-
1
-
-
84904685560
-
The impact of stochastic extraction cost on the value of an exhaustible resource: The case of the Alberta oil sands
-
Paper presented at the, Turku, Finland, June 15-18, 2011
-
Almansour, A. and Insley, M. (2011) The impact of stochastic extraction cost on the value of an exhaustible resource: the case of the Alberta oil sands. Paper presented at the Real Options 15th Annual International Conference, Turku, Finland, June 15-18, 2011.
-
(2011)
Real Options 15th Annual International Conference
-
-
Almansour, A.1
Insley, M.2
-
2
-
-
33750081068
-
Estimating the volatility of mining projects considering price and operating cost uncertainties
-
DOI 10.1016/j.resourpol.2006.07.002, PII S0301420706000286
-
Costa Lima, G.A. and Suslick, S.B. (2006) Estimating the volatility of mining projects considering price and operating cost uncertainties. Resources Policy, 31, 86-94. (Pubitemid 44575889)
-
(2006)
Resources Policy
, vol.31
, Issue.2
, pp. 86-94
-
-
Costa Lima, G.A.1
Suslick, S.B.2
-
4
-
-
84905161885
-
-
Available at (accessed October 20, 2011)
-
European Wind Energy Association. (2004) Wind energy-the facts: Vol. 2. Costs and prices. Available at http://www.ewea.org/fileadmin/eweadocuments/ documents/publications/WETF/FactsVolume2.pdf (accessed October 20, 2011).
-
(2004)
Wind Energy-the Facts: Vol. 2. Costs and Prices
-
-
-
5
-
-
44649190367
-
Investment timing and capacity choice for small-scale wind power under uncertainty
-
Paper presented at the, Greece, June 28
-
Fleten, S. and Maribu, K.M. (2004) Investment timing and capacity choice for small-scale wind power under uncertainty. Paper presented at the IASTED International Conference on Power and Energy Systems, Greece, June 28-30, 2004.
-
(2004)
IASTED International Conference on Power and Energy Systems
, vol.30
, pp. 2004
-
-
Fleten, S.1
Maribu, K.M.2
-
6
-
-
33846199123
-
Optimal investment strategies in decentralized renewable power generation under uncertainty
-
DOI 10.1016/j.energy.2006.04.015, PII S0360544206001150
-
Fleten, S., Maribu, K.M. and Wangensteen, I. (2007) Optimal investment strategies in decentralized renewable power generation under uncertainty. Energy, 32(5), 803-815. (Pubitemid 46108357)
-
(2007)
Energy
, vol.32
, Issue.5
, pp. 803-815
-
-
Fleten, S.-E.1
Maribu, K.M.2
Wangensteen, I.3
-
7
-
-
33644789731
-
Finite-horizon equipment replacement analysis
-
DOI 10.1080/07408170500380054, PII V8301138417241
-
Hartman, J.C. and Murphy, A. (2006) Finite-horizon equipment replacement analysis. IIE Transactions, 38(5), 409-419. (Pubitemid 43348020)
-
(2006)
IIE Transactions (Institute of Industrial Engineers)
, vol.38
, Issue.5
, pp. 409-419
-
-
Hartman, J.C.1
Murphy, A.2
-
8
-
-
84863289293
-
Repair and maintenance cost models for MF285 tractor: A case study in central region of Iran
-
Khoub Bakht, G.M., Ahmadi, H., Akram, A. and Karimi, M. (2008) Repair and maintenance cost models for MF285 tractor: a case study in central region of Iran. American-Eurasian Journal of Agriculture and Environmental Science, 4(1), 76-80.
-
(2008)
American-Eurasian Journal of Agriculture and Environmental Science
, vol.4
, Issue.1
, pp. 76-80
-
-
Khoub Bakht, G.M.1
Ahmadi, H.2
Akram, A.3
Karimi, M.4
-
9
-
-
34548862903
-
A real option analysis of investments in hydropower-the case of Norway
-
Kjarland, F. (2007) A real option analysis of investments in hydropower-the case of Norway. Energy Policy, 35, 5901-5908.
-
(2007)
Energy Policy
, vol.35
, pp. 5901-5908
-
-
Kjarland, F.1
-
11
-
-
54849426292
-
The economics of solar power
-
June. Available at The economics of solar power 2161 (accessed November 8, 2011)
-
Lorenz, P., Pinner, D. and Seitz, T. (2008) The economics of solar power. The McKinsey Quarterly, June. Available at http://www.mckinseyquarterly.com/The economics of solar power 2161 (accessed November 8, 2011).
-
(2008)
The McKinsey Quarterly
-
-
Lorenz, P.1
Pinner, D.2
Seitz, T.3
-
12
-
-
54149103457
-
Life cycle assessment of a multi-megawatt wind turbine
-
Martínez, E., Sanz, F., Pellegrini, S., Jiménez, E. and Blanco, J. (2009) Life cycle assessment of a multi-megawatt wind turbine. Renewable Energy, 34, 667-673.
-
(2009)
Renewable Energy
, vol.34
, pp. 667-673
-
-
Martínez, E.1
Sanz, F.2
Pellegrini, S.3
Jiménez, E.4
Blanco, J.5
-
13
-
-
84974285078
-
Investment under uncertainty: The case of replacement investment decisions
-
Mauer, D. and Ott, S. (1995) Investment under uncertainty: the case of replacement investment decisions. Journal of Financial and Quantitative Analysis, 30, 581-605.
-
(1995)
Journal of Financial and Quantitative Analysis
, vol.30
, pp. 581-605
-
-
Mauer, D.1
Ott, S.2
-
14
-
-
0003470219
-
-
Working paper, Massachusetts Institute of Technology, Cambridge, MA.
-
Myers, S.C. andMajd, S. (1983) Calculating abandonment value using option pricing theory. Working paper, Massachusetts Institute of Technology, Cambridge, MA.
-
(1983)
Calculating Abandonment Value Using Option Pricing Theory
-
-
Myers, S.C.1
Majd, S.2
-
15
-
-
84863250215
-
-
Available at (accessed November 8, 2011)
-
New Hampshire Office of Energy and Planning. (2008) Small wind energy systems ordinance. Available at http://www.nh.gov/oep/resourcelibrary/swes/ index.htm (accessed November 8, 2011).
-
(2008)
Small Wind Energy Systems Ordinance
-
-
-
16
-
-
33745728848
-
Geometric Brownian motion and structural breaks in oil prices: A quantitative analysis
-
Postali, F.A.S. and Picchetti, P. (2006) Geometric Brownian motion and structural breaks in oil prices: a quantitative analysis. Energy Economics, 28(4), 506-522.
-
(2006)
Energy Economics
, vol.28
, Issue.4
, pp. 506-522
-
-
Postali, F.A.S.1
Picchetti, P.2
-
17
-
-
43749088478
-
Fuel mix diversification incentives in liberalized electricity markets: A mean-variance portfolio theory approach
-
Roques, F.A., Newbery, D.M. and Nuttall, W.J. (2008) Fuel mix diversification incentives in liberalized electricity markets: a mean-variance portfolio theory approach. Energy Economics, 30, 1831-1849.
-
(2008)
Energy Economics
, vol.30
, pp. 1831-1849
-
-
Roques, F.A.1
Newbery, D.M.2
Nuttall, W.J.3
-
18
-
-
37149053171
-
Decommissioning and equipment replacement of nuclear power plants under uncertainty
-
DOI 10.3327/jnst.44.1347
-
Takashima, R., Naito, Y., Kimura, H. and Madarame, H. (2007) Decommissioning and equipment replacement of nuclear power plants under uncertainty. Journal of Nuclear Science and Technology, 44(11), 1347-1355. (Pubitemid 350260476)
-
(2007)
Journal of Nuclear Science and Technology
, vol.44
, Issue.11
, pp. 1347-1355
-
-
Takashima, R.1
Naito, Y.2
Kimura, H.3
Madarame, H.4
-
19
-
-
84863232375
-
-
Available at (accessed November 16, 2011)
-
The Center for Land Use Interpretation. (2011) Abandoned solar plant. Available at http://ludb.clui.org/ex/i/CA4965/ (accessed November 16, 2011).
-
(2011)
Abandoned Solar Plant
-
-
-
20
-
-
84863275544
-
-
Available at (accessed October 20, 2011)
-
Union of Concerned Scientists. (2011) Production tax credit for renewable energy. Available at http://www.ucsusa.org/cleanenergy/solutions/ bigpicturesolutions/production-tax-credit-for.html (accessed October 20, 2011).
-
(2011)
Production Tax Credit for Renewable Energy
-
-
-
21
-
-
79957996633
-
-
U.S. Energy Information Administration. Available at (accessed September 28, 2011)
-
U.S. Energy Information Administration. (2010a) Electric power annual 2009. Available at http://38.96.246.204/cneaf/electricity/epa/epa.pdf (accessed September 28, 2011).
-
(2010)
Electric Power Annual 2009
-
-
-
22
-
-
79960800548
-
-
Available at (accessed October 14, 2011)
-
U.S. Energy Information Administration. (2010b) Updated capital cost estimates for electricity generation plants. Available at http://www.eia.gov/ oiaf/beck plantcosts/ (accessed October 14, 2011).
-
(2010)
Updated Capital Cost Estimates for Electricity Generation Plants
-
-
-
23
-
-
33646047398
-
Electric power generation planning for inter-related projects: A real options approach
-
Wang, C. and Min, K.J. (2006) Electric power generation planning for inter-related projects: a real options approach. IEEE Transactions on Engineering Management, 53, 312-322.
-
(2006)
IEEE Transactions on Engineering Management
, vol.53
, pp. 312-322
-
-
Wang, C.1
Min, K.J.2
-
24
-
-
57349109975
-
Short-term electric power trading strategies for portfolio optimization
-
Wang, C. and Min, K.J. (2008) Short-term electric power trading strategies for portfolio optimization. The Engineering Economist, 53, 365-379.
-
(2008)
The Engineering Economist
, vol.53
, pp. 365-379
-
-
Wang, C.1
Min, K.J.2
-
25
-
-
77956546408
-
Improving financial performance with hedging via forwards for electric power generation companies
-
Wang, C. and Min, K.J. (2010) Improving financial performance with hedging via forwards for electric power generation companies. The Engineering Economist, 55, 1-22.
-
(2010)
The Engineering Economist
, vol.55
, pp. 1-22
-
-
Wang, C.1
Min, K.J.2
-
26
-
-
84863280582
-
-
Available at (accessed November 8, 2011)
-
WebEcoist.com. (2011) Ten amazingly-abandoned renewable energy plants. Available at http://webecoist.com/2009/05/04/10-abandoned-renewable-energy- plants/ (accessed November 8, 2011).
-
(2011)
Ten Amazingly-abandoned Renewable Energy Plants
-
-
-
27
-
-
84863232374
-
-
Available at (accessed November 8, 2011)
-
Wilkinson, D. (2010) For the sake of green or greed. Available at http://www.lagrandeobserver.com/Opinion/Guest-Columns/For-the-sake-of-green-or- greed (accessed November 8, 2011).
-
(2010)
For the Sake of Green or Greed
-
-
Wilkinson, D.1
-
28
-
-
40749121202
-
-
Available at (accessed October 15, 2011)
-
Wiser, R. and Bolinger, M. (2007) Annual report on U.S. wind power installation, cost, and performance trends: 2006. Available at http://www.nrel.gov/docs/fy07osti/41435.pdf (accessed October 15, 2011).
-
(2007)
Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006
-
-
Wiser, R.1
Bolinger, M.2
-
29
-
-
40749121202
-
-
Available at (accessed October 15, 2011)
-
Wiser, R. and Bolinger, M. (2008) Annual report on U.S. wind power installation, cost, and performance trends: 2007. Available at http://www.nrel.gov/docs/fy08osti/43025.pdf (accessed October 15, 2011).
-
(2008)
Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007
-
-
Wiser, R.1
Bolinger, M.2
-
30
-
-
35848947234
-
Using the federal production tax credit to build a durable market for wind power in the United States
-
Wiser, R., Bolinger, M. and Barbose, G. (2007) Using the federal production tax credit to build a durable market for wind power in the United States. The Electricity Journal, 20, 77-88.
-
(2007)
The Electricity Journal
, vol.20
, pp. 77-88
-
-
Wiser, R.1
Bolinger, M.2
Barbose, G.3
-
31
-
-
0025700089
-
Optimal replacement policy with stochastic maintenance and operation costs
-
DOI 10.1016/0377-2217(90)90317-5
-
Ye, M. (1990) Optimal replacement policywith stochastic maintenance and operation costs. European Journal of Operational Research, 44, 84-94. (Pubitemid 20638481)
-
(1990)
European Journal of Operational Research
, vol.44
, Issue.1
, pp. 84-94
-
-
Ye Meng-Hua1
|