메뉴 건너뛰기




Volumn 2002-January, Issue , 2002, Pages 488-493

Job scheduling for prime time vs. non-prime time

Author keywords

Concurrent computing; Delay effects; Educational institutions; Job design; NASA; Parallel machines; Processor scheduling; Runtime; Scheduling algorithm; Time factors

Indexed keywords

CLUSTER COMPUTING; COMPUTER ARCHITECTURE; ECONOMIC AND SOCIAL EFFECTS; NASA; SCHEDULING;

EID: 84948967615     PISSN: 15525244     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/CLUSTR.2002.1137789     Document Type: Conference Paper
Times cited : (16)

References (9)
  • 7
    • 0035363047 scopus 로고    scopus 로고
    • Utilization, predictability, workloads, and user runtime estimates in scheduling the ibm sp2 with backfilling
    • A. W. Mu'alem and D. G. Feitelson. Utilization, predictability, workloads, and user runtime estimates in scheduling the ibm sp2 with backfilling. IEEE Trans. Parallel and Distributed Systems, 12(6), 2001.
    • (2001) IEEE Trans. Parallel and Distributed Systems , vol.12 , Issue.6
    • Mu'alem, A.W.1    Feitelson, D.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.