water Resour. Plann. Manage., 10.1061/(ASCE)WR.1943-5452.0000515, 04015011.
    • (2015) J. Water Resour. Plann. Manage.
    • Odan, F.1    Ribeiro Reis, L.2    Kapelan, Z.3
  • 40
    • 0014551845 scopus 로고
    • The linear decision rule in reservoir management and design: 1.Development of the stochastic model.
    • Revelle, C., Joeres, E., and Kirby, W. (1969). "The linear decision rule in reservoir management and design: 1. Development of the stochastic model." Water Resour. Res., 5(4), 767-777.
    • (1969) Water Resour. Res. , vol.5 , Issue.4 , pp. 767-777
    • Revelle, C.1    Joeres, E.2    Kirby, W.3
  • 41
    • 84941650904 scopus 로고    scopus 로고
    • Coupled self-adaptive multiobjective differential evolution and network flow algorithm approach for optimal reservoir operation
    • Schardong, A., and Simonovic, S. (2015). "Coupled self-adaptive multiobjective differential evolution and network flow algorithm approach for optimal reservoir operation." J. Water Resour. Plann. Manage., 10.1061/(ASCE)WR.1943-5452.0000525, 04015015.
    • (2015) J. Water Resour. Plann. Manage.
    • Schardong, A.1    Simonovic, S.2
  • 43
    • 84874273630 scopus 로고    scopus 로고
    • Effects of pipe roughness uncertainty on water distribution network performance during its operational period.
    • Seifollahi-Aghmiuni, S., Bozorg Haddad, O., Omid, M. H., and Mariño, M. A. (2013). "Effects of pipe roughness uncertainty on water distribution network performance during its operational period." Water Resour. Manage., 27(5), 1581-1599.
    • (2013) Water Resour. Manage. , vol.27 , Issue.5 , pp. 1581-1599
    • Seifollahi-Aghmiuni, S.1    Bozorg Haddad, O.2    Omid, M.H.3    Mariño, M.A.4
  • 44
    • 84876424983 scopus 로고    scopus 로고
    • Algorithm for increasing the speed of evolutionary optimization and its accuracy in multi-objective problems.
    • Shokri, A., Bozorg Haddad, O., and Mariño, M. A. (2013). "Algorithm for increasing the speed of evolutionary optimization and its accuracy in multi-objective problems." Water Resour. Manage., 27(7), 2231-2249.
    • (2013) Water Resour. Manage. , vol.27 , Issue.7 , pp. 2231-2249
    • Shokri, A.1    Bozorg Haddad, O.2    Mariño, M.A.3
  • 45
    • 57249115093 scopus 로고    scopus 로고
    • Biogeography-based optimization.
    • Simon, D. (2008). "Biogeography-based optimization." IEEE Trans. Evol. Comput., 12(6), 702-713.
    • (2008) IEEE Trans. Evol. Comput. , vol.12 , Issue.6 , pp. 702-713
    • Simon, D.1
  • 46
    • 78751643505 scopus 로고    scopus 로고
    • Analytical and numerical comparisons of biogeography-based optimization and genetic algorithms.
    • Simon, D., Rarick, R., Ergezer, M., and Du, D. (2011). "Analytical and numerical comparisons of biogeography-based optimization and genetic algorithms." Inf. Sci., 181(7), 1224-1248.
    • (2011) Inf. Sci. , vol.181 , Issue.7 , pp. 1224-1248
    • Simon, D.1    Rarick, R.2    Ergezer, M.3    Du, D.4
  • 47
    • 84940254709 scopus 로고    scopus 로고
    • Optimization of conventional rule curves coupled with hedging rules for reservoir operation
    • Taghian, M., Rosbjerg, D., Haghighi, A., and Madsen, H. (2013). "Optimization of conventional rule curves coupled with hedging rules for reservoir operation." J. Water Resour. Plann. Manage., 10.1061/ (ASCE)WR.1943-5452.0000355, 693-698.
    • (2013) J. Water Resour. Plann. Manage. , pp. 693-698
    • Taghian, M.1    Rosbjerg, D.2    Haghighi, A.3    Madsen, H.4
  • 48
    • 0031118203 scopus 로고    scopus 로고
    • No free lunch theorems for optimization.
    • Wolpert, D. H., and Macready, W. G. (1997). "No free lunch theorems for optimization." IEEE Trans. Evol. Comput., 1(1), 67-82.
    • (1997) IEEE Trans. Evol. Comput. , vol.1 , Issue.1 , pp. 67-82
    • Wolpert, D.H.1    Macready, W.G.2
  • 49
    • 58349101519 scopus 로고    scopus 로고
    • Development of reservoir operation policies considering variable agricultural water demands.
    • Zahraie, B., and Hosseini, S. M. (2009). "Development of reservoir operation policies considering variable agricultural water demands." Expert Syst. Appl., 36(3), 4980-4987.
    • (2009) Expert Syst. Appl. , vol.36 , Issue.3 , pp. 4980-4987
    • Zahraie, B.1    Hosseini, S.M.2
  • 50
    • 84896297583 scopus 로고    scopus 로고
    • Optimal operation of large-scale cascaded hydropower systems in the upper reaches of the Yangtze River, China
    • Zhang, R., Zhou, J., Zhang, H., Liao, X., and Wang, X. (2012). "Optimal operation of large-scale cascaded hydropower systems in the upper reaches of the Yangtze River, China." J. Water Resour. Plann. Manage., 10.1061/(ASCE)WR.1943-5452.0000337, 480-495.
    • (2012) J. Water Resour. Plann. Manage. , pp. 480-495
    • Zhang, R.1    Zhou, J.2    Zhang, H.3    Liao, X.4    Wang, X.5
  • 51
    • 84894106514 scopus 로고    scopus 로고
    • Improved dynamic programming for hydropower reservoir operation.
    • Zhao, T., Zhao, J., and Yang, D. (2014). "Improved dynamic programming for hydropower reservoir operation." J. Water Resour. Plann. Manage., 10.1061/(ASCE)WR.1943-5452.0000343, 365-374.
    • (2014) J. Water Resour. Plann. Manage. , pp. 365-374
    • Zhao, T.1    Zhao, J.2    Yang, D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.